Labh Sapphire Project at Andheri West by Labharti Realities (P51800055284)
  • Rating:
  • ()

Labh Sapphire - Andheri West

Project Details, Configuration & Prices
Project overview
Labh Sapphire Project at Andheri West by Labharti Realities (P51800055284) is a RERA approved Under Construction Project with RERA ID P51800055284 slated to be ready for possession by Dec 2027 with 2/3/4 BHK apartments / Flats starting from N/A onwards

Labh Sapphire is an architectural landmark inspired by the brilliance and elegance of a green sapphire, seamlessly blending nature-inspired design with modern luxury living. Designed with sleek angular contours and emerald-inspired geometry, the project stands as a visual masterpiece while promoting sustainable and eco-conscious living. Spread across an expansive 1,75,000 sq.ft. development, Labh Sapphire offers ultra-luxury 2, 3 & 4 BHK flats with decks, thoughtfully planned to maximize natural light, ventilation and open green views. Residents are welcomed by tranquil landscaped gardens, cascading water features and over 25 lifestyle amenities across 4 curated zones, including swimming pools, state-of-the-art fitness centres and dedicated children’s play areas. The project features three iconic wings – Jade, Scarlet and Ivory, seamlessly connected at podium and terrace levels to encourage community living. With podium parking, car ramps, car lifts, Face-ID security and award-winning interior design, Labh Sapphire sets a new benchmark for sustainable luxury living.
Labh Sapphire QR Code
Labh Sapphire
MahaRERA - P51800055284

Transcon Triumph - Tower 4

₹ 2.97 Crs. onwards
Andheri West
2/3 BHK apartments
View Details

Adani Linkbay Residences

₹ 3.25 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details

Bharat Altavistas

₹ 5.77 Crs. onwards
Andheri West
3/6 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 3 Crs. onwards
Andheri West
Office BHK apartments
View Details

Kalpataru Lokhandwala New Launch

₹ 7.8 Crs. onwards
Andheri West
3/4/4½ BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details
Andheri West
4/4½ BHK apartments
View Details
Project Details
Project details were last updated in Jan 2026
  • Project:
    Labh Sapphire
  • Location:
  • Andheri West, SV Road, Opp. Shoppers Stop
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2027
  • Parking:
    Open Reserved;
Developer Details

  • Developer:
    Labharti Realities
  • Phone:
    9833898331
  • Website:
    www.labharti.com
  • Address:
  • Labharti Realities, 511, Dev Plaza, Swami Vivekananda Rd, Navpada, T E Colony, Andheri West,
Project Ratings
Project Amenities
Amenities offred in Labh Sapphire
LIFESTYLE AMENITIES
Power BackupIndoor GamesKid's play areaJogging TrackGymnasiumSwimming PoolIntercom/CCTVAluminium Sliding WindowsPOP finished wallsConcealed PlumbingConcealed WiringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose HallMassage RoomYoga Room
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800055284
RERA Project Name Labh Sapphire
RERA Location 579, 579/1 To 579/5
RERA Developer Labhartirealities
Architect Pushkar Consultants
Project RERA Details
Project Type Residential / Group Housing
Funding Bank SARASWAT COOPERATIVE BANK LIMITED
Last Modified 17 Jul 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of Labh Sapphirelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Started
Energy management
Not Started
Fire Protection And Fire Safety Requirements
Not Started
Landscaping & Tree Planting
Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Started
Solid Waste Management And Disposal
Not Started
Storm Water Drains
Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Started
Water Supply
Not Started
Buildings / Wings in Labh Sapphire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Labh Sapphireby Labharti Realitieslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

32571 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

67 apartments in total
Total
67
Booked
45
Available
22

Saleable Area Statistics (Sq. ft.)

67433 Total
Total
67433
Booked
36820
Available
30614
Total 67 apartments in project. 45 apartments booked. 67% apartments booked.
Total 6264.71 saleable area. 3420.63 apartments booked.
55% area booked.

Labh Sapphire - Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Labh Sapphire - Wing ADec 202761012064
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK73.12 Sq.mts. ( 787 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK105.06 Sq.mts. ( 1131 Sq.ft. )4
None Booked0% Booked
0% Booked
Rehab 2BHK73.12 Sq.mts. ( 787 Sq.ft. )2
2 Booked100% Booked
100% Booked
Rehab 2BHK62.1 Sq.mts. ( 668 Sq.ft. )3
2 Booked66% Booked
66% Booked
Rehab 2BHK65.21 Sq.mts. ( 702 Sq.ft. )3
3 Booked100% Booked
100% Booked
Rehab 3BHK77.32 Sq.mts. ( 832 Sq.ft. )4
4 Booked100% Booked
100% Booked
Rehab 3BHK105.06 Sq.mts. ( 1131 Sq.ft. )2
2 Booked100% Booked
100% Booked
Rehab 4BHK148.23 Sq.mts. ( 1596 Sq.ft. )1
1 Booked100% Booked
100% Booked
Rehab 4BHK195.47 Sq.mts. ( 2104 Sq.ft. )1
1 Booked100% Booked
100% Booked
Rehab Shop600.71 Sq.mts. ( 6466 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop63.19 Sq.mts. ( 680 Sq.ft. )1
1 Booked100% Booked
100% Booked
23 total apartments / 16 apartments booked. 69% apartments booked.
Work Description in Building Labh Sapphire - Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress50% done
50% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Labh Sapphire - Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Labh Sapphire - Wing BDec 202771012064
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.1 Sq.mts. ( 668 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK140.51 Sq.mts. ( 1512 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK141.8 Sq.mts. ( 1526 Sq.ft. )3
None Booked0% Booked
0% Booked
Rehab 2BHK62.1 Sq.mts. ( 668 Sq.ft. )9
9 Booked100% Booked
100% Booked
Rehab 2BHK63.39 Sq.mts. ( 682 Sq.ft. )3
3 Booked100% Booked
100% Booked
Rehab 2BHK65.21 Sq.mts. ( 702 Sq.ft. )1
1 Booked100% Booked
100% Booked
Rehab 4BHK127.46 Sq.mts. ( 1372 Sq.ft. )1
1 Booked100% Booked
100% Booked
21 total apartments / 14 apartments booked. 66% apartments booked.
Work Description in Building Labh Sapphire - Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Labh Sapphire - Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Labh Sapphire - Wing CDec 202771012065
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK73.12 Sq.mts. ( 787 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK105.06 Sq.mts. ( 1131 Sq.ft. )4
None Booked0% Booked
0% Booked
4 BHK149.36 Sq.mts. ( 1608 Sq.ft. )2
None Booked0% Booked
0% Booked
Rehab 2BHK73.12 Sq.mts. ( 787 Sq.ft. )2
2 Booked100% Booked
100% Booked
Rehab 2BHK62.1 Sq.mts. ( 668 Sq.ft. )4
4 Booked100% Booked
100% Booked
Rehab 2BHK65.21 Sq.mts. ( 702 Sq.ft. )2
1 Booked50% Booked
50% Booked
Rehab 3BHK77.6 Sq.mts. ( 835 Sq.ft. )4
4 Booked100% Booked
100% Booked
Rehab 3BHK79.07 Sq.mts. ( 851 Sq.ft. )4
4 Booked100% Booked
100% Booked
23 total apartments / 15 apartments booked. 65% apartments booked.
Work Description in Building Labh Sapphire - Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Labharti Realities
for Project
Labh Sapphire
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Labharti Realities