DLH Mamta Project at Andheri West by DLH (P51800016215)
  • Rating: 5.0
  • (146)

DLH Mamta - Andheri West

DLH
Project Details, Configuration & Prices
2 BHK711 Sq.ft. Carpet ₹ 2.75 Cr ++
3 BHK840 Sq.ft. Carpet ₹ 3.25 Cr ++
Project overview
DLH Mamta Project at Andheri West by DLH (P51800016215) a Sold Out Project with 2/3 BHK apartments / Flats starting from ₹ 2.8 Crs onwards

DLH Mamta is a residential project situated near Juhu Circle, right next to TheClub in Andheri West. Andheri West is the location of this residential complex, known for its vibrant atmosphere and convenient access to nearby attractions and amenities. Walking distance to D.N Nagar Metro Station. 2 minutes to Juhu Circle and 10 minutes to Andheri Station. Close proximity to the social infrastructure. 3 wings of 3 Basements + Stilt + 15 Storey Tower. It offers Ready to move 2 BHK Residences. These apartments are fully air-conditioned and provide rooftop amenities. Apartments are either Garden facing or TheClub facing. Amenities include Open to sky garden, Gym, Box Cricket, Yoga Area and many more.
DLH Mamta QR Code
DLH Mamta
MahaRERA - P51800016215

Transcon Triumph - Tower 4

₹ 2.97 Crs. onwards
Andheri West
2/3 BHK apartments
View Details

Adani Linkbay Residences

₹ 3.25 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details

Bharat Altavistas

₹ 5.77 Crs. onwards
Andheri West
3/6 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 3 Crs. onwards
Andheri West
Office BHK apartments
View Details

DLF WestPark

₹ 4.2 Crs. onwards
Andheri West
3 BHK apartments
View Details
Andheri West
3/4 BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    DLH Mamta
  • Location:
  • Andheri West, D N Nagar
  • Const. Stage:
    Sold Out
  • Possession:
  • Parking:
    Open;Basement
  • Floors:
    15
Developer Details

DLH

  • Developer:
    DLH
  • Phone:
    02240383838
  • Website:
    www.dlh.co.in
  • Address:
  • Dev Land & Housing, 10th Floor, Dev Plaza, Opp Andheri Fire Brigade, S. V. Road Andheri (West) Mumbai.
Project Ratings
Project Amenities
Amenities offred in DLH Mamta
LIFESTYLE AMENITIES
Power BackupBalconyLandscaped gardenHigh speed elevatorsGymnasiumPOP finished wallsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 30 Mar 2023
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800016215
RERA Project Name Mamta
RERA Location Cts No 195 Pt Survey No 106A
RERA Developer Shivam Dev Infracon Pvt Ltd
Architect Kns
Project RERA Details
Project Type Others
Funding Bank PUNJAB NATIONAL BANK
Last Modified 24 Apr 2018
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of DLH Mamtalast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Wip
Landscaping & Tree Planting100% completed
95% Complete
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Wip
Water Supply100% completed
95% Complete
Wip
Buildings / Wings in DLH Mamta
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of DLH Mamtaby DLHlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

16423 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

96 apartments in total
Total
96
Booked
0
Available
96

Saleable Area Statistics (Sq. ft.)

67401 Total
Total
67401
Booked
0
Available
67401
Total 96 apartments in project. 0 apartments booked. 0% apartments booked.
Total 6261.73 saleable area. 0 apartments booked.
0% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AMar 202216131001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.22 Sq.mts. ( 605 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 202216131001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK63.43 Sq.mts. ( 683 Sq.ft. )38
None Booked0% Booked
0% Booked
3 BHK79.39 Sq.mts. ( 855 Sq.ft. )12
None Booked0% Booked
0% Booked
50 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CMar 202216131001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK63.12 Sq.mts. ( 679 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK63.43 Sq.mts. ( 683 Sq.ft. )29
None Booked0% Booked
0% Booked
44 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
DLH
for Project
Mamta
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About DLH

DLH Trust is the glue of life. It is the most essential ingredient in effective long lasting partnership. It is the founding principle that holds all transactions and every relationship. DLH steers relationships on the foundation of trust. The path of trust channels our every endeavour in making what has been promised, on time and every time, thus shaping up our maxims and making us stronger, better and reliable. The DLH Team is driven by passion, steered by determination and puts in every effort to earn trust through its deliverables. For us, to be trusted is a greater compliment than being admired. The proof of which can be seen in our legacy of being the preferred brand in the space of redevelopment, where a host of families placed their trust in us by giving their old homes to us to deliver them their new homes.