DPS Parkview Project at Goregaon West by BP Infra Group (P51800033278)
  • Rating: 4.3
  • (77)

DPS Parkview - Goregaon West

BP Infra Group
Project Details, Configuration & Prices
1 BHK456 Sq.ft. Carpet ₹ 1.35 Cr All in
2 BHK600 Sq.ft. Carpet ₹ 1.71 Cr All in
2 BHK609 Sq.ft. Carpet ₹ 1.77 Cr All in
2 BHK643 Sq.ft. Carpet ₹ 1.87 Cr All in
Project overview
DPS Parkview Project at Goregaon West by BP Infra Group (P51800033278) a Sold Out Project with 1/2 BHK apartments / Flats starting from ₹ 1.38 Crs onwards

DPS Parkview is a Residential Project Developed by the BP Infra Group. It is located at Goregaon West. One of the significant advantages of living in Goregaon West is its excellent connectivity. The locality is well-connected to other parts of Mumbai via various modes of transport, including local trains, buses, and auto-rickshaws. The locality offers numerous entertainment and shopping options. The famous Oberoi Mall and Inorbit Mall are popular destinations for shopping, dining, and entertainment activities. It is a Stilt + 22 storey high rise tower offering 1 and 2 BHK Residences. Ample car parking space and modern amenities like Kids Play Area, Gymnasium, Senior Citizen Sitting Area Rooftop Garden area, AC Lobby and many more.
DPS Parkview QR Code
DPS Parkview
MahaRERA - P51800033278

Kalpataru Radiance

₹ 3.79 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Ekta Tripolis

₹ 3.86 Crs. onwards
Goregaon West
2½/3 BHK apartments
View Details

DGS Sheetal Kiara

₹ 99 Lacs. onwards
Goregaon West
1/2 BHK apartments
View Details

H. Rishabraj Jakalyan Society

₹ 2.27 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Sanghvi Crystal

₹ 1.25 Crs. onwards
Goregaon West
1/2/3 BHK apartments
View Details

Riviera

₹ 1.08 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

H Rishabhraj Opulence

₹ 1.03 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

37 Avenue

₹ 1.6 Crs. onwards
Goregaon West
2/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    DPS Parkview
  • Location:
  • Goregaon West, New Siddharth Nagar, Road No.16, Near M.G. Road
  • Const. Stage:
    Sold Out
  • Possession:
    Feb 2024
  • Parking:
    Stilt
  • Floors:
    22
Developer Details

BP Infra Group

  • Developer:
    BP Infra Group
  • Phone:
  • Website:
    www.bpinfraproject.com
  • Address:
  • 603, Ruby Crescent Business Boulevard, Ashok Nagar, Kandivali (E),
Project Ratings
Project Brochures
Brochures of DPS Parkviewby BP Infra Group
Project Brochures
  • MPE/Brochures/28962/Preview Parkview.pdf
Project Amenities
Amenities offred in DPS Parkview
LIFESTYLE AMENITIES
Power BackupIndoor GamesAir Conditioned LobbyKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVPOP finished wallsImported Sanitary FittingsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 05 Feb 2024
Revised Possession 01 Jan 1900
Extended Possession 05 Aug 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800033278
RERA Project Name Dps Park View
RERA Location Cts No 267 Pt.
RERA Developer Bp Infra Projects Llp
Architect Chirag S Rayani
Project RERA Details
Project Type Residential / Group Housing
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Last Modified 16 Aug 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Goregaon West

Facilities & Amenities
Facilities, Amenities & Common areas details of DPS Parkviewlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
N A
Energy management
Na
Entrance Gate100% completed
95% Complete
N A
Fire Protection And Fire Safety Requirements100% completed
95% Complete
N A
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal100% completed
95% Complete
Na
Storm Water Drains95% completed
95% Complete
Work Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in DPS Parkview
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of DPS Parkviewby BP Infra Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

15637 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

151 apartments in total
Total
151
Booked
130
Available
21

Saleable Area Statistics (Sq. ft.)

81032 Total
Total
81032
Booked
69361
Available
11671
Total 151 apartments in project. 130 apartments booked. 86% apartments booked.
Total 7528.09 saleable area. 6443.79 apartments booked.
86% area booked.

Dps Park View

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dps Park ViewMay 2024231010094
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.28 Sq.mts. ( 412 Sq.ft. )26
24 Booked92% Booked
92% Booked
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )10
8 Booked80% Booked
80% Booked
1 BHK41.06 Sq.mts. ( 442 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK42.36 Sq.mts. ( 456 Sq.ft. )12
10 Booked83% Booked
83% Booked
1RK23.97 Sq.mts. ( 258 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK51.84 Sq.mts. ( 558 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK52.03 Sq.mts. ( 560 Sq.ft. )19
17 Booked89% Booked
89% Booked
2 BHK55.09 Sq.mts. ( 593 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK55.65 Sq.mts. ( 599 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK55.74 Sq.mts. ( 600 Sq.ft. )25
25 Booked100% Booked
100% Booked
2 BHK56.58 Sq.mts. ( 609 Sq.ft. )18
11 Booked61% Booked
61% Booked
2 BHK59.83 Sq.mts. ( 644 Sq.ft. )12
10 Booked83% Booked
83% Booked
3 BHK66.24 Sq.mts. ( 713 Sq.ft. )2
2 Booked100% Booked
100% Booked
151 total apartments / 130 apartments booked. 86% apartments booked.
Work Description in Building Dps Park ViewCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
BP Infra Group
for Project
Dps Park View
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About BP Infra Group

BP Infra Group