M19-Matunga Central Project at Matunga by M Realty (P51900007305)
  • Rating: 3.4
  • (14)

M19-Matunga Central - Matunga

M Realty
Project Details, Configuration & Prices
3 BHK1174 Sq.ft. Carpet ₹ 6 Cr ++
Project overview
M19-Matunga Central Project at Matunga by M Realty (P51900007305) a Sold Out Project with 3 BHK apartments / Flats starting from ₹ 5.79 Crs onwards

M19-Matunga Central is a Residential Developed Project by M Realty. It is located at Matunga Central. The area is well-connected to different parts of Mumbai through various transportation modes. Matunga has its own railway station, which is part of the Central Line of Mumbai's suburban railway network. Additionally, it is conveniently located near major roadways, including the Eastern Express Highway and Sion-Matunga Link Road, allowing for easy accessibility by road. it is a 21 storey tower offering 1,2, 3 and 4 BHK Residences. 3 level car park and services in basement. 1 car park per flat. Panoramic sea views.Well ventilated and vaastu compliant homes. OC received homed ready to occupy. Amenities include Therapeutic Sky Walk Way, Multi Utility Community Space, Panorama Observatory Sundeck and many more.
M19-Matunga Central QR Code
M19-Matunga Central
MahaRERA - P51900007305

Kalpataru Matru Ashish

₹ 10.02 Crs. onwards
Matunga
3/Duplex BHK apartments
View Details

Godrej Five Gardens

₹ 10.26 Crs. onwards
Matunga
3 BHK apartments
View Details

Lodha Divino

₹ 4.22 Crs. onwards
Matunga
2/3/4 BHK apartments
View Details

Lodha Vero

₹ 11.34 Crs. onwards
Matunga
3/4/5 BHK apartments
View Details

Rustomjee 180 Bayview

₹ 4.15 Crs. onwards
Matunga
2/3/4 BHK apartments
View Details

EL Mejor

₹ 2.37 Crs. onwards
Matunga
1½/2/3 BHK apartments
View Details

Tridhaatu Athena

₹ 6.92 Crs. onwards
Matunga
3/Duplex BHK apartments
View Details

Ruparel Iris

₹ 4.15 Crs. onwards
Matunga
2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    M19-Matunga Central
  • Location:
  • Matunga, Dr. Baba Saheb Ambedkar Road
  • Const. Stage:
    Sold Out
  • Possession:
    Jun 2023
  • Floors:
    21
Developer Details

M Realty

  • Developer:
    M Realty
  • Phone:
    022 2433 1090
  • Website:
    www.mrealty.in
  • Address:
  • C-202, butterfly, Bhavani Shankar road, Opp, Brahman Seva Mandal, Dadar West
Project Ratings
Project Brochures
Brochures of M19-Matunga Centralby M Realty
Project Brochures
  • MPE/Brochures/28832/M19 Matunga E Residence Brochure.pdf
Project Amenities
Amenities offred in M19-Matunga Central
LIFESTYLE AMENITIES
Indoor GamesKid's play areaHigh speed elevatorsGrand entrance lobbyPOP finished wallsImported Sanitary FittingsVitrified flooringKitchen CabinetsGranite PlatformYoga Room
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51900007305
RERA Project Name M 19
RERA Location 210/B
RERA Developer Suvidha Lifespaces
Architect Kapil S Bakshi
Project RERA Details
Project Type Residential / Group Housing
Funding Bank AXIS BANK
Last Modified 10 Jul 2018
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Matunga

Facilities & Amenities
Facilities, Amenities & Common areas details of M19-Matunga Centrallast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Socityoffice And Fitness Center As Per Mcgm Approv
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room As Per Mcgm Approval
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
As Per Cfo Noc Under Ground Fire Fighting Tank Con
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
To Be Connected To Mcgm Sewer Line
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Under Ground Rain Water Harvesting Tank Concerted
Water Supply90% completed
90% Complete
Supplied By Mcgm
Buildings / Wings in M19-Matunga Central
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of M19-Matunga Centralby M Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

6984 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

40 apartments in total
Total
40
Booked
29
Available
11

Saleable Area Statistics (Sq. ft.)

31313 Total
Total
31313
Booked
22429
Available
8884
Total 40 apartments in project. 29 apartments booked. 72% apartments booked.
Total 2909.09 saleable area. 2083.74 apartments booked.
72% area booked.

Suvidha Garnet

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Suvidha GarnetOct 2022171114026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.57 Sq.mts. ( 491 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK46.05 Sq.mts. ( 496 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK50.63 Sq.mts. ( 545 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK43.32 Sq.mts. ( 466 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK43.8 Sq.mts. ( 471 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK44.1 Sq.mts. ( 475 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK41.91 Sq.mts. ( 451 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK62.97 Sq.mts. ( 678 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK65.51 Sq.mts. ( 705 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.8 Sq.mts. ( 719 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK68.52 Sq.mts. ( 738 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK69.1 Sq.mts. ( 744 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK85.08 Sq.mts. ( 916 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK216.34 Sq.mts. ( 2329 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK85.67 Sq.mts. ( 922 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK86.56 Sq.mts. ( 932 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK88.8 Sq.mts. ( 956 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK89.46 Sq.mts. ( 963 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK108.79 Sq.mts. ( 1171 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK109.52 Sq.mts. ( 1179 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK115.9 Sq.mts. ( 1248 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK84.79 Sq.mts. ( 913 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK & more149.77 Sq.mts. ( 1612 Sq.ft. )1
1 Booked100% Booked
100% Booked
Studio55.47 Sq.mts. ( 597 Sq.ft. )1
None Booked0% Booked
0% Booked
40 total apartments / 29 apartments booked. 72% apartments booked.
Work Description in Building Suvidha GarnetCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
M Realty
for Project
M 19
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About M Realty

M Realty