Bandra North Phase 01 Project at Bandra East by Shivalik Ventures Private Limited (P51800014036)
  • Rating: 4.9
  • (225)

Bandra North Phase 01 - Bandra East

Shivalik Ventures Private Limited
Project Details, Configuration & Prices
1 BHK322 Sq.ft. Carpet ₹ 1.20 cr all incl
Project overview
Bandra North Phase 01 Project at Bandra East by Shivalik Ventures Private Limited (P51800014036) is a Ready Possession Project with 1 BHK apartments / Flats starting from ₹ 1.09 Crs onwards

Bandra North is a Residential Project Developed by Shivalik Ventures. It is located at Bandra East. Bandra East is well-connected to other parts of Mumbai. It is close to Bandra West, Kurla, and the Bandra-Kurla Complex (BKC), which is one of Mumbai's major business districts. The locality has excellent road and rail connectivity, with Bandra Railway Station and Kurla Railway Station nearby. The Chhatrapati Shivaji International Airport is also easily accessible from here. It is a 3 Basement+G+15 Storey Tower offering 1 and 2 BHK Residences. 12 wings with 4 flats per floor. Has all modern amenities and facilities. Possession by 2025.
Bandra North Phase 01 QR Code
Bandra North Phase 01
MahaRERA - P51800014036

Rustomjee Seasons - Wing D

₹ 6.18 Crs. onwards
Bandra East
3 BHK apartments
View Details

Rustomjee Aden

₹ 4.26 Crs. onwards
Bandra East
3 BHK apartments
View Details

Rustomjee Cleon

₹ 1.66 Crs. onwards
Bandra East
1/2 BHK apartments
View Details

Agami Eternity

₹ 4.53 Crs. onwards
Bandra East
2½/3 BHK apartments
View Details

Rustomjee Stella

₹ 2.67 Crs. onwards
Bandra East
2/3 BHK apartments
View Details

Rustomjee Prive

₹ 5.67 Crs. onwards
Bandra East
3 BHK apartments
View Details

BKC Edge

₹ 1.55 Crs. onwards
Bandra East
Office BHK apartments
View Details

Bandra North Phase 2

₹ 88 Lacs. onwards
Bandra East
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Bandra North Phase 01
  • Location:
  • Bandra East, Western Express Highway, Bandra Village
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open;
  • Floors:
    15
Developer Details

Shivalik Ventures Private Limited

  • Developer:
    Shivalik Ventures Private Limited
  • Phone:
    022 40836666
  • Website:
    www.shivalikventures.com
  • Address:
  • 1, Ground Floor, JV House, D.S Babrekar Marg, Prabhadevi Dadar (west), Mumbai 400 028
Project Ratings
Project Brochures
Brochures of Bandra North Phase 01by Shivalik Ventures Private Limited
Project Brochures
  • MPE/Brochures/23746/shivalik pdf brochure.pdf
Project Amenities
Amenities offred in Bandra North Phase 01
LIFESTYLE AMENITIES
Kid's play areaGrand entrance lobbyGymnasiumPower BackupIntercom/CCTVPOP finished wallsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 27 Aug 2023
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2026
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800014036
RERA Project Name Bandra North Gulmohar Avenue
RERA Location 30/547-551, 30/531, 30/581-789, 30/334-335, 30/529, Cts No 30/326-328, 30/533-534, 30/341, 30/343-416
RERA Developer Shivalik Ventures Private Limited
Architect Paarshad Associates
Project RERA Details
Project Type Others
Funding Bank AXIS BANK
Last Modified 02 Aug 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Bandra East

Facilities & Amenities
Facilities, Amenities & Common areas details of Bandra North Phase 01last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Commenced
CHILDERNS PLAY AREA
Not Commenced
Community Buildings
Not Commenced
DG SETS
Not Commenced
Electrical Meter Room, Sub-Station, Receiving Station
Not Commenced
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Commenced
Landscaping & Tree Planting
Not Commenced
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Commenced
Solid Waste Management And Disposal
Not Commenced
SPACE FOR FITNESS CENTER
Not Commenced
Storm Water Drains
Not Commenced
Street Lighting
Not Commenced
Treatment And Disposal Of Sewage And Sullage Water
Not Commenced
Water Conservation, Rain water Harvesting
Not Commenced
Water Supply
Not Commenced
Buildings / Wings in Bandra North Phase 01
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bandra North Phase 01by Shivalik Ventures Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

71234 Sq. ft.

Project Area

5705 Sq. ft.

Recreational Open Space

Total 13

Wings / Towers in Project

Apartments Statistics

742 apartments in total
Total
742
Booked
416
Available
326

Saleable Area Statistics (Sq. ft.)

271333 Total
Total
271333
Booked
135930
Available
135403
Total 742 apartments in project. 416 apartments booked. 56% apartments booked.
Total 25207.46 saleable area. 12628.25 apartments booked.
50% area booked.

Deleted

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
DeletedAug 20220000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
000 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
0000 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building DeletedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing AAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
30 Booked50% Booked
50% Booked
59 total apartments / 30 apartments booked. 50% apartments booked.
Work Description in Building Gulmohar Avenue Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing BAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
58 Booked98% Booked
98% Booked
59 total apartments / 58 apartments booked. 98% apartments booked.
Work Description in Building Gulmohar Avenue Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing CAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )58
58 Booked100% Booked
100% Booked
58 total apartments / 58 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing DAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )58
58 Booked100% Booked
100% Booked
58 total apartments / 58 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing EAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
59 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing FAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
59 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing GAug 2023151310039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.81 Sq.mts. ( 633 Sq.ft. )15
4 Booked26% Booked
26% Booked
2 BHK59.55 Sq.mts. ( 641 Sq.ft. )44
10 Booked22% Booked
22% Booked
SHOP5.04 Sq.mts. ( 54 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP6.48 Sq.mts. ( 70 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.79 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.83 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.13 Sq.mts. ( 206 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.56 Sq.mts. ( 211 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.78 Sq.mts. ( 213 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.94 Sq.mts. ( 215 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.48 Sq.mts. ( 220 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.99 Sq.mts. ( 226 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 23 apartments booked. 32% apartments booked.
Work Description in Building Gulmohar Avenue Wing GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing HAug 2023151310048
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.81 Sq.mts. ( 633 Sq.ft. )14
2 BHK59.55 Sq.mts. ( 641 Sq.ft. )45
SHOP7.67 Sq.mts. ( 83 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.25 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.18 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.54 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.28 Sq.mts. ( 208 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.6 Sq.mts. ( 211 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.8 Sq.mts. ( 213 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.37 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.01 Sq.mts. ( 226 Sq.ft. )1
None Booked0% Booked
0% Booked
68 total apartments / 9 apartments booked. 13% apartments booked.
Work Description in Building Gulmohar Avenue Wing HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing IAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
19 Booked32% Booked
32% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.28 Sq.mts. ( 197 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.47 Sq.mts. ( 210 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.33 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
63 total apartments / 22 apartments booked. 34% apartments booked.
Work Description in Building Gulmohar Avenue Wing ICompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing JAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )58
18 Booked31% Booked
31% Booked
SHOP9.58 Sq.mts. ( 103 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.52 Sq.mts. ( 210 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.05 Sq.mts. ( 216 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.3 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.4 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
63 total apartments / 21 apartments booked. 33% apartments booked.
Work Description in Building Gulmohar Avenue Wing JCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing K

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing KAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
SHOP7.95 Sq.mts. ( 86 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.18 Sq.mts. ( 196 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.14 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.42 Sq.mts. ( 209 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.17 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
64 total apartments / 7 apartments booked. 10% apartments booked.
Work Description in Building Gulmohar Avenue Wing KCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing L

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing LAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )58
12 Booked20% Booked
20% Booked
SHOP8.09 Sq.mts. ( 87 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.5 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.35 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.41 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 12 apartments booked. 19% apartments booked.
Work Description in Building Gulmohar Avenue Wing LCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Shivalik Ventures Private Limited
for Project
Bandra North Gulmohar Avenue
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Shivalik Ventures Private Limited

Shivalik Ventures Private Limited Shivalik Venture Private Limited is a owned by Jade India.