Keshav Kunj V Project at Nerul by V R Mittal Builders (P51700000624)
  • Rating: 3.9
  • (21)

Keshav Kunj V - Nerul

V R Mittal Builders
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
Project overview
Keshav Kunj V Project at Nerul by V R Mittal Builders (P51700000624) a Sold Out Project with 2/3/4 BHK apartments / Flats starting from ₹ 0 onwards

Keshav Kunj IV is a project that brings to you homes with excellent location advantages blended with warmth and comfort & its Exclusive Residential & Commercial Complex, ideally set at the prime location of Palm Beach Road,This complex is facing the sea, also having a good location and scenic site there is enough penetration of light,This paradise not only has a good access to seawood station, but also like other projects offers a good quality of construction.
Keshav Kunj V QR Code
Keshav Kunj V
MahaRERA - P51700000624

Mark 1

₹ 86.36 Lacs. onwards
Nerul
Office BHK apartments
View Details

Emperia Icon

₹ 47.7 Lacs. onwards
Nerul
Office BHK apartments
View Details

Delta Stellar

₹ 5.79 Crs. onwards
Nerul
Office BHK apartments
View Details
Nerul
3/3½ BHK apartments
View Details
Nerul
Office BHK apartments
View Details
Nerul
2 BHK apartments
View Details
Nerul
2/3 BHK apartments
View Details

24 High

₹ 48.75 Lacs. onwards
Nerul
Office BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Keshav Kunj V
  • Location:
  • Nerul, Sector-44 A, Opp.Golf Course
  • Const. Stage:
    Sold Out
  • Possession:
  • Parking:
    Open;Stilt;
  • Floors:
    23
Developer Details

V R Mittal Builders

  • Developer:
    V R Mittal Builders
  • Phone:
    022 27814975
  • Website:
    www.vrmittal.com
  • Address:
  • Keshava Kunj-V', Plot No. 5 to 9, Sector-44 A, Palm Beach Road, Nerul, Navi Mumbai
Project Ratings
Project Amenities
Amenities offred in Keshav Kunj V
LIFESTYLE AMENITIES
Swimming PoolHealth ClubHigh speed elevatorsGrand entrance lobbyKid's play areaPower BackupPOP finished wallsVitrified flooringGranite PlatformPiped Gas
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 22 Jul 2018
Revised Possession 22 Jul 2018
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700000624
RERA Project Name Keshav Kunj Iv
RERA Location Plot No 5-9, Sector 44A, Nerul
RERA Developer Asha Developers
Architect Ms Dimensions
Project RERA Details
Project Type Others
Funding Bank DHANALAKSHMI BANK
Last Modified 18 Jul 2017
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Nerul

Facilities & Amenities
Facilities, Amenities & Common areas details of Keshav Kunj Vlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management50% completed
50% Complete
-
Fire Protection And Fire Safety Requirements 60% completed
60% Complete
-
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Keshav Kunj V
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Keshav Kunj Vby V R Mittal Builderslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

123601 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

438 apartments in total
Total
438
Booked
60
Available
378

Saleable Area Statistics (Sq. ft.)

213794 Total
Total
213794
Booked
49775
Available
164019
Total 438 apartments in project. 60 apartments booked. 13% apartments booked.
Total 19861.96 saleable area. 4624.22 apartments booked.
23% area booked.

Tower A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower AJan 1900231111431
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK69.24 Sq.mts. ( 745 Sq.ft. )44
39 Booked88% Booked
88% Booked
3 BHK79 Sq.mts. ( 850 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK92.94 Sq.mts. ( 1000 Sq.ft. )19
19 Booked100% Booked
100% Booked
65 total apartments / 60 apartments booked. 92% apartments booked.
Work Description in Building Tower ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower BJan 1900231111431
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK69.7 Sq.mts. ( 750 Sq.ft. )10
None Booked0% Booked
0% Booked
3 BHK111.52 Sq.mts. ( 1200 Sq.ft. )9
None Booked0% Booked
0% Booked
4 BHK139.41 Sq.mts. ( 1501 Sq.ft. )11
None Booked0% Booked
0% Booked
5 BHK195.17 Sq.mts. ( 2101 Sq.ft. )12
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower CJan 19001611111060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.85 Sq.mts. ( 375 Sq.ft. )44
None Booked0% Booked
0% Booked
1RKRESIHOTELAPARTMEN21.38 Sq.mts. ( 230 Sq.ft. )91
None Booked0% Booked
0% Booked
135 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower DJan 19001011111060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RKRESIHOTELAPARTMEN25.1 Sq.mts. ( 270 Sq.ft. )126
None Booked0% Booked
0% Booked
HALLBANQUET568.59 Sq.mts. ( 6120 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICECONFERENCEROOM20.91 Sq.mts. ( 225 Sq.ft. )3
None Booked0% Booked
0% Booked
RESTAURANT355.37 Sq.mts. ( 3825 Sq.ft. )1
None Booked0% Booked
0% Booked
131 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress35% done
35% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress35% done
35% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower EJan 1900611112020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RKRESIHOTELAPARTMEN24.63 Sq.mts. ( 265 Sq.ft. )64
None Booked0% Booked
0% Booked
HALLBANQUET110.72 Sq.mts. ( 1192 Sq.ft. )1
None Booked0% Booked
0% Booked
65 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress35% done
35% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress35% done
35% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
V R Mittal Builders
for Project
Keshav Kunj Iv
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About V R Mittal Builders

V R Mittal Builders V R Mittal Builder has Contributed its share in national building and goverment plans by construction of multistoried residential buildings, commercial complexes, slum Rehabilitation Projects, etc speaking volume about dynamism and foresight. It has created many masterpieces with a magnificent blend of architecture, art and technology.