Labdhi Sea Breeze Project at Wadala by Labdhi Lifestyle Limited (P51900023708)
  • Rating:
  • ()

Labdhi Sea Breeze - Wadala

Labdhi Lifestyle Limited
Project Details, Configuration & Prices
Project overview
Labdhi Sea Breeze Project at Wadala by Labdhi Lifestyle Limited (P51900023708) is a RERA approved Under Construction Project with RERA ID P51900023708 slated to be ready for possession by Dec 2027 with 1/2/3 BHK apartments / Flats starting from N/A onwards

Labdhi Sea Breeze by Labdhi Lifestyle Limited is an exceptional residential project located in the heart of Wadala, Mumbai. This landmark development features beautifully designed 1, 2, and 3 BHK luxury apartments that offer breathtaking panoramic views of the Arabian Sea and over 100 acres of lush green mangroves. Strategically situated near the Eastern Freeway (Wadala exit) and just minutes from key business districts, the project ensures seamless connectivity. It includes thoughtful spiritual amenities like a Jain Derasar and Upashray within the premises for a serene living experience. Residents enjoy access to world-class facilities such as a gymnasium, swimming pool, children’s play area, mini theatre, rooftop gardens, jogging track, multi-purpose hall, and 24/7 security with CCTV surveillance. With proximity to schools, hospitals, and transport hubs, Labdhi Sea Breeze perfectly blends modern luxury, convenience, and tranquil living in Mumbai’s vibrant urban setting
Labdhi Sea Breeze QR Code
Labdhi Sea Breeze
MahaRERA - P51900023708

Siddha Sky

₹ 1.65 Crs. onwards
Wadala
2/3/4 BHK apartments
View Details

Dosti Eastern Bay

₹ 2.23 Crs. onwards
Wadala
2/3/4 BHK apartments
View Details

Runwal Timeless

₹ 1.77 Crs. onwards
Wadala
2/3 BHK apartments
View Details

Lodha Lumis

₹ 3.82 Crs. onwards
Wadala
3/3½/4 BHK apartments
View Details

Lodha Gardenia

₹ 1.69 Crs. onwards
Wadala
1/2/3 BHK apartments
View Details

Passcode Stardeck

₹ 2.6 Crs. onwards
Wadala
2 BHK apartments
View Details

Dosti Lagoona

₹ 2.52 Crs. onwards
Wadala
2/3/4 BHK apartments
View Details

Godrej Horizon

₹ 3.6 Crs. onwards
Wadala
2/3/5 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Labdhi Sea Breeze
  • Location:
  • Wadala, intersection of Sion Chembur Road and, RJ Gaikwad Rd,
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2027
  • Floors:
    35
Developer Details

Labdhi Lifestyle Limited

  • Developer:
    Labdhi Lifestyle Limited
  • Phone:
    022 24304041
  • Website:
    www.labdhilife.com
  • Address:
  • 165, Lohar Chawl, 71, Amrit Niwas, Ground Floor, Mumbai - 400 002.
Project Ratings
Project Amenities
Amenities offred in Labdhi Sea Breeze
LIFESTYLE AMENITIES
Kid's play areaGymnasiumAluminium Sliding WindowsConcealed PlumbingConcealed WiringVitrified flooringGranite PlatformSecurity Help DeskMassage Room
Project RERA Details
RERA Project Status New
Proposed Possession 30 Dec 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51900023708
RERA Project Name Labdhi Seabreeze
RERA Location 192 Pt, 195 Pt, 194 Pt
RERA Developer Labdhi Siddhivinayak Realtors Llp
Architect Santosh Kumbhar
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 11 Oct 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Wadala

Facilities & Amenities
Facilities, Amenities & Common areas details of Labdhi Sea Breezelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
194.62 Sqmt
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
As Per Approved Plans
Energy management
Na
Fire Protection And Fire Safety Requirements60% completed
60% Complete
As Cfo Noc
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)35% completed
35% Complete
As Per Approved Plans
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
As Per Approved Plans
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
From Municipal Sources
Buildings / Wings in Labdhi Sea Breeze
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Labdhi Sea Breezeby Labdhi Lifestyle Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

27605 Sq. ft.

Project Area

2095 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

262 apartments in total
Total
262
Booked
245
Available
17

Saleable Area Statistics (Sq. ft.)

99694 Total
Total
99694
Booked
92757
Available
6938
Total 262 apartments in project. 245 apartments booked. 93% apartments booked.
Total 9261.83 saleable area. 8617.29 apartments booked.
93% area booked.

Labdhi Seabreeze

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Labdhi SeabreezeDec 2026351100039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )29
27 Booked93% Booked
93% Booked
1 BHK31.01 Sq.mts. ( 334 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.15 Sq.mts. ( 346 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK32.93 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.22 Sq.mts. ( 358 Sq.ft. )33
33 Booked100% Booked
100% Booked
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )33
32 Booked96% Booked
96% Booked
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )33
33 Booked100% Booked
100% Booked
1 BHK34.16 Sq.mts. ( 368 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.27 Sq.mts. ( 369 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK44.91 Sq.mts. ( 483 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK45.25 Sq.mts. ( 487 Sq.ft. )33
31 Booked93% Booked
93% Booked
2 BHK49.21 Sq.mts. ( 530 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.83 Sq.mts. ( 536 Sq.ft. )33
30 Booked90% Booked
90% Booked
202 total apartments / 189 apartments booked. 93% apartments booked.
Work Description in Building Labdhi SeabreezeCompletion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Siddhivinayak Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Siddhivinayak TowerDec 2026351100033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.4 Sq.mts. ( 263 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK24.63 Sq.mts. ( 265 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK26.85 Sq.mts. ( 289 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK29.28 Sq.mts. ( 315 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK29.32 Sq.mts. ( 316 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK29.62 Sq.mts. ( 319 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK31.93 Sq.mts. ( 344 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK17.95 Sq.mts. ( 193 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK17.97 Sq.mts. ( 193 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.88 Sq.mts. ( 214 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK44.78 Sq.mts. ( 482 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK50.02 Sq.mts. ( 538 Sq.ft. )2
2 Booked100% Booked
100% Booked
60 total apartments / 56 apartments booked. 93% apartments booked.
Work Description in Building Siddhivinayak TowerCompletion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Labdhi Lifestyle Limited
for Project
Labdhi Seabreeze
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Labdhi Lifestyle Limited

Labdhi Lifestyle Limited Labdhi Lifestyle is promoted by a group of individuals with a stellar business record and more than 100 years of collective experience.The Group has an annual turnover of more than Rs. 300 crores and interests in businesses such as real estate, infrastructure, electrical products distribution, gold jewellery and finance.The group has acquired more than 100 acres land in Karjat, Neral belt and intends to develop over 5000 apartments in the area.