Gami Amore Project at Seawoods by Gami Group (P51700052377)
  • Rating:
  • ()

Gami Amore - Seawoods

Project Details, Configuration & Prices
Project overview
Gami Amore Project at Seawoods by Gami Group (P51700052377) is a RERA approved Under Construction Project with RERA ID P51700052377 slated to be ready for possession by Mar 2031 with 2/3/4/5 BHK apartments / Flats starting from N/A onwards

Gami Amore QR Code
Gami Amore
MahaRERA - P51700052377

L and T West Square

₹ 2.35 Crs. onwards
Seawoods
2/2½/3 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Gami Amore
  • Location:
  • Seawoods, Plot No. 5A, Sector 46 A,
  • Const. Stage:
    Under Construction
  • Possession:
    Mar 2031
  • Floors:
    15
Developer Details

  • Developer:
    Gami Group
  • Phone:
    022 27815536
  • Website:
    www.gamigroup.in
  • Address:
  • 101, Real Tech Park, 1st floor, Plot No. 39/2, Sector - 30A, Vashi, Navi Mumbai - 400 703.
Project Ratings
Project Amenities
Amenities offred in Gami Amore
Project RERA Details
RERA Project Status New
Proposed Possession 31 Mar 2031
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700052377
RERA Project Name Palm Amore
RERA Location Plot No 5A,Sector No 46A
RERA Developer Vision Infra
Architect Dimensions Architects Pvt Ltd
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 21 Aug 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Seawoods

Facilities & Amenities
Facilities, Amenities & Common areas details of Gami Amorelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
In Later Scope Of Work
Energy management
Na
Fire Protection And Fire Safety Requirements
In Later Scope Of Work
Landscaping & Tree Planting
In Later Scope Of Work
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
In Later Scope Of Work
Solid Waste Management And Disposal
In Later Scope Of Work
Storm Water Drains
In Later Scope Of Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Later Scope Of Work
Water Supply
Temporary From Nmmc
Buildings / Wings in Gami Amore
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gami Amoreby Gami Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

247562 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 14

Wings / Towers in Project

Apartments Statistics

861 apartments in total
Total
861
Booked
220
Available
641

Saleable Area Statistics (Sq. ft.)

1055293 Total
Total
1055293
Booked
214974
Available
840319
Total 861 apartments in project. 220 apartments booked. 25% apartments booked.
Total 98039.156 saleable area. 19971.596 apartments booked.
20% area booked.

A-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A-WingMar 20311514100144
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK119.882 Sq.mts. ( 1290 Sq.ft. )30
3 BHK138.13 Sq.mts. ( 1487 Sq.ft. )15
4 BHK194.227 Sq.mts. ( 2091 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK207.371 Sq.mts. ( 2232 Sq.ft. )13
None Booked0% Booked
0% Booked
Shop38.916 Sq.mts. ( 419 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop44.686 Sq.mts. ( 481 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop45.31 Sq.mts. ( 488 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop50.772 Sq.mts. ( 547 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop55.608 Sq.mts. ( 599 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop55.858 Sq.mts. ( 601 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop70.783 Sq.mts. ( 762 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop71.588 Sq.mts. ( 771 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop84.284 Sq.mts. ( 907 Sq.ft. )1
1 Booked100% Booked
100% Booked
69 total apartments / 10 apartments booked. 14% apartments booked.
Work Description in Building A-WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress31% done
31% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress27% done
27% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
X number of Slabs of Super Structure

B-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B-WingMar 20311514100142
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK103.317 Sq.mts. ( 1112 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK117.899 Sq.mts. ( 1269 Sq.ft. )28
11 Booked39% Booked
39% Booked
4 BHK166.011 Sq.mts. ( 1787 Sq.ft. )30
Shop39.872 Sq.mts. ( 429 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop40.48 Sq.mts. ( 436 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop44.137 Sq.mts. ( 475 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop44.669 Sq.mts. ( 481 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop46.89 Sq.mts. ( 505 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop49.628 Sq.mts. ( 534 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop51.768 Sq.mts. ( 557 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop52.042 Sq.mts. ( 560 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop65.234 Sq.mts. ( 702 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop65.779 Sq.mts. ( 708 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 21 apartments booked. 30% apartments booked.
Work Description in Building B-WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 20311514100142
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK103.317 Sq.mts. ( 1112 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK117.899 Sq.mts. ( 1269 Sq.ft. )28
4 BHK166.011 Sq.mts. ( 1787 Sq.ft. )30
None Booked0% Booked
0% Booked
Shop40.84 Sq.mts. ( 440 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.981 Sq.mts. ( 441 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop44.589 Sq.mts. ( 480 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop46.732 Sq.mts. ( 503 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop47.068 Sq.mts. ( 507 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop51.203 Sq.mts. ( 551 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop53.417 Sq.mts. ( 575 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop53.58 Sq.mts. ( 577 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop66.203 Sq.mts. ( 713 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop66.96 Sq.mts. ( 721 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 11 apartments booked. 15% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress20% done
20% Booked
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 20311514100142
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK103.317 Sq.mts. ( 1112 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK117.899 Sq.mts. ( 1269 Sq.ft. )28
4 BHK166.011 Sq.mts. ( 1787 Sq.ft. )30
Shop39.83 Sq.mts. ( 429 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop41.31 Sq.mts. ( 445 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop44.794 Sq.mts. ( 482 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop44.942 Sq.mts. ( 484 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop45.583 Sq.mts. ( 491 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop45.958 Sq.mts. ( 495 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop51.645 Sq.mts. ( 556 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop53.315 Sq.mts. ( 574 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop65.471 Sq.mts. ( 705 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop67.393 Sq.mts. ( 725 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 13 apartments booked. 18% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
work-in-progress25% done
25% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress25% done
25% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingMar 20311514100141
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
5 BHK & more233.772 Sq.mts. ( 2516 Sq.ft. )30
Shop44.768 Sq.mts. ( 482 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop46.415 Sq.mts. ( 500 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop48.253 Sq.mts. ( 519 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop48.418 Sq.mts. ( 521 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop58.787 Sq.mts. ( 633 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop59.044 Sq.mts. ( 636 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop77.081 Sq.mts. ( 830 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop78.265 Sq.mts. ( 842 Sq.ft. )1
1 Booked100% Booked
100% Booked
38 total apartments / 12 apartments booked. 31% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingMar 20311514100152
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK130.475 Sq.mts. ( 1404 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK141.849 Sq.mts. ( 1527 Sq.ft. )2
1 Booked50% Booked
50% Booked
4 BHK141.853 Sq.mts. ( 1527 Sq.ft. )26
7 Booked26% Booked
26% Booked
4 BHK201.242 Sq.mts. ( 2166 Sq.ft. )30
Shop39.366 Sq.mts. ( 424 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop44.189 Sq.mts. ( 476 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop47.265 Sq.mts. ( 509 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop47.793 Sq.mts. ( 514 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop49.001 Sq.mts. ( 527 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop49.226 Sq.mts. ( 530 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop50.6 Sq.mts. ( 545 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop55.991 Sq.mts. ( 603 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop60.95 Sq.mts. ( 656 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop61.792 Sq.mts. ( 665 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop62.449 Sq.mts. ( 672 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop63.729 Sq.mts. ( 686 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop65.49 Sq.mts. ( 705 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop80.508 Sq.mts. ( 867 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop91.11 Sq.mts. ( 981 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop115.811 Sq.mts. ( 1247 Sq.ft. )1
1 Booked100% Booked
100% Booked
76 total apartments / 21 apartments booked. 27% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingMar 20311514100132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK77.808 Sq.mts. ( 838 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK100.629 Sq.mts. ( 1083 Sq.ft. )28
6 Booked21% Booked
21% Booked
3 BHK113.822 Sq.mts. ( 1225 Sq.ft. )30
14 Booked46% Booked
46% Booked
60 total apartments / 21 apartments booked. 35% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H WingMar 20311514100132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK77.808 Sq.mts. ( 838 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK100.629 Sq.mts. ( 1083 Sq.ft. )28
11 Booked39% Booked
39% Booked
3 BHK113.822 Sq.mts. ( 1225 Sq.ft. )30
18 Booked60% Booked
60% Booked
60 total apartments / 31 apartments booked. 51% apartments booked.
Work Description in Building H WingCompletion
Basement (if any)
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

I Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I WingMar 203115141000138
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK99.972 Sq.mts. ( 1076 Sq.ft. )15
4 Booked26% Booked
26% Booked
3 BHK104.853 Sq.mts. ( 1129 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK114.272 Sq.mts. ( 1230 Sq.ft. )28
Shop32.805 Sq.mts. ( 353 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop34.703 Sq.mts. ( 374 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.011 Sq.mts. ( 452 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.961 Sq.mts. ( 505 Sq.ft. )2
None Booked0% Booked
0% Booked
53 total apartments / 6 apartments booked. 11% apartments booked.
Work Description in Building I WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

J Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
J WingMar 20311514100138
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK82.403 Sq.mts. ( 887 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK100.783 Sq.mts. ( 1085 Sq.ft. )28
None Booked0% Booked
0% Booked
3 BHK114.3 Sq.mts. ( 1230 Sq.ft. )30
None Booked0% Booked
0% Booked
Shop32.805 Sq.mts. ( 353 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop34.703 Sq.mts. ( 374 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop42.011 Sq.mts. ( 452 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.961 Sq.mts. ( 505 Sq.ft. )2
2 Booked100% Booked
100% Booked
68 total apartments / 8 apartments booked. 11% apartments booked.
Work Description in Building J WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

K Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K WingMar 20311514100138
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.3 Sq.mts. ( 811 Sq.ft. )15
3 BHK105.099 Sq.mts. ( 1131 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK114.296 Sq.mts. ( 1230 Sq.ft. )28
None Booked0% Booked
0% Booked
Shop32.805 Sq.mts. ( 353 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop34.703 Sq.mts. ( 374 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop42.011 Sq.mts. ( 452 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop46.961 Sq.mts. ( 505 Sq.ft. )2
2 Booked100% Booked
100% Booked
53 total apartments / 9 apartments booked. 16% apartments booked.
Work Description in Building K WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

L Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L WingMar 20311514100132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.539 Sq.mts. ( 813 Sq.ft. )28
2 BHK75.676 Sq.mts. ( 815 Sq.ft. )28
6 Booked21% Booked
21% Booked
3 BHK130.177 Sq.mts. ( 1401 Sq.ft. )2
1 Booked50% Booked
50% Booked
58 total apartments / 12 apartments booked. 20% apartments booked.
Work Description in Building L WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

M Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
M WingMar 20311514100132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.539 Sq.mts. ( 813 Sq.ft. )28
8 Booked28% Booked
28% Booked
2 BHK75.676 Sq.mts. ( 815 Sq.ft. )28
10 Booked35% Booked
35% Booked
3 BHK130.177 Sq.mts. ( 1401 Sq.ft. )2
1 Booked50% Booked
50% Booked
58 total apartments / 19 apartments booked. 32% apartments booked.
Work Description in Building M WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

N Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
N WingMar 20311514100132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.539 Sq.mts. ( 813 Sq.ft. )28
11 Booked39% Booked
39% Booked
2 BHK75.676 Sq.mts. ( 815 Sq.ft. )28
14 Booked50% Booked
50% Booked
3 BHK130.177 Sq.mts. ( 1401 Sq.ft. )2
1 Booked50% Booked
50% Booked
58 total apartments / 26 apartments booked. 44% apartments booked.
Work Description in Building N WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Gami Group
for Project
Palm Amore
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Gami Group

Incepted in 2000, GAMI Group has become the most trusted and reliable name in the real estate industry. Led by a dynamic persona, Mr. Ambalal Gami, the company has accomplished the zenith of success in a mere span of 13 years. The group believes in creating a lifestyle that’s aspirational, state-of-the-art, unique. That’s why, every landmark built by us is not just to elevate your dreams but your life too. At Gami Group, a lot many things go into creating a lifestyle spaces than mere bricks and concrete. It takes in-depth planning to lay the foundation of life. Passion to explore new possibilities. Guts to rise above the challenges. And determination to create spaces for life to flourish. The core idea behind each creation is to present you a futuristic lifestyle that’s complemented by precise engineering and the latest technology.