Man Opus Project at Mira Road by Man Realty Ltd (P51700008395)
  • Rating: 4.1
  • (16)

Man Opus - Mira Road

Man Realty Ltd
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
1 BHK-747 Sq.ft.
₹67.23 Lacs
1½ BHK-828 Sq.ft.
₹74.52 Lacs
2 BHK-1044 Sq.ft.
₹93.96 Lacs
Project overview
Man Opus Project at Mira Road by Man Realty Ltd (P51700008395) a Sold Out Project with 1/1½/2 BHK apartments / Flats starting from ₹ 67.23 Lakh onwards

A home at Man Opus is a simple, tangible, value-for-money investment,Sensitive to all that a consumer demands from an excellent opportunity such as that presented by a home here, this latest offering has a peaceful environment, verdant natural beauty and unbeatable infrastructure, all available at prices that are just right. "Man Opus" has 1 BHK, 11/2 BHK and 2 BHK apartments having all the modern amenities. Its located Near Dahisar Check Naka in Mumbai's Western Suburbs , a sought after residential address with a cosmopolitan crowd, beautiful surroundings, easy connectivity.
Man Opus QR Code
Man Opus
MahaRERA - P51700008395

Goldstar Decent Homes

₹ 1.11 Crs. onwards
Mira Road
2 BHK apartments
View Details

Kalpataru Srishti Namaah

₹ 86.68 Lacs. onwards
Mira Road
1/2/3 BHK apartments
View Details

Aaradhya Parkwood

₹ 85.17 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details

Maruti Square

₹ 1.58 Crs. onwards
Mira Road
Office BHK apartments
View Details

127 Raj Homes Tower A

₹ 76 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details

Crescent Western Trade Center Phase 2

₹ 71.4 Lacs. onwards
Mira Road
Office BHK apartments
View Details

127 Raj Homes Tower B & C

₹ 76 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details

Reyansh Ventura

₹ 1 Crs. onwards
Mira Road
Office BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Man Opus
  • Location:
  • Mira Road, Near Dahisar Check Naka
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2016
  • Floors:
    22
Developer Details

Man Realty Ltd

  • Developer:
    Man Realty Ltd
  • Phone:
    022 66477677
  • Website:
    www.manrealty.in
  • Address:
  • 101, Man House, S.V. Road, Vile Parle (W), Mumbai - 400 056.
Project Ratings
Project Amenities
Amenities offred in Man Opus
LIFESTYLE AMENITIES
Outdoor GamesKid's play areaJogging TrackTemplePower BackupHealth ClubOutdoor GamesClub HouseSwimming PoolGymnasiumIndoor GamesHigh speed elevatorsPOP finished wallsVitrified flooringImported Sanitary FittingsIntercom/CCTVGranite PlatformModular KitchenMulti Purpose HallYoga Room
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 30 Aug 2019
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700008395
RERA Project Name Man Opus
RERA Location S. No. 53/1 Pt,Cts No. 1475,1556-1561,1565-1567,1625,1643,1644,1711-1713,1716,1717,1782,1870
RERA Developer Man Global Ltd.
Architect Avinash Mhatre And Associatese
Project RERA Details
Project Type Residential / Group Housing
Funding Bank UNION BANK OF INDIA
Last Modified 15 Jan 2019
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Mira Road

Facilities & Amenities
Facilities, Amenities & Common areas details of Man Opuslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Shall Be Done Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station5% completed
5% Complete
Work In Progress
Energy management
Shall Be Done Prior To Oc
Fire Protection And Fire Safety Requirements10% completed
10% Complete
Work In Progress
Landscaping & Tree Planting
Shall Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Shall Be Done Prior To Oc
Solid Waste Management And Disposal
Shall Be Done Prior To Oc
Storm Water Drains
Shall Be Done Prior To Oc
Street Lighting
Shall Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water15% completed
15% Complete
Work In Progress
Water Conservation, Rain water Harvesting
Shall Be Done Prior To Oc
Water Supply
Shall Be Done Prior To Oc
Buildings / Wings in Man Opus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Man Opusby Man Realty Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

120276 Sq. ft.

Project Area

13751 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

1252 apartments in total
Total
1252
Booked
463
Available
789

Saleable Area Statistics (Sq. ft.)

396210 Total
Total
396210
Booked
207873
Available
188337
Total 1252 apartments in project. 463 apartments booked. 36% apartments booked.
Total 36808.76 saleable area. 19311.85 apartments booked.
52% area booked.

A - Bldg 8,9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A - Bldg 8,9Jan 1900221111091
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.59 Sq.mts. ( 362 Sq.ft. )41
32 Booked78% Booked
78% Booked
1.5 BHK40.7 Sq.mts. ( 438 Sq.ft. )125
80 Booked64% Booked
64% Booked
166 total apartments / 112 apartments booked. 67% apartments booked.
Work Description in Building A - Bldg 8,9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C1 - Bldg 2, 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C1 - Bldg 2, 3Jan 1900231111061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.21 Sq.mts. ( 357 Sq.ft. )44
39 Booked88% Booked
88% Booked
1.5 BHK40.32 Sq.mts. ( 434 Sq.ft. )44
35 Booked79% Booked
79% Booked
2 BHK50.53 Sq.mts. ( 544 Sq.ft. )88
70 Booked79% Booked
79% Booked
SHOP 132.91 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 218.91 Sq.mts. ( 204 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 327.59 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 417.27 Sq.mts. ( 186 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 514.85 Sq.mts. ( 160 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 614.85 Sq.mts. ( 160 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 717.05 Sq.mts. ( 184 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 827.59 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 939.19 Sq.mts. ( 422 Sq.ft. )1
None Booked0% Booked
0% Booked
185 total apartments / 148 apartments booked. 80% apartments booked.
Work Description in Building C1 - Bldg 2, 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress45% done
45% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress45% done
45% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C2 - Bldg 4,5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C2 - Bldg 4,5Jan 1900231111061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.21 Sq.mts. ( 357 Sq.ft. )44
35 Booked79% Booked
79% Booked
1.5 BHK40.32 Sq.mts. ( 434 Sq.ft. )44
31 Booked70% Booked
70% Booked
2 BHK50.53 Sq.mts. ( 544 Sq.ft. )88
72 Booked81% Booked
81% Booked
SHOP 132.91 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 218.91 Sq.mts. ( 204 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 327.59 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 417.27 Sq.mts. ( 186 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 514.85 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 614.85 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 717.05 Sq.mts. ( 184 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 827.59 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 938.86 Sq.mts. ( 418 Sq.ft. )1
None Booked0% Booked
0% Booked
185 total apartments / 138 apartments booked. 74% apartments booked.
Work Description in Building C2 - Bldg 4,5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress65% done
65% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D1 - Bldg 7 - Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D1 - Bldg 7 - Phase 2Jan 1900191111015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK40.88 Sq.mts. ( 440 Sq.ft. )32
13 Booked40% Booked
40% Booked
2 BHK51.07 Sq.mts. ( 550 Sq.ft. )18
6 Booked33% Booked
33% Booked
50 total apartments / 19 apartments booked. 38% apartments booked.
Work Description in Building D1 - Bldg 7 - Phase 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress32% done
32% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress85% done
85% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress32% done
32% Booked

D2- Bldg 6 - Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D2- Bldg 6 - Phase 2Jan 1900221111019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )21
13 Booked61% Booked
61% Booked
1.5 BHK40.9 Sq.mts. ( 440 Sq.ft. )42
19 Booked45% Booked
45% Booked
63 total apartments / 32 apartments booked. 50% apartments booked.
Work Description in Building D2- Bldg 6 - Phase 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress44% done
44% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress55% done
55% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress85% done
85% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress55% done
55% Booked

E - Bldg 1 - Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E - Bldg 1 - Phase 2Jan 1900221111012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )18
4 Booked22% Booked
22% Booked
1.5 BHK40.61 Sq.mts. ( 437 Sq.ft. )21
10 Booked47% Booked
47% Booked
39 total apartments / 14 apartments booked. 35% apartments booked.
Work Description in Building E - Bldg 1 - Phase 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure

Rental-Bldg R1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rental-Bldg R1Jan 1900241010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK14.86 Sq.mts. ( 160 Sq.ft. )549
None Booked0% Booked
0% Booked
549 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rental-Bldg R1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rental-Bldg R2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rental-Bldg R2Jan 19005101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK14.86 Sq.mts. ( 160 Sq.ft. )15
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rental-Bldg R2Completion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Man Realty Ltd
for Project
Man Opus
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Man Realty Ltd

Man Realty Ltd Ever since its inception in 1982, Man Realty has constructed success story after success story. Imagination, commitment and a global way of thinking have resulted in 50 high profile projects. Always thinking ahead, Man is now making footprints in the domain of IT Parks, SEZs, Residential Complexes and Commercial Complexes. All fulfilling a singular objective of offering world-class, living and working spaces to discerning consumers.