Mayfair Virar Project at Virar by Mayfair Housing Pvt Ltd (P99000046231)
  • Rating:
  • ()

Mayfair Virar - Virar

Project Details, Configuration & Prices
1 BHK288 Sq.ft. Carpet ₹ 28.99 L ++
1 BHK363 Sq.ft. Carpet ₹ 37.99 L++
1 BHK440 Sq.ft. Carpet ₹ 46 L++
1 BHK456 Sq.ft. Carpet ₹ 48 L++
Project overview
Mayfair Virar Project at Virar by Mayfair Housing Pvt Ltd (P99000046231) is a RERA approved Under Construction Project with RERA ID P99000046231 slated to be ready for possession by Jun 2028 with 1 BHK apartments / Flats starting from N/A onwards

Mayfair Virar Gardens is a thoughtfully planned 22-acre integrated community located in the prime neighbourhood of Virar West, developed by the renowned Mayfair Group. Rising up to G+22 storeys, the project offers smart, well-designed 1 BHK residences in Cluster VI, giving homebuyers a final opportunity to own a modern and efficiently crafted home in a fast-growing suburb. With a possession timeline of March 2026, these homes promise comfort, convenience, and a lifestyle curated for complete living. Designed to promote a healthy and active lifestyle, the project features an impressive array of amenities, including jogging tracks, exercise stations, kids’ playground, cricket practice nets, event lawns, tennis, basketball and volleyball courts, an amphitheatre, and a swimming pool—ensuring recreation for every age group. The large land parcel allows for open green spaces and a well-planned layout, fostering a serene and community-driven environment. Situated in one of the most sought-after pockets of Virar West, Mayfair Virar Gardens enjoys excellent connectivity to essential conveniences such as schools, hospitals, shopping zones, and transport facilities. Backed by MahaRERA registration P99000046231, the project assures transparency and reliability, making it an ideal choice for first-time homebuyers, investors, and families seeking value-driven urban living.
Mayfair Virar QR Code
Mayfair Virar
MahaRERA - P99000046231

Rustomjee Avenue L4

₹ 50.68 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Ekta Parksville

₹ 44.7 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Brooklyn Park

₹ 44.27 Lacs. onwards
Virar
2 BHK apartments
View Details

Poonam Imperial

₹ 32 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Sky City

₹ 29.01 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Poonam Vista

₹ 40.6 Lacs. onwards
Virar
1/2/3 BHK apartments
View Details

Paradise Grandeur

₹ 71.8 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Yash Platina

₹ 41 Lacs. onwards
Virar
1/1½/2 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Mayfair Virar
  • Location:
  • Virar, Virar Agashi Road
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2028
  • Parking:
    Podium;
  • Floors:
    22
Developer Details

  • Developer:
    Mayfair Housing Pvt Ltd
  • Phone:
    022 67232300
  • Website:
    www.mayfairhousing.com
  • Address:
  • 1, Mayfair Meridian, Near St. Blaise Church, Ceasar Road, Off S.V. Road, Amboli, Andheri West, Mumbai - 400 058.
Project Ratings
Project Amenities
Amenities offred in Mayfair Virar
LIFESTYLE AMENITIES
Indoor GamesKid's play areaJogging TrackGymnasiumConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2028
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P99000046231
RERA Project Name Mayfair Virar Gardens Cluster-Vi
RERA Location S No 225 H No 3By2p 4By4p 5P 6P 8P S No 226 H No 3By2p S No 227 H No 2By1p 2By2p 3P 4P 5P
RERA Developer Mayfair Housing
Architect Jai
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 20 Jun 2022
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Virar

Facilities & Amenities
Facilities, Amenities & Common areas details of Mayfair Virarlast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Proposed For Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station20% completed
20% Complete
Proposed For Layout
Energy management
Proposed For Layout
Fire Protection And Fire Safety Requirements60% completed
60% Complete
As Per Cfo Noc
Landscaping & Tree Planting
Proposed For Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Proposed For Layout
Solid Waste Management And Disposal
Proposed For Layout
Storm Water Drains80% completed
80% Complete
Proposed For Layout
Street Lighting
Proposed For Layout
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
Proposed For Layout
Water Conservation, Rain water Harvesting80% completed
80% Complete
Proposed For Layout
Water Supply35% completed
35% Complete
Supply By Vvcmc After Oc
Buildings / Wings in Mayfair Virar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mayfair Virarby Mayfair Housing Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

98889 Sq. ft.

Project Area

7028 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

1504 apartments in total
Total
1504
Booked
920
Available
584

Saleable Area Statistics (Sq. ft.)

465672 Total
Total
465672
Booked
289695
Available
175977
Total 1504 apartments in project. 920 apartments booked. 61% apartments booked.
Total 43262 saleable area. 26913.3 apartments booked.
62% area booked.

Building No 34

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 34Jun 202822101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
None Booked0% Booked
0% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
None Booked0% Booked
0% Booked
172 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 34Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 35

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 35Jun 2028221010012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.2 Sq.mts. ( 250 Sq.ft. )88
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )84
60 Booked71% Booked
71% Booked
172 total apartments / 67 apartments booked. 38% apartments booked.
Work Description in Building Building No 35Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress28% done
28% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 36

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 36Jun 202822101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
43 Booked100% Booked
100% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
126 Booked97% Booked
97% Booked
172 total apartments / 169 apartments booked. 98% apartments booked.
Work Description in Building Building No 36Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress55% done
55% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress77% done
77% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 37

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 37Jun 202822101004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
41 Booked95% Booked
95% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
121 Booked93% Booked
93% Booked
172 total apartments / 162 apartments booked. 94% apartments booked.
Work Description in Building Building No 37Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress55% done
55% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress77% done
77% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 38

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 38Jun 202822101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.2 Sq.mts. ( 250 Sq.ft. )44
None Booked0% Booked
0% Booked
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )84
61 Booked72% Booked
72% Booked
128 total apartments / 61 apartments booked. 47% apartments booked.
Work Description in Building Building No 38Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress36% done
36% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

Building No 39

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 39Jun 202822101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
None Booked0% Booked
0% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
None Booked0% Booked
0% Booked
172 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 39Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress32% done
32% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 40

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 40Jun 202822101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
35 Booked81% Booked
81% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
112 Booked86% Booked
86% Booked
172 total apartments / 147 apartments booked. 85% apartments booked.
Work Description in Building Building No 40Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

Building No 41

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 41Jun 2028221010016
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
41 Booked95% Booked
95% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
117 Booked90% Booked
90% Booked
172 total apartments / 158 apartments booked. 91% apartments booked.
Work Description in Building Building No 41Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 42

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 42Jun 2028221010016
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )43
40 Booked93% Booked
93% Booked
1 BHK T229.3 Sq.mts. ( 315 Sq.ft. )129
116 Booked89% Booked
89% Booked
172 total apartments / 156 apartments booked. 90% apartments booked.
Work Description in Building Building No 42Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Mayfair Housing Pvt Ltd
for Project
Mayfair Virar Gardens Cluster-Vi
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Mayfair Housing Pvt Ltd

Mayfair Housing is in the business of real estate development since – 1964; 50 years. It works with the most modern concepts and techniques in all around functions of the business i.e. construction techniques, architectural or management. Mayfair Housing has a team of dedicated executives and personnels. Mayfair not only believes in hiring the services of well-qualified people but also imparts training to its staff, which has been the key reason for Mayfair Housing being one of the well managed businesses in the industry. Mayfair Housing has predominantly concentrated on developing residential houses in and around the suburbs of Mumbai.