Kalpataru Yashodhan Project at Andheri West by Kalpataru Limited (P51800000442)
  • Rating: 5.0
  • (114)

Kalpataru Yashodhan - Andheri West

Kalpataru Limited
Project Details, Configuration & Prices
2 BHK750 Sq.ft. Carpet ₹ 3.90 Cr (All Incl.)
3 BHK1356 Sq.ft. Carpet ₹ 7.50 Cr (All Incl.)
3 BHK1398 Sq.ft. Carpet ₹ 7.50 Cr (All Incl.)
3 BHK1441 Sq.ft. Carpet ₹ 7.90 Cr (All Incl.)
Project overview
Kalpataru Yashodhan Project at Andheri West by Kalpataru Limited (P51800000442) a Sold Out Project with 2/3 BHK apartments / Flats starting from ₹ 3.9 Crs onwards

Kalpataru Yashodhan at S V Road in Andheri West, Mumbai, is a plush address that is nestled in the lap of nature and spread over 1.9 acres.Strategically located on SV Road, & in close proximity to Lallu Bhai Park & SV Park, the luxurious 2 & 3 BHK homes offer serene views. Boasting of a lavish clubhouse, swimming pool, party hall and more, here, you will be immersed in a world of calm as soon as you step inside.

Kalpataru Yashodhan is a 13 storied Ready Possession Project (OC Received) and the location is S.V.Road, Lalubhai Park, Andheri West and is developed by Kalpataru Limited. Kalpataru Yashodhan was launched in Jun 2016.

Kalpataru Yashodhan is RERA approved has the Registration Number bearing P51800000442.

It has 2 Towers, which provides an exclusive 3BHK apartments that has various amenities along with luxurious lifestyle. There is basement parking upto 3 levels and 2 cars parking available for each flat owner in Kalpataru Yashodhan.

Kalpataru Limited also has other under construction and ready possession and sold out projects like Horizon, Kalpataru Royale, Kalpataru Estate, Kalpataru Gardens, Kamdhenu, Siddhachal VI, Siddhachal V, Kalpataru Harmony, Siddhachal VIII, Shravan Tarangan, Kalpataru Aura, Kalpataru Towers, Siddhanchal , Kalpataru Estate Phase V , Kalpataru Estate Phase VI, Kalpataru Gardens Phase II, Srishti, Kalpataru Riverside, Kalpataru Pinnacle, Kalpataru Hills, Siddhachal Building No 4, Kalpataru Sparkle, Kalpataru Crest, Nandalaya, Kalpataru Siddhachal Elite, Kalpataru Radiance Aura, Kalpataru Hills Phase II, Kalpataru Sunrise, Kalpataru Crest Avalon, Kalpataru Avana, Kalpataru Solitaire, Kalpataru Regalia, Kalpataru Radiance Lumina , Kalpataru Siddhachal Elegant, Kalpataru Radiance Allura , Kalpataru Yashodhan, Kalpataru Primus, Kalpataru Radiance Brilliance, Kalpataru Immensa, Kalpataru Woodsville, Kalpataru Hills Pristine, Kalpataru Radiance, Kalpataru Paramount, Kalpataru Magnus, Expansia. The property prices in Andheri West are in the range of 18000 to 26000 for Outright for ready and under construction projects.

Kalpataru Limited currently has 5 Ready Possession, 13 Under Construction projects.

Kalpataru Yashodhan has good reviews and the ratings of this project are approximately 4 out of 5.

You can download the brochure of Kalpataru Yashodhan and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website.

The Bookings for the Ready Possession project Kalpataru Yashodhan are open and we can set up a Site Visit any time at your Convenience. Kalpataru Yashodhan is approved by most of the Banks and for more details on the approved bank list, please connect with us.

Kalpataru Yashodhan QR Code
Kalpataru Yashodhan
MahaRERA - P51800000442

Transcon Triumph - Tower 4

₹ 2.97 Crs. onwards
Andheri West
2/3 BHK apartments
View Details

Adani Linkbay Residences

₹ 3.25 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details

Bharat Altavistas

₹ 5.77 Crs. onwards
Andheri West
3/6 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 3 Crs. onwards
Andheri West
Office BHK apartments
View Details

DLF WestPark

₹ 4.2 Crs. onwards
Andheri West
3 BHK apartments
View Details
Andheri West
3/4 BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Kalpataru Yashodhan
  • Location:
  • Andheri West, S.V.Road, Lalubhai Park
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2020
  • Floors:
    13
Developer Details

Kalpataru Limited

  • Developer:
    Kalpataru Limited
  • Phone:
    022 30643065
  • Website:
    www.kalpataru.com
  • Address:
  • Kalpataru Constructions,Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (E),Mumbai 400055
Project Ratings
Project Amenities
Amenities offred in Kalpataru Yashodhan
LIFESTYLE AMENITIES
Swimming PoolClub HouseGymnasiumGrand entrance lobbyHigh speed elevatorsJogging TrackLandscaped gardenKid's play areaPower BackupVitrified flooringImported Sanitary FittingsPOP finished wallsIntercom/CCTVGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Apr 2022
Revised Possession 30 Apr 2022
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800000442
RERA Project Name Kalpataru Yashodhan
RERA Location Tps - Andheri-Vi Of Village Vile Parle, F.P. No 71 Part
RERA Developer Kalpataru Property Ventures Llp
Architect Sanjay Puri Architects
Project RERA Details
Project Type Residential / Group Housing
Funding Bank KOTAK MAHINDRA BANK LIMITED
Last Modified 12 Apr 2019
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of Kalpataru Yashodhanlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Shall Be Completed Before Possession
Club House,Fitness Centre Swimming pool & other Recreation areas100% completed
95% Complete
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room And Sub-Station Only
Energy management96% completed
96% Complete
Shall Be Completed Before Possession
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Shall Be Completed Before Possession
Landscaping & Tree Planting96% completed
96% Complete
Shall Be Completed Before Possession
NA
Na
Open Parking
Shall Be Completed Before Possession
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp-Shall Be Completed Before Possession
Solid Waste Management And Disposal99% completed
99% Complete
Shall Be Completed Before Possession
Storm Water Drains100% completed
95% Complete
Shall Be Completed Before Possession
Street Lighting100% completed
95% Complete
Shall Be Completed Before Possession
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Shall Be Completed Before Possession
Water Conservation, Rain water Harvesting100% completed
95% Complete
Wip
Water Supply100% completed
95% Complete
Supply From Local Authority
Buildings / Wings in Kalpataru Yashodhan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kalpataru Yashodhanby Kalpataru Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

87188 Sq. ft.

Project Area

17438 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

75 apartments in total
Total
75
Booked
50
Available
25

Saleable Area Statistics (Sq. ft.)

89354 Total
Total
89354
Booked
57611
Available
31743
Total 75 apartments in project. 50 apartments booked. 66% apartments booked.
Total 8301.2 saleable area. 5352.16 apartments booked.
64% area booked.

Wing A, B And C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A, B And CApr 20211413107320
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK69.64 Sq.mts. ( 750 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK69.75 Sq.mts. ( 751 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK69.77 Sq.mts. ( 751 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK69.78 Sq.mts. ( 751 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK70.52 Sq.mts. ( 759 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK83.08 Sq.mts. ( 894 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK83.29 Sq.mts. ( 897 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK83.95 Sq.mts. ( 904 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK129.45 Sq.mts. ( 1393 Sq.ft. )9
6 Booked66% Booked
66% Booked
24 total apartments / 20 apartments booked. 83% apartments booked.
Work Description in Building Wing A, B And CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D And E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D And EApr 20211413102137
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK116.99 Sq.mts. ( 1259 Sq.ft. )12
8 Booked66% Booked
66% Booked
3 BHK118.08 Sq.mts. ( 1271 Sq.ft. )13
7 Booked53% Booked
53% Booked
3 BHK119.01 Sq.mts. ( 1281 Sq.ft. )13
7 Booked53% Booked
53% Booked
3 BHK120.11 Sq.mts. ( 1293 Sq.ft. )13
8 Booked61% Booked
61% Booked
51 total apartments / 30 apartments booked. 58% apartments booked.
Work Description in Building Wing D And ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress87% done
87% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress87% done
87% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress45% done
45% Booked
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress97% done
97% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Kalpataru Limited
for Project
Kalpataru Yashodhan
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer