Chavan Advaitam Project at Kalyan by The House of Chavan (P51700046731)
  • Rating:
  • ()

Chavan Advaitam - Kalyan

Project Details, Configuration & Prices
2 BHK821 Sq.ft. Carpet ₹ 1.20 Cr All in
2 BHK806 Sq.ft. Carpet ₹ 1.18 Cr All in
3 BHK1128 Sq.ft. Carpet ₹ 1.70 Cr All in
Project overview
Chavan Advaitam Project at Kalyan by The House of Chavan (P51700046731) is a RERA approved Under Construction Project with RERA ID P51700046731 slated to be ready for possession by Dec 2026 with 2/3 BHK apartments / Flats starting from ₹ 1.18 Crs onwards

Chavan Advaitam by The House of Chavan is located in Kalyan West, Kalyan West is a locality situated in the city of Kalyan, which is part of the Thane district in Maharashtra, India. Kalyan is a rapidly developing city and an important suburb in the Mumbai Metropolitan Region (MMR). Kalyan West's strategic location, affordable housing options, connectivity, and growing infrastructure make it an attractive residential destination. It is a 32 storey tower which comes up with lavishing 2 BHK and 3 BHK, All prices are subject to floor rise 9th above. The project has all the modern and up to date amenities. RERA Registered.
Chavan Advaitam QR Code
Chavan Advaitam
MahaRERA - P51700046731

Lodha Palava Aquaville

₹ 46.21 Lacs. onwards
Kalyan
1/1½/2/2½/3/5 BHK apartments
View Details

Birla Vanya

₹ 63 Lacs. onwards
Kalyan
1/2/3/4 BHK apartments
View Details

Metroplex

₹ 42.5 Lacs. onwards
Kalyan
1/2/2½ BHK apartments
View Details

Raunak City Phase 6

₹ 39.77 Lacs. onwards
Kalyan
1/2/3/4 BHK apartments
View Details

Tycoons Orbis

₹ 89.99 Lacs. onwards
Kalyan
2 BHK apartments
View Details

Kalyan Vihar

₹ 32.99 Lacs. onwards
Kalyan
1 BHK apartments
View Details

Hiranandani Woodspring

₹ 62.3 Lacs. onwards
Kalyan
1/2 BHK apartments
View Details

Cornerstone

₹ 55.1 Lacs. onwards
Kalyan
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Chavan Advaitam
  • Location:
  • Kalyan, Murbad - Bhiwandi Highway, Opp. Kotak Mahindra Bank,
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Floors:
    32
Developer Details

  • Developer:
    The House of Chavan
  • Phone:
  • Website:
    www.thehouseofchavan.com
  • Address:
  • 402, 4th Floor, Ramkrishna Bhavan-2, Sahajanand Chowk, Kalyan West.
Project Ratings
Project Brochures
Brochures of Chavan Advaitamby The House of Chavan
Project Brochures
  • MPE/Brochures/30391/Chavan Advaitam Brochure.pdf
Project Amenities
Amenities offred in Chavan Advaitam
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaGymnasiumClub HouseSwimming PoolIntercom/CCTVVideo Door PhonesVitrified flooringModular KitchenGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700046731
RERA Project Name Chavan Advaitam
RERA Location S.No.9 H.No. 3/1/2/2/C/1, 3/1/2/2/C/2 & S. No.15 H.No.4/1
RERA Developer Saideep Constructions
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 27 Mar 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Kalyan

Facilities & Amenities
Facilities, Amenities & Common areas details of Chavan Advaitamlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Kdmc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room And D G Set Is Proposed
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
As Per Kdmc Noc
Open Parking
As Per Kdmc Sanction
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Proposed
Solid Waste Management And Disposal
As Per Moef Guidelines
Storm Water Drains
As Per Kdmc Noc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Disposal Of Sewage And Sullage Water Through Stp
Water Conservation, Rain water Harvesting
Rain Water Harvesting By Recharging Thru Borewell
Water Supply
As Per Kdmc
Buildings / Wings in Chavan Advaitam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Chavan Advaitamby The House of Chavanlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

63466 Sq. ft.

Project Area

6340 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

276 apartments in total
Total
276
Booked
128
Available
148

Saleable Area Statistics (Sq. ft.)

205351 Total
Total
205351
Booked
86299
Available
119053
Total 276 apartments in project. 128 apartments booked. 46% apartments booked.
Total 19077.61 saleable area. 8017.35 apartments booked.
42% area booked.

Building No 1 Advaitam Plaza/Villament

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1 Advaitam Plaza/VillamentDec 20262910105441
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64 Sq.mts. ( 689 Sq.ft. )11
4 Booked36% Booked
36% Booked
2 BHK64.21 Sq.mts. ( 691 Sq.ft. )11
6 Booked54% Booked
54% Booked
2 BHK64.22 Sq.mts. ( 691 Sq.ft. )11
6 Booked54% Booked
54% Booked
2 BHK64.42 Sq.mts. ( 693 Sq.ft. )11
7 Booked63% Booked
63% Booked
2 BHK65.58 Sq.mts. ( 706 Sq.ft. )42
17 Booked40% Booked
40% Booked
2 BHK65.59 Sq.mts. ( 706 Sq.ft. )14
6 Booked42% Booked
42% Booked
2 BHK65.78 Sq.mts. ( 708 Sq.ft. )60
33 Booked55% Booked
55% Booked
3 BHK92.39 Sq.mts. ( 994 Sq.ft. )22
9 Booked40% Booked
40% Booked
3 BHK92.78 Sq.mts. ( 999 Sq.ft. )22
6 Booked27% Booked
27% Booked
Office space101.29 Sq.mts. ( 1090 Sq.ft. )10
None Booked0% Booked
0% Booked
Office space18.61 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space50.7 Sq.mts. ( 546 Sq.ft. )10
None Booked0% Booked
0% Booked
Office space55 Sq.mts. ( 592 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space77.43 Sq.mts. ( 833 Sq.ft. )4
None Booked0% Booked
0% Booked
Office space127.61 Sq.mts. ( 1374 Sq.ft. )5
None Booked0% Booked
0% Booked
Shop77.43 Sq.mts. ( 833 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.72 Sq.mts. ( 438 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop106.52 Sq.mts. ( 1147 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop107.82 Sq.mts. ( 1161 Sq.ft. )2
None Booked0% Booked
0% Booked
240 total apartments / 96 apartments booked. 40% apartments booked.
Work Description in Building Building No 1 Advaitam Plaza/VillamentCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress24% done
24% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2 Avaitam Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2 Avaitam HeightsDec 202471110591
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.18 Sq.mts. ( 389 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK37.51 Sq.mts. ( 404 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK49.98 Sq.mts. ( 538 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK50.25 Sq.mts. ( 541 Sq.ft. )7
4 Booked57% Booked
57% Booked
35 total apartments / 31 apartments booked. 88% apartments booked.
Work Description in Building Building No 2 Avaitam HeightsCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 3 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 BunglowDec 20241100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow106.81 Sq.mts. ( 1150 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Building No 3 BunglowCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
The House of Chavan
for Project
Chavan Advaitam
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About The House of Chavan