Mahakali Hills Project at Andheri East by Mohid Constructions (P51800031191)
  • Rating: 4.2
  • (31)

Mahakali Hills - Andheri East

Project Details, Configuration & Prices
1 BHK325 Sq.ft. Carpet ₹ 70 Lakhs ++
Project overview
Mahakali Hills Project at Andheri East by Mohid Constructions (P51800031191) is a RERA approved Under Construction Project with RERA ID P51800031191 slated to be ready for possession by Dec 2026 with 1 BHK apartments / Flats starting from ₹ 74 Lakh onwards

Mahakali Hills is a Residential Project by Mohid Constructions. It is a 7 storey tower located at Andheri East. 3.5 kms From Andheri Station. Easy access to bus and metro. 500 meters from JVLR. 1 km from Seepz. 6 km from Airport. It offers 1 BHK Residences. GR level is 23 floors high. Unobstructed views. 225 ft above sea level. Amenities include Garden, Children’s play Area & Gym. RERA approved project.
Mahakali Hills QR Code
Mahakali Hills
MahaRERA - P51800031191

Vasant Blossom

₹ 1.7 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Lodha Acenza

₹ 4.88 Crs. onwards
Andheri East
3/4 BHK apartments
View Details

Dynamix Luma

₹ 2.19 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Horizon Heights

₹ 1.33 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Horizon Tower 1

₹ 2.81 Crs. onwards
Andheri East
3 BHK apartments
View Details

Ganga CHS

₹ 1.08 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Kalpataru Vivant North Wing B

₹ 2.16 Crs. onwards
Andheri East
2 BHK apartments
View Details

Kalpataru Vivant North Wing D

₹ 2.15 Crs. onwards
Andheri East
2 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Mahakali Hills
  • Location:
  • Andheri East, Sunder Nagar, Mahakali Caves Road, Kondivita
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Floors:
    7
Developer Details

  • Developer:
    Mohid Constructions
  • Phone:
  • Website:
  • Address:
  • Sunder Nagar, Utkarsha CHS, Mahakali Caves Road, Kondivita, Andheri East
Project Ratings
Project Brochures
Brochures of Mahakali Hillsby Mohid Constructions
Project Brochures
  • MPE/Brochures/29130/Mahakali Hills Brochure.pdf
Project Amenities
Amenities offred in Mahakali Hills
LIFESTYLE AMENITIES
Power BackupKid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2026
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800031191
RERA Project Name Mahakali Hills
RERA Location 554 A Pt
RERA Developer Mohid Construction Co
Project RERA Details
Project Type Others
Funding Bank
Last Modified 07 Jan 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri East

Facilities & Amenities
Facilities, Amenities & Common areas details of Mahakali Hillslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Adani
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
FITNESS CENTER
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
As Per Mcgm
Buildings / Wings in Mahakali Hills
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahakali Hillsby Mohid Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

44103 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

203 apartments in total
Total
203
Booked
154
Available
49

Saleable Area Statistics (Sq. ft.)

58041 Total
Total
58041
Booked
45952
Available
12089
Total 203 apartments in project. 154 apartments booked. 75% apartments booked.
Total 5392.11 saleable area. 4269.03 apartments booked.
79% area booked.

A WING-REHAB

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WING-REHAB
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building A WING-REHABCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

B WING-REHAB

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WING-REHAB
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building B WING-REHABCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20248101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.19 Sq.mts. ( 325 Sq.ft. )43
42 Booked97% Booked
97% Booked
Office space9.1 Sq.mts. ( 98 Sq.ft. )3
2 Booked66% Booked
66% Booked
Office space9.94 Sq.mts. ( 107 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space10.03 Sq.mts. ( 108 Sq.ft. )2
2 Booked100% Booked
100% Booked
Office space12.54 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space12.91 Sq.mts. ( 139 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space17.93 Sq.mts. ( 193 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space18.02 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space18.86 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
54 total apartments / 48 apartments booked. 88% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20248101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.19 Sq.mts. ( 325 Sq.ft. )66
65 Booked98% Booked
98% Booked
Office space9.1 Sq.mts. ( 98 Sq.ft. )5
3 Booked60% Booked
60% Booked
Office space10.03 Sq.mts. ( 108 Sq.ft. )3
1 Booked33% Booked
33% Booked
Office space12.54 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space15.51 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space17.93 Sq.mts. ( 193 Sq.ft. )2
1 Booked50% Booked
50% Booked
Office space18.86 Sq.mts. ( 203 Sq.ft. )3
1 Booked33% Booked
33% Booked
Office space19.32 Sq.mts. ( 208 Sq.ft. )3
None Booked0% Booked
0% Booked
84 total apartments / 72 apartments booked. 85% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress36% done
36% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingDec 20248101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.19 Sq.mts. ( 325 Sq.ft. )28
26 Booked92% Booked
92% Booked
1 BHK32.79 Sq.mts. ( 353 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space30.29 Sq.mts. ( 326 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space8.45 Sq.mts. ( 91 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space9.1 Sq.mts. ( 98 Sq.ft. )3
2 Booked66% Booked
66% Booked
Office space10.03 Sq.mts. ( 108 Sq.ft. )2
1 Booked50% Booked
50% Booked
Office space13.94 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space15.98 Sq.mts. ( 172 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space18.86 Sq.mts. ( 203 Sq.ft. )3
None Booked0% Booked
0% Booked
Office space19.23 Sq.mts. ( 207 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space19.32 Sq.mts. ( 208 Sq.ft. )3
None Booked0% Booked
0% Booked
Office space20.16 Sq.mts. ( 217 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space29.54 Sq.mts. ( 318 Sq.ft. )16
None Booked0% Booked
0% Booked
Office space29.64 Sq.mts. ( 319 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space29.73 Sq.mts. ( 320 Sq.ft. )2
None Booked0% Booked
0% Booked
65 total apartments / 34 apartments booked. 52% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Excavation
work-in-progress20% done
20% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Mohid Constructions
for Project
Mahakali Hills
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Mohid Constructions