MDM Zion Project at Andheri West by MDM Realty Group (P51800029740)
  • Rating:
  • ()

MDM Zion - Andheri West

MDM Realty Group
Project Details, Configuration & Prices
1 BHK400 Sq.ft. Carpet ₹ 1.70 Cr All In
2 BHK565 Sq.ft. Carpet ₹ 2.50 Cr All In
Project overview
MDM Zion Project at Andheri West by MDM Realty Group (P51800029740) is a Ready Possession Project with 1/2 BHK apartments / Flats starting from ₹ 1.7 Crs onwards

MDM Zion is a 9 storey tower by MDM Realty Group in the prime location of Andheri West. Andheri West is known for its vibrant lifestyle, with several cafes, bars, clubs, and recreational spots that cater to the younger population. The presence of Bollywood studios and media houses also contributes to the area's lively atmosphere. Andheri West is well-connected to other parts of Mumbai through various transportation modes, including the Mumbai suburban railway (Andheri station), metro, buses, and taxis. The presence of the Western Express Highway and Link Road also provides excellent road connectivity to different parts of the city. The project comes up with multiple modern and up to date amenities like Mini-Theatre, Roof Top Lounge, Kids play area, Gymnasium. There are lavishing configurations of 1,2 and 3 BHK in MDM Zion and it's RERA Registered.
MDM Zion QR Code
MDM Zion
MahaRERA - P51800029740

Transcon Triumph - Tower 4

₹ 2.97 Crs. onwards
Andheri West
2/3 BHK apartments
View Details

Adani Linkbay Residences

₹ 3.25 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details

Bharat Altavistas

₹ 5.77 Crs. onwards
Andheri West
3/6 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 3 Crs. onwards
Andheri West
Office BHK apartments
View Details

DLF WestPark

₹ 4.2 Crs. onwards
Andheri West
3 BHK apartments
View Details
Andheri West
3/4 BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    MDM Zion
  • Location:
  • Andheri West, Model Town,4 Bunglow
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open Reserved;
  • Floors:
    9
Developer Details

MDM Realty Group

  • Developer:
    MDM Realty Group
  • Phone:
  • Website:
    https://mdmrealtygroup.com/
  • Address:
  • 1003, Peninsula Park, Plot No A/4, Veera Industrial Estate, Andheri West, Mumbai - 400053, India
Project Ratings
Project Brochures
Brochures of MDM Zionby MDM Realty Group
Project Brochures
  • MPE/Brochures/28764/MDM ZION Brochure Final.pdf
Project Amenities
Amenities offred in MDM Zion
LIFESTYLE AMENITIES
Kid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAir ConditionersKitchen CabinetsKitchen ChimneyModular KitchenGranite PlatformDry Areas
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2023
Revised Possession 01 Jan 1900
Extended Possession 30 Dec 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800029740
RERA Project Name Mdm Zion
RERA Location Cts No 833 Pt, Plot No. 120, Survey No. 141 Pt
RERA Developer Mdm Realty Llp
Architect Ms Sanjay B Shah
Project RERA Details
Project Type Residential / Group Housing
Funding Bank AU SMALL FINANCE BANK LIMITED
Last Modified 31 Jan 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of MDM Zionlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station95% completed
95% Complete
Work Completion By October 2023
Energy management95% completed
95% Complete
Work Completion By October 2023
Fire Protection And Fire Safety Requirements95% completed
95% Complete
Work Completion By October 2023
Landscaping & Tree Planting95% completed
95% Complete
Work Completion By October 2023
Open Parking95% completed
95% Complete
Work Completion By October 2023
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Work Completion By October 2023
Solid Waste Management And Disposal
Work Completion By October 2023
Storm Water Drains95% completed
95% Complete
Work Completion By October 2023
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting95% completed
95% Complete
Work Completion By October 2023
Water Supply95% completed
95% Complete
Work Completion By October 2023
Buildings / Wings in MDM Zion
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of MDM Zionby MDM Realty Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

8934 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

51 apartments in total
Total
51
Booked
0
Available
51

Saleable Area Statistics (Sq. ft.)

24345 Total
Total
24345
Booked
0
Available
24345
Total 51 apartments in project. 0 apartments booked. 0% apartments booked.
Total 2261.7 saleable area. 0 apartments booked.
0% area booked.

Snehsagar Chs Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Snehsagar Chs LtdDec 2023101010034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.16 Sq.mts. ( 400 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )16
None Booked0% Booked
0% Booked
1RK22 Sq.mts. ( 237 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.48 Sq.mts. ( 565 Sq.ft. )12
None Booked0% Booked
0% Booked
3 BHK66.43 Sq.mts. ( 715 Sq.ft. )6
None Booked0% Booked
0% Booked
51 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Snehsagar Chs LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Project Consultants
Channel Partners Registered by Developer
MDM Realty Group
for Project
Mdm Zion
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About MDM Realty Group

MDM Realty Group MDM Realty Group's basic beliefs are at the centre of all they do. Transparency, quality, and innovation. Each project illustrates the strength of high-quality construction, innovation via the use of new technologies, and the assurance of transparent transactions. As a result, we've been able to carve out a position in the market as one of the best construction firms. MDM Realty Group is committed to solving wider challenges such as environmental impact and industry social responsibility.