Meadows Project at Andheri East by Jangid Group (P51800048770)
  • Rating: 4.3
  • (43)

Meadows - Andheri East

Jangid Group
Project Details, Configuration & Prices
1 BHK382 Sq.ft. Carpet ₹ 91.32 Lacs All in
Project overview
Meadows Project at Andheri East by Jangid Group (P51800048770) a Project where Sales are currently on Hold with 1 BHK apartments / Flats starting from ₹ 91.32 Lakh onwards

Meadows is a Residential Project Developed by the Jangid group. It is located in Andheri East. The suburb enjoys excellent connectivity to various parts of Mumbai and beyond. The Western Express Highway, Andheri-Ghatkopar Link Road, and Andheri-Kurla Road provide road connectivity to the suburb. Just 20 minutes from Andheri Station and Western Express Highway. 10 minutes to Marol Metro Station and Andheri-Kurla Road. It is a 23 storey tower offering 1 BHK Residences. Singe tower with 3 wings. G+6 podium car parking. Air conditioned homes ikea furnished. More than 20 amenities and facilities which includes grand entrance lobby, rooftop garden, medidadtion and yoga deck. fitness centre, sitting area, jogging track, kid's play area and many more.
Meadows QR Code
Meadows
MahaRERA - P51800048770

Vasant Blossom

₹ 1.7 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Lodha Acenza

₹ 4.88 Crs. onwards
Andheri East
3/4 BHK apartments
View Details

Dynamix Luma

₹ 2.19 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Horizon Heights

₹ 1.33 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Horizon Tower 1

₹ 2.81 Crs. onwards
Andheri East
3 BHK apartments
View Details

Ganga CHS

₹ 1.08 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Kalpataru Vivant North Wing B

₹ 2.16 Crs. onwards
Andheri East
2 BHK apartments
View Details

Kalpataru Vivant North Wing D

₹ 2.15 Crs. onwards
Andheri East
2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Meadows
  • Location:
  • Andheri East, Military Road, Marol
  • Const. Stage:
    Sales on Hold
  • Possession:
    Dec 2026
  • Floors:
    23
Developer Details

Jangid Group

  • Developer:
    Jangid Group
  • Phone:
    +91 22 65074145
  • Website:
    www.jangidgroup.com
  • Address:
  • Jangid House, Jangid Complex, Mira Road East, Dist: Thane- 401107.
Project Ratings
Project Brochures
Brochures of Meadowsby Jangid Group
Project Brochures
  • MPE/Brochures/28943/Meadows Brochure.pdf
Project Amenities
Amenities offred in Meadows
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAir ConditionersAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800048770
RERA Project Name Jangid Meadows
RERA Location 22/1 To 22, Cts No. 22, S No. 32/2
RERA Developer Jangid Home Pvt Ltd
Architect Mahendra Davda And Associates
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 17 Jan 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri East

Facilities & Amenities
Facilities, Amenities & Common areas details of Meadowslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Yet To Start
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Solid Waste Management And Disposal
Yet To Start
Storm Water Drains
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Yet To Start
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in Meadows
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Meadowsby Jangid Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

47802 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

369 apartments in total
Total
369
Booked
67
Available
302

Saleable Area Statistics (Sq. ft.)

137441 Total
Total
137441
Booked
24915
Available
112526
Total 369 apartments in project. 67 apartments booked. 18% apartments booked.
Total 12768.56 saleable area. 2314.66 apartments booked.
18% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202623111000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.57 Sq.mts. ( 383 Sq.ft. )123
1 BHK35.66 Sq.mts. ( 384 Sq.ft. )15
2 BHK48.82 Sq.mts. ( 525 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK58.85 Sq.mts. ( 633 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.57 Sq.mts. ( 103 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop12.41 Sq.mts. ( 134 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.46 Sq.mts. ( 134 Sq.ft. )3
2 Booked66% Booked
66% Booked
Shop12.5 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.54 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.57 Sq.mts. ( 135 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.58 Sq.mts. ( 135 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop22.97 Sq.mts. ( 247 Sq.ft. )2
None Booked0% Booked
0% Booked
158 total apartments / 21 apartments booked. 13% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202623111000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.57 Sq.mts. ( 383 Sq.ft. )41
1 BHK35.66 Sq.mts. ( 384 Sq.ft. )28
7 Booked25% Booked
25% Booked
69 total apartments / 11 apartments booked. 15% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202623111000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.57 Sq.mts. ( 383 Sq.ft. )126
35 Booked27% Booked
27% Booked
1 BHK35.66 Sq.mts. ( 384 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK48.82 Sq.mts. ( 525 Sq.ft. )1
None Booked0% Booked
0% Booked
142 total apartments / 35 apartments booked. 24% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Jangid Group
for Project
Jangid Meadows
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Jangid Group

Jangid Group For almost two decades, “ Jangid Group ” has been serving home seekers through their corporate motto, Creating Landmarks. Today, we are one of the leading real estate developers in Mumbai.We’ve been a trendsetter in Mira Road. Our developments have always been ahead of their times, offering solutions for quality living. We are committed to quality, best Customer service and deliver as per commitments. Traditionally, our core business has been Construction ever since inception.We have pioneered some of the best-known complexes in Mira Road, such as Jangid Complex, Jangid Estate, etc. At a time when Mira Road carried the image of three storey buildings of substandard quality with scarce amenities, we were first to offer seven storey buildings with lifts and ultra modern amenities, creating a landmark. Later, our Flagship projects Jangid Tower and Yamuna Tower, being first ever 14 storey towers, created a history in Mira Road, and a landmark again. Jangid Heights in Thane followed the pool of bench marked projects.Featuring state of the art technology to serve customer needs, our complexes are truly a reflection of quality living and standard lifestyles to match with the contemporaries. Our buildings comprise of good architecture, appropriate designs and the best safety features. We follow international quality construction standards. In nutshell, Jangid means Value for money.