Cementers Tavisa Project at Malad West by Cementers Developers (P51800047974)
  • Rating:
  • ()

Cementers Tavisa - Malad West

Project Details, Configuration & Prices
1 BHK434 Sq.ft. Carpet ₹ 1.32 Cr All In
2 BHK557 Sq.ft. Carpet ₹ 1.75 Cr All In
4 BHK1140 Sq.ft. Carpet ₹ 3.5 Cr All In
Project overview
Cementers Tavisa Project at Malad West by Cementers Developers (P51800047974) is a Ready Possession Project with 1/2/4 BHK apartments / Flats starting from ₹ 1.32 Crs onwards

Introducing Tavisa by Cementers, offering possession in just 2 months. Located conveniently on Link Road, with a mere 1-minute distance to the metro station near Landmark Restaurant in Malad West, it promises both accessibility and comfort. This structure comprises a ground floor with a commercial area and 8 residential floors. The amenities include a terrace garden, toddler play area, senior citizen sitting area, and a fully equipped gymnasium. Enjoy additional terrace amenities such as swings for toddlers, a meditation/yoga zone, green areas, and cabana seating. The project boasts premium features like sanitary fittings, branded lifts, vitrified flooring, Vastu-compliant flats, rainwater harvesting, stacker car parking, CCTV surveillance, and a health club, ensuring a modern and convenient lifestyle for residents.
Cementers Tavisa QR Code
Cementers Tavisa
MahaRERA - P51800047974

Marina Enclave

₹ 1.41 Crs. onwards
Malad West
2/3 BHK apartments
View Details

9 Business Bay

₹ 1.41 Crs. onwards
Malad West
Office BHK apartments
View Details

Auris Clara

₹ 1.79 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Raheja Exotica Siena

₹ 85 Lacs. onwards
Malad West
1 BHK apartments
View Details

Arkade Eden

₹ 2.24 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Auris Ilaria

₹ 1.08 Crs. onwards
Malad West
1/2/3 BHK apartments
View Details

Sheth Irene

₹ 1.1 Crs. onwards
Malad West
1/2 BHK apartments
View Details

Raheja Exotica Verona

₹ 3.4 Crs. onwards
Malad West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Cementers Tavisa
  • Location:
  • Malad West, New Link Road
  • Const. Stage:
    Ready Possession
  • Possession:
  • Floors:
    9
Developer Details

  • Developer:
    Cementers Developers
  • Phone:
  • Website:
    https://www.cementers.in
  • Address:
  • 002, B-Wing, Parijat Tower, Saki Vihar Road, Saki Naka, Andheri East, Mumbai - 400072
Project Ratings
Project Brochures
Brochures of Cementers Tavisaby Cementers Developers
Project Brochures
  • MPE/Brochures/31125/Tavisa Brouchers New.pdf
Project Amenities
Amenities offred in Cementers Tavisa
LIFESTYLE AMENITIES
High speed elevatorsGrand entrance lobbyAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Apr 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800047974
RERA Project Name Cementers Tavisa
RERA Location 307/136
RERA Developer Cementers Developers
Architect Tanvi Dedhia
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 21 Feb 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad West

Facilities & Amenities
Facilities, Amenities & Common areas details of Cementers Tavisalast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply50% completed
50% Complete
Wip
Buildings / Wings in Cementers Tavisa
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Cementers Tavisaby Cementers Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

4117 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

22 apartments in total
Total
22
Booked
15
Available
7

Saleable Area Statistics (Sq. ft.)

11455 Total
Total
11455
Booked
8384
Available
3070
Total 22 apartments in project. 15 apartments booked. 68% apartments booked.
Total 1064.15 saleable area. 778.92 apartments booked.
73% area booked.

Cementers Tavisa

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Cementers TavisaApr 202591010510
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK20.53 Sq.mts. ( 221 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.96 Sq.mts. ( 290 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK40.34 Sq.mts. ( 434 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK51.72 Sq.mts. ( 557 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK53.62 Sq.mts. ( 577 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )1
1 Booked100% Booked
100% Booked
Commercial54.34 Sq.mts. ( 585 Sq.ft. )1
1 Booked100% Booked
100% Booked
Commercial72.93 Sq.mts. ( 785 Sq.ft. )1
1 Booked100% Booked
100% Booked
Tenant69.95 Sq.mts. ( 753 Sq.ft. )3
3 Booked100% Booked
100% Booked
Tenant44.15 Sq.mts. ( 475 Sq.ft. )1
1 Booked100% Booked
100% Booked
Tenant47.12 Sq.mts. ( 507 Sq.ft. )1
1 Booked100% Booked
100% Booked
Tenant49.77 Sq.mts. ( 536 Sq.ft. )1
1 Booked100% Booked
100% Booked
Tenant51.66 Sq.mts. ( 556 Sq.ft. )4
4 Booked100% Booked
100% Booked
Tenant16.46 Sq.mts. ( 177 Sq.ft. )1
1 Booked100% Booked
100% Booked
22 total apartments / 15 apartments booked. 68% apartments booked.
Work Description in Building Cementers TavisaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Cementers Developers
for Project
Cementers Tavisa
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Cementers Developers