• Rating:
  • ()

This project is no longer available in our database.
Please use the adjoining search tools to find similar propjects.

-

Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Lodha Signet

₹ 1.09 Crs. onwards
Vikhroli
Office BHK apartments
View Details

Lodha Casa Evergreen

₹ 1.84 Crs. onwards
Vikhroli
2 BHK apartments
View Details
Vikhroli
2/3/4 BHK apartments
View Details

Golden Oak

₹ 1.09 Crs. onwards
Vikhroli
Office BHK apartments
View Details

Lodha Riservo

₹ 3.37 Crs. onwards
Vikhroli
2½/3 BHK apartments
View Details

Gurukrupa Darshanam

₹ 84.42 Lacs. onwards
Vikhroli
1/2/3 BHK apartments
View Details
Vikhroli
1/2/3 BHK apartments
View Details
Vikhroli
Office BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

haware

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAir ConditionersAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help Desk
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Apr 2019
Revised Possession 30 Apr 2019
Extended Possession 29 Oct 2020
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700001515
RERA Project Name Dahlia Bldg A D And E
RERA Location 47/1 48/2 48/3 48/6Ap 48/6B
RERA Developer Haware Engineers And Builders Private Limited
Architect Mr Vinay Patil
Project RERA Details
Project Type Residential / Group Housing
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Last Modified 13 Jun 2020
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
Done
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting30% completed
30% Complete
Done
Water Supply
0
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

42819 Sq. ft.

Project Area

16581 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

158 apartments in total
Total
158
Booked
98
Available
60

Saleable Area Statistics (Sq. ft.)

2476068 Total
Total
2476068
Booked
1478961
Available
997106
Total 158 apartments in project. 98 apartments booked. 62% apartments booked.
Total 230032.3 saleable area. 137398.88 apartments booked.
60% area booked.

Dahlia A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dahlia AJan 19001610107914
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK844.48 Sq.mts. ( 9090 Sq.ft. )28
18 Booked64% Booked
64% Booked
1RK1451.4 Sq.mts. ( 15623 Sq.ft. )60
48 Booked80% Booked
80% Booked
88 total apartments / 66 apartments booked. 75% apartments booked.
Work Description in Building Dahlia ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress52% done
52% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
work-in-progress45% done
45% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
work-in-progress90% done
90% Booked

Dahlia D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dahlia DJan 190018101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1rk20.58 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK1543.72 Sq.mts. ( 16617 Sq.ft. )32
13 Booked40% Booked
40% Booked
3 BHK2078.92 Sq.mts. ( 22377 Sq.ft. )33
15 Booked45% Booked
45% Booked
66 total apartments / 28 apartments booked. 42% apartments booked.
Work Description in Building Dahlia DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress55% done
55% Booked
Stilt Floor
Completed 100% done
100% Booked

Dahlia E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dahlia EJan 19003101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOPS319.72 Sq.mts. ( 3441 Sq.ft. )4
4 Booked100% Booked
100% Booked
4 total apartments / 4 apartments booked. 100% apartments booked.
Work Description in Building Dahlia ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Dahlia Bldg A D And E
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation