Project Details, Configuration & Prices
1 BHK374 Sq.ft. Carpet ₹ 31.60 Lakhs (All Incl.)
1 BHK394 Sq.ft. Carpet ₹ 33.28 Lakhs (All Incl.)
1 BHK400 Sq.ft. Carpet ₹ 33.77 Lakhs (All Inc.)
2 BHK518 Sq.ft. Carpet ₹ 48.89 Lakhs (All Incl.)
2 BHK546 Sq.ft. Carpet ₹ 51.29 Lakhs (All Incl.)
2 BHK557 Sq.ft. Carpet ₹ 52.26 Lakhs (All Incl.)
2 BHK561 Sq.ft. Carpet ₹ 52.62 Lakhs (All Incl.)
2 BHK593 Sq.ft. Carpet ₹ 55.37 Lakhs (All Incl.)
3 BHK776 Sq.ft. Carpet ₹ 71.25 Lakhs (All Incl.)
Project overview
Ekta Parksville Regent Park Project at Virar by Ekta World (P99000015239) a Sold Out Project with 1/2/3 BHK apartments / Flats starting from ₹ 31.6 Lakh onwards

Ekta Parksville Phase-IV Regent Park is developed by Ekta World, which has Four 15-storey tower of 1 BHK, 2 BHK & 3 BHK. Ekta Parksville Regent Park is located at Opp. Ekta Parksville, Narangi Bypass Road in Virar West. By Located in one of Mumbai’s finest suburbs, Virar West, Regent Park at Ekta Parksville is in close proximity to the pristine Arnala beach, the Yazoo Amusement Park and more in a great neighbourhood.

MahaRERA for Ekta Parksville Phase-IV Regent Park is P99000015239.

Ekta World also has other under construction and ready possession and sold out projects like Lake Lucerne, Lake Florence, Lake Pleasant, Ekta Exotique, Enchante, Ekta Meadows, Ekta Empress, Emerald Heights, Ecstasy II, Lake Primrose, Ekta Terraces, Ebony, Supreme Residency, Supreme Pearl, Supreme Willows, Lilou Villa, Nensey, Lake Superior, Supreme Serenity, Ever Glades, Eminente I, Ekta Elite, Eminente II, Om Sadan, Sankalpita, Ekta Bhoomi Gardens III, Pushp Shelter, Lake Primrose II, Kunal, The One, Ekta Invictus , Ekta Parksville , Ekta Tripolis, Imperial Residency, Ekta Oculus, 18 West, Brooklyn Park, Ekta Legranz, Ekta Iris, Ekta Eudora, Ekta Maplewood, Ekta Olympus, Ekta Skypolis, Ekta Greenville, Ekta Lake Riviera, Ekta Trinity, Ekta Eros, Ekta Parksville Regent Park, Ekta World WestBay.

The property prices in Virar are in the range of 4000 to 5000 for Outright for ready and under construction projects.
Ekta World currently has 4 Ready Possession, 7 Under Construction projects.


Ekta Parksville Regent Park has good reviews and the ratings of this project are approximately 4 out of 5.

Download the brochure of Ekta Parksville Regent Park and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website.
The Bookings for the Under Construction project Ekta Parksville Regent Park are open and we can set up a Site Visit any time at your Convenience.
Ekta Parksville Regent Park is approved by most of the Banks and for more details on the approved bank list, please connect with us.

Ekta Parksville Regent Park QR Code
Ekta Parksville Regent Park
MahaRERA - P99000015239

Rustomjee Avenue L4

₹ 50.68 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Ekta Parksville

₹ 44.7 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Brooklyn Park

₹ 44.27 Lacs. onwards
Virar
2 BHK apartments
View Details

Poonam Imperial

₹ 32 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Sky City

₹ 29.01 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Poonam Vista

₹ 40.6 Lacs. onwards
Virar
1/2/3 BHK apartments
View Details

Paradise Grandeur

₹ 71.8 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Yash Platina

₹ 41 Lacs. onwards
Virar
1/1½/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Ekta Parksville Regent Park
  • Location:
  • Virar, Opp. Ekta Parksville, Narangi Bypass Road
  • Const. Stage:
    Sold Out
  • Possession:
    Jun 2022
  • Parking:
    Podium;
  • Floors:
    15
Developer Details

Ekta World

  • Developer:
    Ekta World
  • Phone:
    022 61152424
  • Website:
    www.ektaworld.com
  • Address:
  • 401, Hallmark Business Plaza, Off Western Express Highway, Near Bandra Kurla complex, Kalanagar, Bandra - East, Mumbai - 51
Project Ratings
Project Amenities
Amenities offred in Ekta Parksville Regent Park
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2022
Revised Possession 01 Jan 1900
Extended Possession 29 Jun 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P99000015239
RERA Project Name Ekta Parksville Phase Iv
RERA Location 91/176 1/2Pt, 91/176 2Pt, 91/176 3Pt
RERA Developer Ekta Parksville Homes Pvt. Ltd.
Architect Ajay Wade & Associates
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 08 Oct 2024
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Virar

Facilities & Amenities
Facilities, Amenities & Common areas details of Ekta Parksville Regent Parklast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Solid Waste Management And Disposal
Yet To Start
Storm Water Drains
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Yet To Start
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in Ekta Parksville Regent Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ekta Parksville Regent Parkby Ekta Worldlast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

13812 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

318 apartments in total
Total
318
Booked
56
Available
262

Saleable Area Statistics (Sq. ft.)

137181 Total
Total
137181
Booked
18312
Available
118869
Total 318 apartments in project. 56 apartments booked. 17% apartments booked.
Total 12744.4 saleable area. 1701.18 apartments booked.
13% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 202216101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK 141.78 Sq.mts. ( 450 Sq.ft. )15
2 BHK 248.44 Sq.mts. ( 521 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK 350.93 Sq.mts. ( 548 Sq.ft. )28
SHOP 1915.74 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2012.91 Sq.mts. ( 139 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2115.21 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2218.99 Sq.mts. ( 204 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 2312.4 Sq.mts. ( 133 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2416.25 Sq.mts. ( 175 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2511.43 Sq.mts. ( 123 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2615.33 Sq.mts. ( 165 Sq.ft. )1
1 Booked100% Booked
100% Booked
66 total apartments / 10 apartments booked. 15% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202216101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )45
9 Booked20% Booked
20% Booked
2 BHK48.36 Sq.mts. ( 521 Sq.ft. )13
4 Booked30% Booked
30% Booked
3 BHK65.93 Sq.mts. ( 710 Sq.ft. )15
Shop 1018.16 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1113.59 Sq.mts. ( 146 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 1215.55 Sq.mts. ( 167 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 1311.44 Sq.mts. ( 123 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 1422.78 Sq.mts. ( 245 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 1522.78 Sq.mts. ( 245 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 1617.2 Sq.mts. ( 185 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 1713.39 Sq.mts. ( 144 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 189.86 Sq.mts. ( 106 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 712.19 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 812.07 Sq.mts. ( 130 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 915.58 Sq.mts. ( 168 Sq.ft. )1
1 Booked100% Booked
100% Booked
85 total apartments / 22 apartments booked. 25% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202216101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK 150.93 Sq.mts. ( 548 Sq.ft. )28
None Booked0% Booked
0% Booked
2 BHK 248.44 Sq.mts. ( 521 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK 341.78 Sq.mts. ( 450 Sq.ft. )15
58 total apartments / 2 apartments booked. 3% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJun 202216101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK 133.22 Sq.mts. ( 358 Sq.ft. )15
None Booked0% Booked
0% Booked
1 BHK 231.38 Sq.mts. ( 338 Sq.ft. )13
1 BHK 333.89 Sq.mts. ( 365 Sq.ft. )60
16 Booked26% Booked
26% Booked
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )15
Shop 112.42 Sq.mts. ( 134 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 211.1 Sq.mts. ( 119 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 318.36 Sq.mts. ( 198 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 412.39 Sq.mts. ( 133 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 527.45 Sq.mts. ( 295 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 612.33 Sq.mts. ( 133 Sq.ft. )1
None Booked0% Booked
0% Booked
109 total apartments / 22 apartments booked. 20% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Ekta World
for Project
Ekta Parksville Phase Iv
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ekta World

Ekta World EKTA world, established in 1987. Contemporary in thinking and design, EKTA has grown brick by brick while making many happy homes along the way. The team at EKTA world is constantly working towards creating memorable projects complete with 2BHK, 3BHK and 4BHK flats in Mumbai and other cities in Maharashtra.Adding a zing of glamour and style to the city’s skyline, the group has not just built iconic structures but has also looked after the comfort and needs of its residents. This has gone a long way in building a strong reputation and goodwill amongst the discerning buyers and real estate agents in Mumbai and other cities in India.So far, the group has built some of the best residential complexes in the western suburbs between Bandra and Dahisar in Mumbai and in Pune, Nashik & Virar. With over two decades of experience in the construction sector, EKTA world has been developing three to four lakh sq.ft. real estate properties every year.EKTA Group has consciously worked towards building eco-friendly, green projects. The group’s ethos is laid on the foundation of honest, high-quality construction that is built to the suit the well informed, well-travelled and astute residents like you! EKTA is proud to share its ISO 9001:2000 certification and the recognition garnered by American Quality Standards. At this juncture, EKTA world graciously takes a bow and allows its work to speak for itself!