DELTA PALMBEACH Project at Nerul by Delta Group (P51700052109)
  • Rating:
  • ()

DELTA PALMBEACH - Nerul

Project Details, Configuration & Prices
3 BHK1258 Sq.ft. Carpet ₹ 3.52 Cr ++
4 BHK1884 Sq.ft. Carpet ₹ 4.35 Cr ++
Project overview
DELTA PALMBEACH Project at Nerul by Delta Group (P51700052109) is a RERA approved Under Construction Project with RERA ID P51700052109 slated to be ready for possession by Jun 2031 with 3/4 BHK apartments / Flats starting from N/A onwards

Delta Palm Beach is a landmark residential development by Delta Elite, crafted for those who seek refined living in one of Navi Mumbai’s most prestigious locations. Set against the scenic backdrop of Palm Beach, Nerul, this premium address brings together elegant architecture, expansive homes, and a lifestyle defined by comfort and exclusivity. Rising gracefully to G+14 floors with 13 wings, Delta Palm Beach offers a range of thoughtfully designed 3 BHK and 4 BHK luxurious flats. The residences are spacious and well-planned, featuring stunning Palm Beach views, vibrant city views, and podium-facing homes that enhance both privacy and aesthetics. Each flat is designed to maximize light, ventilation, and a sense of openness. Residents can unwind with serene Palm Beach vistas that create a calm and relaxing atmosphere, making everyday living feel like a retreat. Complementing the homes is an impressive selection of 40+ lifestyle amenities, curated to cater to wellness, recreation, and social living for all age groups. Strategically located at Plot No. 05, Sector 46A, Palm Beach, Nerul, Navi Mumbai, the project enjoys seamless connectivity via Palm Beach Road and easy access to key business hubs, social infrastructure, and daily conveniences. Delta Palm Beach stands as an ideal choice for families and discerning buyers looking for luxury flats in Nerul with unmatched views and long-term value.
DELTA PALMBEACH QR Code
DELTA PALMBEACH
MahaRERA - P51700052109

Mark 1

₹ 86.36 Lacs. onwards
Nerul
Office BHK apartments
View Details

Emperia Icon

₹ 47.7 Lacs. onwards
Nerul
Office BHK apartments
View Details

Delta Stellar

₹ 5.79 Crs. onwards
Nerul
Office BHK apartments
View Details
Nerul
3/3½ BHK apartments
View Details
Nerul
Office BHK apartments
View Details
Nerul
2 BHK apartments
View Details
Nerul
2/3 BHK apartments
View Details

24 High

₹ 48.75 Lacs. onwards
Nerul
Office BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    DELTA PALMBEACH
  • Location:
  • Nerul, Palm Beach Road
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2031
  • Parking:
    Podium;
  • Floors:
    14
Developer Details

  • Developer:
    Delta Group
  • Phone:
    02227560450
  • Website:
    www.thedeltagroup.co.in
  • Address:
  • V Times Square, Level 13th, Plot No. 3, Sector-15, Palm Beach Road, C.B.D. Belapur
Project Ratings
Project Amenities
Amenities offred in DELTA PALMBEACH
LIFESTYLE AMENITIES
Kid's play areaJogging TrackGymnasiumConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2031
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700052109
RERA Project Name Delta Palmbeach
RERA Location Plot No. 05, Sector-46A, Nerul
RERA Developer Balaji Corporation
Architect Dimensions Architects Pvt Ltd
Project RERA Details
Project Type Others
Funding Bank AXIS BANK
Last Modified 18 Aug 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Nerul

Facilities & Amenities
Facilities, Amenities & Common areas details of DELTA PALMBEACHlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room And Substation
Energy management
Solar Panel Provided
Fire Protection And Fire Safety Requirements
As Per Fire Noc
Landscaping & Tree Planting
240 Nos Of Trees To Be Planted
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Tank
Water Supply
Connection From Nmmc After Completion
Buildings / Wings in DELTA PALMBEACH
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of DELTA PALMBEACHby Delta Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

258336 Sq. ft.

Project Area

35497 Sq. ft.

Recreational Open Space

Total 13

Wings / Towers in Project

Apartments Statistics

803 apartments in total
Total
803
Booked
20
Available
783

Saleable Area Statistics (Sq. ft.)

1020814 Total
Total
1020814
Booked
22839
Available
997975
Total 803 apartments in project. 20 apartments booked. 2% apartments booked.
Total 94835.94 saleable area. 2121.84 apartments booked.
2% area booked.

A- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A- WingJun 20311513100145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK67.16 Sq.mts. ( 723 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK67.17 Sq.mts. ( 723 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK139.6 Sq.mts. ( 1503 Sq.ft. )12
None Booked0% Booked
0% Booked
3 BHK140.28 Sq.mts. ( 1510 Sq.ft. )14
None Booked0% Booked
0% Booked
4 BHK198.99 Sq.mts. ( 2142 Sq.ft. )28
None Booked0% Booked
0% Booked
5 BHK & more713.27 Sq.mts. ( 7678 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop69.43 Sq.mts. ( 747 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop87.87 Sq.mts. ( 946 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop108.15 Sq.mts. ( 1164 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop42.82 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop46.33 Sq.mts. ( 499 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop62.27 Sq.mts. ( 670 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop63.25 Sq.mts. ( 681 Sq.ft. )1
None Booked0% Booked
0% Booked
64 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A- WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress31% done
31% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress22% done
22% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B- WingJun 20311513100145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK64.13 Sq.mts. ( 690 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK137.59 Sq.mts. ( 1481 Sq.ft. )58
Shop69.42 Sq.mts. ( 747 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.82 Sq.mts. ( 461 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.33 Sq.mts. ( 499 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop62.27 Sq.mts. ( 670 Sq.ft. )2
None Booked0% Booked
0% Booked
68 total apartments / 2 apartments booked. 2% apartments booked.
Work Description in Building B- WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress37% done
37% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress23% done
23% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C- WingJun 20311513100145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK60.94 Sq.mts. ( 656 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK137.65 Sq.mts. ( 1482 Sq.ft. )28
None Booked0% Booked
0% Booked
4 BHK151.71 Sq.mts. ( 1633 Sq.ft. )30
Shop62.33 Sq.mts. ( 671 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop69.5 Sq.mts. ( 748 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.87 Sq.mts. ( 461 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.38 Sq.mts. ( 499 Sq.ft. )2
None Booked0% Booked
0% Booked
68 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building C- WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress31% done
31% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress22% done
22% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D- WingJun 20311513100145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK63.71 Sq.mts. ( 686 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK151.56 Sq.mts. ( 1631 Sq.ft. )58
Shop69.42 Sq.mts. ( 747 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.82 Sq.mts. ( 461 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.33 Sq.mts. ( 499 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop62.27 Sq.mts. ( 670 Sq.ft. )2
None Booked0% Booked
0% Booked
68 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building D- WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress37% done
37% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress23% done
23% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

E- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E- WingJun 20311513100145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK60.94 Sq.mts. ( 656 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK137.6 Sq.mts. ( 1481 Sq.ft. )43
None Booked0% Booked
0% Booked
4 BHK182.83 Sq.mts. ( 1968 Sq.ft. )15
None Booked0% Booked
0% Booked
Shop62.21 Sq.mts. ( 670 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop69.43 Sq.mts. ( 747 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop73.74 Sq.mts. ( 794 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop91.22 Sq.mts. ( 982 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop42.82 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop46.33 Sq.mts. ( 499 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop53.95 Sq.mts. ( 581 Sq.ft. )1
None Booked0% Booked
0% Booked
67 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E- WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress20% done
20% Booked
X number of Podiums
X number of Slabs of Super Structure

F- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F- WingJun 20311313100114
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK71.64 Sq.mts. ( 771 Sq.ft. )24
6 Booked25% Booked
25% Booked
3 BHK92.59 Sq.mts. ( 997 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK104.93 Sq.mts. ( 1129 Sq.ft. )11
None Booked0% Booked
0% Booked
3 BHK109.34 Sq.mts. ( 1177 Sq.ft. )13
None Booked0% Booked
0% Booked
50 total apartments / 6 apartments booked. 12% apartments booked.
Work Description in Building F- WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

G- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G- WingJun 20311313100114
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK104.93 Sq.mts. ( 1129 Sq.ft. )22
None Booked0% Booked
0% Booked
3 BHK109.34 Sq.mts. ( 1177 Sq.ft. )26
None Booked0% Booked
0% Booked
3 BHK125.34 Sq.mts. ( 1349 Sq.ft. )2
None Booked0% Booked
0% Booked
50 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building G- WingCompletion
Basement (if any)
work-in-progress25% done
25% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress25% done
25% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

H- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H- WingJun 20311413100124
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.9 Sq.mts. ( 763 Sq.ft. )12
None Booked0% Booked
0% Booked
3 BHK91.13 Sq.mts. ( 981 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK104.72 Sq.mts. ( 1127 Sq.ft. )11
None Booked0% Booked
0% Booked
3 BHK109.41 Sq.mts. ( 1178 Sq.ft. )13
3 BHK117.75 Sq.mts. ( 1267 Sq.ft. )28
Shop37.26 Sq.mts. ( 401 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop40.92 Sq.mts. ( 440 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop47.03 Sq.mts. ( 506 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop49.47 Sq.mts. ( 532 Sq.ft. )2
None Booked0% Booked
0% Booked
74 total apartments / 3 apartments booked. 4% apartments booked.
Work Description in Building H- WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

I- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I- WingJun 20311413100124
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK117.68 Sq.mts. ( 1267 Sq.ft. )50
3 BHK138.81 Sq.mts. ( 1494 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop36.5 Sq.mts. ( 393 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop37.74 Sq.mts. ( 406 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop44.6 Sq.mts. ( 480 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop47.44 Sq.mts. ( 511 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop49.88 Sq.mts. ( 537 Sq.ft. )2
None Booked0% Booked
0% Booked
60 total apartments / 2 apartments booked. 3% apartments booked.
Work Description in Building I- WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

J- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
J- WingJun 20311413100124
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK117.68 Sq.mts. ( 1267 Sq.ft. )50
3 BHK138.81 Sq.mts. ( 1494 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop36.5 Sq.mts. ( 393 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop37.74 Sq.mts. ( 406 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop44.6 Sq.mts. ( 480 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop47.44 Sq.mts. ( 511 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop49.88 Sq.mts. ( 537 Sq.ft. )2
None Booked0% Booked
0% Booked
60 total apartments / 3 apartments booked. 5% apartments booked.
Work Description in Building J- WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

K- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K- WingJun 20311413100124
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.9 Sq.mts. ( 763 Sq.ft. )12
3 BHK91.13 Sq.mts. ( 981 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK104.72 Sq.mts. ( 1127 Sq.ft. )11
None Booked0% Booked
0% Booked
3 BHK109.41 Sq.mts. ( 1178 Sq.ft. )13
None Booked0% Booked
0% Booked
3 BHK117.75 Sq.mts. ( 1267 Sq.ft. )28
None Booked0% Booked
0% Booked
Shop37.26 Sq.mts. ( 401 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop40.92 Sq.mts. ( 440 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop47.03 Sq.mts. ( 506 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop49.47 Sq.mts. ( 532 Sq.ft. )2
None Booked0% Booked
0% Booked
74 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building K- WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

L- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L- WingJun 20311313100114
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK104.93 Sq.mts. ( 1129 Sq.ft. )22
None Booked0% Booked
0% Booked
3 BHK109.34 Sq.mts. ( 1177 Sq.ft. )26
None Booked0% Booked
0% Booked
3 BHK125.34 Sq.mts. ( 1349 Sq.ft. )2
None Booked0% Booked
0% Booked
50 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building L- WingCompletion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

M- Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
M- WingJun 20311313100113
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK104.93 Sq.mts. ( 1129 Sq.ft. )22
None Booked0% Booked
0% Booked
3 BHK109.34 Sq.mts. ( 1177 Sq.ft. )26
3 BHK125.34 Sq.mts. ( 1349 Sq.ft. )2
None Booked0% Booked
0% Booked
50 total apartments / 1 apartments booked. 2% apartments booked.
Work Description in Building M- WingCompletion
Basement (if any)
Excavation
work-in-progress20% done
20% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Delta Group
for Project
Delta Palmbeach
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Delta Group