Devbhoomi Project at Jogeshwari by Metro Capital (P51800050788)
  • Rating:
  • ()

Devbhoomi - Jogeshwari

Project Details, Configuration & Prices
1 BHK384 Sq.ft. Carpet ₹ 1.30 Cr ++
2 BHK507 Sq.ft. Carpet ₹ 1.95 Cr ++
3 BHK709 Sq.ft. Carpet ₹ 2.35 Cr ++
Project overview
Devbhoomi Project at Jogeshwari by Metro Capital (P51800050788) is a RERA approved Under Construction Project with RERA ID P51800050788 slated to be ready for possession by Dec 2026 with 1/2/3 BHK apartments / Flats starting from ₹ 1.3 Crs onwards

Devbhoomi is a Residential Project Developed by the Metro Capital. It is located at Jogeshwari East. Jogeshwari East enjoys good connectivity to various parts of Mumbai. The Jogeshwari-Vikhroli Link Road (JVLR) and the Western Express Highway are major roadways that connect Jogeshwari East to other parts of the city. The Jogeshwari railway station, located on the Western Line of the Mumbai Suburban Railway, provides convenient train services for daily commuters. 5 minutes walk to Jogeshwari Station and Mogra Metro station. 10 mins Walk to JVLR Metro Station. Excellent Connectivity. Two towers with 2 basement + 1 podium + 17 habitable floors. The Project offers 1,2 and 3 BHK Residences. Low Density Project, gated community. 2 Basements with Surface Parking. 30+ World Class Amenities including 2 Swimming Pools. Shree Ganesha Temple inside the project premises. Unobstructed views of Lush Green National Heritage Site.
Devbhoomi QR Code
Devbhoomi
MahaRERA - P51800050788

Lodha Belair

₹ 1.87 Crs. onwards
Jogeshwari
2/3 BHK apartments
View Details

Roswalt Zaiden

₹ 1.18 Crs. onwards
Jogeshwari
1/2/4 BHK apartments
View Details

Sanghvi Sapphire

₹ 1.49 Crs. onwards
Jogeshwari
2 BHK apartments
View Details

Dream India Jogeshwari

₹ 91.63 Lacs. onwards
Jogeshwari
1/2/3 BHK apartments
View Details

Sigma Jade

₹ 1 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Aim Gardens

₹ 1.09 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Codename Connexted

₹ 1.09 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Aim Paradise

₹ 1 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Devbhoomi
  • Location:
  • Jogeshwari, Natwar Nagar, Road No 1
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Parking:
    Basement
  • Floors:
    17
Developer Details

  • Developer:
    Metro Capital
  • Phone:
  • Website:
    www.metrocapitalmumbai.com
  • Address:
  • 837, 11 M.H.B Colony, Kalachowki Abhudaya Nagar, Mumbai
Project Ratings
Project Brochures
Brochures of Devbhoomiby Metro Capital
Project Brochures
  • MPE/Brochures/30634/Metro Devbhoomi Brochure.pdf
Project Amenities
Amenities offred in Devbhoomi
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800050788
RERA Project Name Devbhoomi
RERA Location 303
RERA Developer Metro Capital
Architect S P Shevade & Associates
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 18 Feb 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Jogeshwari

Facilities & Amenities
Facilities, Amenities & Common areas details of Devbhoomilast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Work Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply
Work Not Started
Buildings / Wings in Devbhoomi
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Devbhoomiby Metro Capitallast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

31095 Sq. ft.

Project Area

5701 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

106 apartments in total
Total
106
Booked
13
Available
93

Saleable Area Statistics (Sq. ft.)

62498 Total
Total
62498
Booked
8153
Available
54346
Total 106 apartments in project. 13 apartments booked. 12% apartments booked.
Total 5806.25 saleable area. 757.41 apartments booked.
13% area booked.

Devbhoomi Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Devbhoomi Wing ADec 2026141211509
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.07 Sq.mts. ( 614 Sq.ft. )41
12 Booked29% Booked
29% Booked
3 BHK72.57 Sq.mts. ( 781 Sq.ft. )12
3 BHK80.67 Sq.mts. ( 868 Sq.ft. )1
None Booked0% Booked
0% Booked
54 total apartments / 13 apartments booked. 24% apartments booked.
Work Description in Building Devbhoomi Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked

Devbhoomi Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Devbhoomi Wing BDec 2026912118120
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.68 Sq.mts. ( 384 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK40.01 Sq.mts. ( 431 Sq.ft. )9
None Booked0% Booked
0% Booked
1.5 BHK47.12 Sq.mts. ( 507 Sq.ft. )17
None Booked0% Booked
0% Booked
2 BHK52.85 Sq.mts. ( 569 Sq.ft. )9
None Booked0% Booked
0% Booked
2.5 BHK65.85 Sq.mts. ( 709 Sq.ft. )9
None Booked0% Booked
0% Booked
52 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Devbhoomi Wing BCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
work-in-progress90% done
90% Booked
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked
Project Consultants
Channel Partners Registered by Developer
Metro Capital
for Project
Devbhoomi
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Metro Capital