Codename Lush Green Project at Dombivali by GLS Infrastructure (P51700052958)
  • Rating:
  • ()

Codename Lush Green - Dombivali

Project Details, Configuration & Prices
1 BHK422 Sq.ft. Carpet ₹ 42 Lacs All in
2 BHK564 Sq.ft. Carpet ₹ 57 Lacs All in
Project overview
Codename Lush Green Project at Dombivali by GLS Infrastructure (P51700052958) is a RERA approved Under Construction Project with RERA ID P51700052958 slated to be ready for possession by May 2026 with 1/2 BHK apartments / Flats starting from ₹ 42 Lakh onwards

Codename Lush Green is a Residential Project Developed by the GLS Infrastructure. It is located at Dombivali East. The locality is well-connected to various parts of Mumbai and neighbouring areas. Proximity to Dombivli station., Upcoming Metro Station, Schools, Colleges, Market Places & Kalyan-shil Highway. It is a 14 storey tower. The project offers 1 & 2 BHK Fully Furnished AC Homes with lavish sun decks. Per floor 10 flats. 6- 1bhk and 4- 2bhk Biggest carpet in Affordable segment. State-of-Art Rooftop Amenities.
Codename Lush Green QR Code
Codename Lush Green
MahaRERA - P51700052958

Lodha Codename Central

₹ 49.82 Lacs. onwards
Dombivali
1/2/3 BHK apartments
View Details

Lodha Crown

₹ 36 Lacs. onwards
Dombivali
1/3 BHK apartments
View Details

Lodha Serenity

₹ 1.5 Crs. onwards
Dombivali
3/Duplex/Pent House BHK apartments
View Details

Runwal Gardens - Phase 1&2

₹ 79 Lacs. onwards
Dombivali
2/3 BHK apartments
View Details

Runwal My City - Phase 2

₹ 45 Lacs. onwards
Dombivali
1/2/3 BHK apartments
View Details

Sai world Dreams

₹ 48 Lacs. onwards
Dombivali
1/2/2½/3 BHK apartments
View Details

Central Avenue

₹ 45.5 Lacs. onwards
Dombivali
1/2 BHK apartments
View Details

Runwal My City - Cluster 5

₹ 41.5 Lacs. onwards
Dombivali
1/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Codename Lush Green
  • Location:
  • Dombivali, Next To Regency Estate
  • Const. Stage:
    Under Construction
  • Possession:
    May 2026
  • Floors:
    14
Developer Details

  • Developer:
    GLS Infrastructure
  • Phone:
  • Website:
  • Address:
  • Dombivali East
Project Ratings
Project Brochures
Brochures of Codename Lush Greenby GLS Infrastructure
Project Brochures
  • MPE/Brochures/30639/Codename Lush Green Brochure.pdf
Project Amenities
Amenities offred in Codename Lush Green
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringAir ConditionersGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700052958
RERA Project Name Sai Dream One
RERA Location S No.88, H No 6 & 7
RERA Developer Gls Infrastructures
Architect Decon Associates
Project RERA Details
Project Type Residential / Group Housing
Funding Bank AXIS BANK
Last Modified 06 Jun 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Dombivali

Facilities & Amenities
Facilities, Amenities & Common areas details of Codename Lush Greenlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
1 Electric Meter Room/Space For Each Will Be Insta
Energy management
Solar System
Fire Protection And Fire Safety Requirements
Fire Safety Measure Will Be Installed
Landscaping & Tree Planting
Minimum 27 Trees
Open Parking
As Per Sanctioned Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
The Building Sewarage Will Be Connected With Kdmc
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Water Supply Will Be Provided By Kdmc
Buildings / Wings in Codename Lush Green
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Codename Lush Greenby GLS Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

28094 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

68 apartments in total
Total
68
Booked
0
Available
68

Saleable Area Statistics (Sq. ft.)

29709 Total
Total
29709
Booked
0
Available
29709
Total 68 apartments in project. 0 apartments booked. 0% apartments booked.
Total 2760 saleable area. 0 apartments booked.
0% area booked.

Sunflower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SunflowerDec 202561000990
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36 Sq.mts. ( 388 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK37 Sq.mts. ( 398 Sq.ft. )18
None Booked0% Booked
0% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK49 Sq.mts. ( 527 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK52 Sq.mts. ( 560 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK53 Sq.mts. ( 570 Sq.ft. )12
None Booked0% Booked
0% Booked
Shop15 Sq.mts. ( 161 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21 Sq.mts. ( 226 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23 Sq.mts. ( 248 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24 Sq.mts. ( 258 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31 Sq.mts. ( 334 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32 Sq.mts. ( 344 Sq.ft. )1
None Booked0% Booked
0% Booked
68 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building SunflowerCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress23% done
23% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress30% done
30% Booked
Project Consultants
Channel Partners Registered by Developer
GLS Infrastructure
for Project
Sai Dream One
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About GLS Infrastructure