• Rating: 4.3
  • (28)

This project is no longer available in our database.
Please use the adjoining search tools to find similar propjects.

-

Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Shagun White Mist

₹ 45.22 Lacs. onwards
Ulwe
1/2 BHK apartments
View Details

Insignia

₹ 1.05 Crs. onwards
Ulwe
Office BHK apartments
View Details
Ulwe
3 BHK apartments
View Details

White Nest

₹ 65 Lacs. onwards
Ulwe
1 BHK apartments
View Details
Ulwe
1/1 RK BHK apartments
View Details
Ulwe
1 BHK apartments
View Details
Ulwe
1 BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

bhagwati group

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
LIFESTYLE AMENITIES
Club HouseGrand entrance lobbyKid's play areaJogging TrackHigh speed elevatorsHealth ClubVitrified flooringPOP finished wallsIntercom/CCTVGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P52000004807
RERA Project Name Bhagwati Imperia
RERA Location Plot No.1,Sector-9,Ulwe,Navi Mumbai.
RERA Developer Bhagwati Developers
Architect Soyuz Talib Architects Pvt Ltd
Project RERA Details
Project Type Others
Funding Bank YES BANK
Last Modified 09 Aug 2017
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
In Later Scope Of Work
Community Buildings
As Per Approved Plans
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Approved Plans
Energy management
In Later Scope Of Work
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Approved Plans
Landscaping & Tree Planting90% completed
90% Complete
In Later Scope Of Work
Open Parking70% completed
70% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Approved Plans
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
In Later Scope Of Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water25% completed
25% Complete
Stp Provided
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply
Temporary Cidco Water Connection In Place
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

130243 Sq. ft.

Project Area

59170 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

341 apartments in total
Total
341
Booked
298
Available
43

Saleable Area Statistics (Sq. ft.)

180407 Total
Total
180407
Booked
156608
Available
23798
Total 341 apartments in project. 298 apartments booked. 87% apartments booked.
Total 16760.18 saleable area. 14549.25 apartments booked.
87% area booked.

Shopping

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShoppingDec 201811010177
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 123.79 Sq.mts. ( 256 Sq.ft. )7
7 Booked100% Booked
100% Booked
TYPE 1026.55 Sq.mts. ( 286 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1126.96 Sq.mts. ( 290 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1223.36 Sq.mts. ( 251 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1325.13 Sq.mts. ( 270 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1421.71 Sq.mts. ( 234 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1529.64 Sq.mts. ( 319 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1629.02 Sq.mts. ( 312 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1727.27 Sq.mts. ( 294 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1830.09 Sq.mts. ( 324 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 1928.34 Sq.mts. ( 305 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 226.91 Sq.mts. ( 290 Sq.ft. )2
2 Booked100% Booked
100% Booked
TYPE 2026.03 Sq.mts. ( 280 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 2127.01 Sq.mts. ( 291 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 2222.2 Sq.mts. ( 239 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 2327.38 Sq.mts. ( 295 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 2425.59 Sq.mts. ( 275 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 2520.67 Sq.mts. ( 222 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 344.07 Sq.mts. ( 474 Sq.ft. )2
2 Booked100% Booked
100% Booked
TYPE 428.97 Sq.mts. ( 312 Sq.ft. )20
20 Booked100% Booked
100% Booked
TYPE 528.73 Sq.mts. ( 309 Sq.ft. )4
4 Booked100% Booked
100% Booked
TYPE 629.74 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 774.74 Sq.mts. ( 805 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 814.68 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 922.44 Sq.mts. ( 242 Sq.ft. )1
1 Booked100% Booked
100% Booked
55 total apartments / 55 apartments booked. 100% apartments booked.
Work Description in Building ShoppingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2018141111028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 145.07 Sq.mts. ( 485 Sq.ft. )13
13 Booked100% Booked
100% Booked
TYPE 261.52 Sq.mts. ( 662 Sq.ft. )13
13 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2018141111028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 164.04 Sq.mts. ( 689 Sq.ft. )13
13 Booked100% Booked
100% Booked
TYPE 245.07 Sq.mts. ( 485 Sq.ft. )13
13 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJan 1900141111052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 164.29 Sq.mts. ( 692 Sq.ft. )26
9 Booked34% Booked
34% Booked
TYPE 243 Sq.mts. ( 463 Sq.ft. )26
None Booked0% Booked
0% Booked
52 total apartments / 9 apartments booked. 17% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 2018141111028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 145.07 Sq.mts. ( 485 Sq.ft. )13
13 Booked100% Booked
100% Booked
TYPE 263.84 Sq.mts. ( 687 Sq.ft. )13
13 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EDec 2018141111028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 145.38 Sq.mts. ( 488 Sq.ft. )26
26 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FDec 2018141111028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 163.84 Sq.mts. ( 687 Sq.ft. )13
13 Booked100% Booked
100% Booked
TYPE 245.07 Sq.mts. ( 485 Sq.ft. )13
13 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing GDec 2018141111052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 143 Sq.mts. ( 463 Sq.ft. )26
26 Booked100% Booked
100% Booked
TYPE 264.29 Sq.mts. ( 692 Sq.ft. )26
26 Booked100% Booked
100% Booked
52 total apartments / 52 apartments booked. 100% apartments booked.
Work Description in Building Wing GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing HDec 2018141111028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 145.07 Sq.mts. ( 485 Sq.ft. )13
13 Booked100% Booked
100% Booked
TYPE 264.04 Sq.mts. ( 689 Sq.ft. )13
13 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing IDec 2018141111029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 161.52 Sq.mts. ( 662 Sq.ft. )13
13 Booked100% Booked
100% Booked
TYPE 245.07 Sq.mts. ( 485 Sq.ft. )13
13 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Bhagwati Imperia
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation