Gurukrupa Marque Project at Bandra West by Gurukrupa Realcon Builder (P51800078233)
  • Rating:
  • ()

Gurukrupa Marque - Bandra West

Gurukrupa Realcon Builder
Project Details, Configuration & Prices
2 BHK844 Sq.ft. Carpet ₹ 4.64 Cr ++
3 BHK1302 Sq.ft. Carpet ₹ 7.16 Cr ++
3 BHK1326 Sq.ft. Carpet ₹ 7.26 Cr ++
4 BHK1577 Sq.ft. Carpet ₹ 8.67 Cr ++
4 BHK1621 Sq.ft. Carpet ₹ 8.91 Cr ++
4 BHK1817 Sq.ft. Carpet ₹ 9.99 Cr ++
Project overview
Gurukrupa Marque Project at Bandra West by Gurukrupa Realcon Builder (P51800078233) is a RERA approved Under Construction Project with RERA ID P51800078233 slated to be ready for possession by Oct 2028 with 2/3/4 BHK apartments / Flats starting from ₹ 4.64 Crs onwards

Introducing Gurukrupa Realcon (Code Name: 100 Reclamation), the next iconic address in Bandra West. Offering luxury sea view apartments in 2, 3, and 4 BHK configurations, with carpet areas ranging from 850 sq.ft to 1900 sq.ft, including Jodi options. Located in the prime Reclamation area of Bandra West, this project promises to be a prestigious addition to the neighbourhood, with possession slated for December 2027. Take advantage of exclusive pre-launch benefits, including a choice of sea view inventory, capital appreciation opportunities, and Vastu-compliant options.
Gurukrupa Marque QR Code
Gurukrupa Marque
MahaRERA - P51800078233

Shanti Sadan

₹ 7.06 Crs. onwards
Bandra West
3 BHK apartments
View Details

Unique Shanti Finessia

₹ 9.99 Crs. onwards
Bandra West
4 BHK apartments
View Details

Mayfair Muse

₹ 19.99 Crs. onwards
Bandra West
Duplex BHK apartments
View Details

Prestige Daffodils

₹ 27.18 Crs. onwards
Bandra West
4 BHK apartments
View Details

Park Reach

₹ 10.18 Crs. onwards
Bandra West
3 BHK apartments
View Details

Turner House

₹ 12.75 Crs. onwards
Bandra West
Office BHK apartments
View Details

Vaswani Avania

₹ 4.63 Crs. onwards
Bandra West
2/4 BHK apartments
View Details

Mirchandani Goldstone

₹ 10.72 Crs. onwards
Bandra West
3/4/Pent House BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Gurukrupa Marque
  • Location:
  • Bandra West, Reclamation
  • Const. Stage:
    Under Construction
  • Possession:
    Oct 2028
Developer Details

Gurukrupa Realcon Builder

  • Developer:
    Gurukrupa Realcon Builder
  • Phone:
  • Website:
    www.gurukrupagroup.in
  • Address:
  • Bldg no 45/1st floor, Santh Dyaneshwar Marg Opp.Swami Samarth temple, Pant Nagar, Ghatkopar East
Project Ratings
Project Brochures
Brochures of Gurukrupa Marqueby Gurukrupa Realcon Builder
Project Brochures
  • MPE/Brochures/31569/100 Reclamation.pdf
Project Amenities
Amenities offred in Gurukrupa Marque
LIFESTYLE AMENITIES
Air Conditioned LobbyHigh speed elevatorsGrand entrance lobbyPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Oct 2028
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800078233
RERA Project Name The Marque
RERA Location Plot No 18 & 19, Cts No A791 Bandra
RERA Developer Gurukrupa Realcon Infrabuild Llp
Project RERA Details
Project Type Residential / Group Housing
Funding Bank KOTAK MAHINDRA BANK LIMITED
Last Modified 29 Nov 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Bandra West

Facilities & Amenities
Facilities, Amenities & Common areas details of Gurukrupa Marquelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Shown In Plan
Energy management
As Shown In Plan
Fire Protection And Fire Safety Requirements
As Shown In Plan
Landscaping & Tree Planting
As Shown In Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Shown In Plan
Solid Waste Management And Disposal
As Shown In Plan
Storm Water Drains
As Shown In Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Shown In Plan
Water Conservation, Rain water Harvesting
As Shown In Plan
Water Supply
As Shown In Plan
Buildings / Wings in Gurukrupa Marque
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gurukrupa Marqueby Gurukrupa Realcon Builderlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

19800 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

76 apartments in total
Total
76
Booked
0
Available
76

Saleable Area Statistics (Sq. ft.)

86721 Total
Total
86721
Booked
0
Available
86721
Total 76 apartments in project. 0 apartments booked. 0% apartments booked.
Total 8056.59 saleable area. 0 apartments booked.
0% area booked.

The Marque

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
The MarqueOct 20281210170162
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.49 Sq.mts. ( 705 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK73.37 Sq.mts. ( 790 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK Rehab74.24 Sq.mts. ( 799 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK Rehab64.64 Sq.mts. ( 696 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK94.75 Sq.mts. ( 1020 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK96.32 Sq.mts. ( 1037 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK Rehab96.32 Sq.mts. ( 1037 Sq.ft. )9
None Booked0% Booked
0% Booked
3 BHK Rehab94.75 Sq.mts. ( 1020 Sq.ft. )9
None Booked0% Booked
0% Booked
3.5 BHK Rehab114.72 Sq.mts. ( 1235 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK126.64 Sq.mts. ( 1363 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK127.9 Sq.mts. ( 1377 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK155.41 Sq.mts. ( 1673 Sq.ft. )3
None Booked0% Booked
0% Booked
4 BHK Rehab155.41 Sq.mts. ( 1673 Sq.ft. )8
None Booked0% Booked
0% Booked
4 BHK rehab127.9 Sq.mts. ( 1377 Sq.ft. )8
None Booked0% Booked
0% Booked
4 BHK Rehab126.64 Sq.mts. ( 1363 Sq.ft. )8
None Booked0% Booked
0% Booked
5 BHK & more184.03 Sq.mts. ( 1981 Sq.ft. )1
None Booked0% Booked
0% Booked
76 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building The MarqueCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Gurukrupa Realcon Builder
for Project
The Marque
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Gurukrupa Realcon Builder

Gurukrupa Realcon Builder