Asmi Legend Project at Goregaon West by Asmi Group (P51800032085)
  • Rating:
  • ()

Asmi Legend - Goregaon West

Project Details, Configuration & Prices
1 BHK356 Sq.ft. Carpet ₹ 95.50 L ++
2 BHK541 Sq.ft. Carpet ₹ 1.45 Cr ++
2 BHK634 Sq.ft. Carpet ₹ 1.89 Cr ++
Project overview
Asmi Legend Project at Goregaon West by Asmi Group (P51800032085) is a Ready Possession Project with 1/2 BHK apartments / Flats starting from N/A onwards

Asmi Legend presents thoughtfully designed 1 and 2 BHK appartment, offering a blend of modern lifestyle and exceptional comfort. These residences are more than just a place to live—they are a cozy retreat equipped with a wide range of essential amenities for everyday convenience. Located in the vibrant Goregaon West area, Asmi Legend ensures easy access to the lively heart of the neighborhood while providing a well-planned living environment. Here, contemporary living seamlessly merges with unmatched convenience, creating the ideal backdrop for a dynamic and fulfilling lifestyle.
Asmi Legend QR Code
Asmi Legend
MahaRERA - P51800032085

Kalpataru Radiance

₹ 3.79 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Ekta Tripolis

₹ 3.86 Crs. onwards
Goregaon West
2½/3 BHK apartments
View Details

DGS Sheetal Kiara

₹ 99 Lacs. onwards
Goregaon West
1/2 BHK apartments
View Details

H. Rishabraj Jakalyan Society

₹ 2.27 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Sanghvi Crystal

₹ 1.25 Crs. onwards
Goregaon West
1/2/3 BHK apartments
View Details

Riviera

₹ 1.08 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

H Rishabhraj Opulence

₹ 1.03 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

37 Avenue

₹ 1.6 Crs. onwards
Goregaon West
2/4 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Asmi Legend
  • Location:
  • Goregaon West, Link Road
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open Reserved;
Developer Details

  • Developer:
    Asmi Group
  • Phone:
    02228729092
  • Website:
    https://asmigroup.co.in/
  • Address:
  • Shop no. 6, Asmi Dreamz, Junction of S. V. Road & M. G. Road, Goregaon West, Mumbai – 400 104.
Project Ratings
Project Brochures
Brochures of Asmi Legendby Asmi Group
Project Brochures
  • MPE/Brochures/30589/Legend Brochure.pdf
Project Amenities
Amenities offred in Asmi Legend
LIFESTYLE AMENITIES
High speed elevatorsGrand entrance lobbyAluminium Sliding WindowsPOP finished wallsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2025
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800032085
RERA Project Name Asmi Legend
RERA Location 1A 171
RERA Developer Angel Construction Company
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 07 Jan 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Goregaon West

Facilities & Amenities
Facilities, Amenities & Common areas details of Asmi Legendlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Work Not Started
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Work Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Work Not Started
Storm Water Drains
Work Not Started
Street Lighting
Work Not Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply
Work Not Started
Buildings / Wings in Asmi Legend
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Asmi Legendby Asmi Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

33121 Sq. ft.

Project Area

6411 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

151 apartments in total
Total
151
Booked
86
Available
65

Saleable Area Statistics (Sq. ft.)

84507 Total
Total
84507
Booked
40386
Available
44121
Total 151 apartments in project. 86 apartments booked. 56% apartments booked.
Total 7850.89 saleable area. 3751.93 apartments booked.
48% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20244100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL24.95 Sq.mts. ( 269 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL81.27 Sq.mts. ( 875 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL242.24 Sq.mts. ( 2607 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL324.95 Sq.mts. ( 3498 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL640.34 Sq.mts. ( 6893 Sq.ft. )1
None Booked0% Booked
0% Booked
5 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress77% done
77% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202420100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.1 Sq.mts. ( 356 Sq.ft. )19
15 Booked78% Booked
78% Booked
1 BHK43.66 Sq.mts. ( 470 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK49.89 Sq.mts. ( 537 Sq.ft. )15
9 Booked60% Booked
60% Booked
2 BHK49.99 Sq.mts. ( 538 Sq.ft. )4
1 Booked25% Booked
25% Booked
2 BHK58.23 Sq.mts. ( 627 Sq.ft. )15
10 Booked66% Booked
66% Booked
2 BHK58.89 Sq.mts. ( 634 Sq.ft. )14
9 Booked64% Booked
64% Booked
68 total apartments / 45 apartments booked. 66% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202421100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.1 Sq.mts. ( 356 Sq.ft. )39
26 Booked66% Booked
66% Booked
1 BHK36.64 Sq.mts. ( 394 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK41.27 Sq.mts. ( 444 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK50.23 Sq.mts. ( 541 Sq.ft. )36
14 Booked38% Booked
38% Booked
78 total apartments / 41 apartments booked. 52% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked
Project Consultants
Channel Partners Registered by Developer
Asmi Group
for Project
Asmi Legend
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer