Annavista Project at Bandra West by Trisons Builders Pvt.Ltd. (P51800034372)
  • Rating: 3.9
  • (9)

Annavista - Bandra West

Project Details, Configuration & Prices
2 BHK775 Sq.ft. Carpet ₹ 5 Cr++
3 BHK1076 Sq.ft. Carpet ₹ 7 Cr++
3 BHK1116 Sq.ft. Carpet ₹ 7 Cr++
Project overview
Annavista Project at Bandra West by Trisons Builders Pvt.Ltd. (P51800034372) a Sold Out Project with 2/3 BHK apartments / Flats starting from ₹ 5 Crs onwards

Annavista is a Residential Project Developed by the Trsions Builders. It is located at Bandra West. The area is well-connected to other parts of Mumbai through the Mumbai Suburban Railway system. Close proximity to the social infrastructure. It is a 7 storey tower offering 2 and 3 BHK Residences. Servant room on every floor. stack car parking system. It has modern amenities like rooftop swimming pool, gym, rainwater harvesting etc.
Annavista QR Code
Annavista
MahaRERA - P51800034372

Shanti Sadan

₹ 7.06 Crs. onwards
Bandra West
3 BHK apartments
View Details

Unique Shanti Finessia

₹ 9.99 Crs. onwards
Bandra West
4 BHK apartments
View Details

Mayfair Muse

₹ 19.99 Crs. onwards
Bandra West
Duplex BHK apartments
View Details

Prestige Daffodils

₹ 27.18 Crs. onwards
Bandra West
4 BHK apartments
View Details

Park Reach

₹ 10.18 Crs. onwards
Bandra West
3 BHK apartments
View Details

Turner House

₹ 12.75 Crs. onwards
Bandra West
Office BHK apartments
View Details

Vaswani Avania

₹ 4.63 Crs. onwards
Bandra West
2/4 BHK apartments
View Details

Mirchandani Goldstone

₹ 10.72 Crs. onwards
Bandra West
3/4/Pent House BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Annavista
  • Location:
  • Bandra West, Plot No 57, CTS 568, Perry Road
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2024
  • Floors:
    7
Developer Details

  • Developer:
    Trisons Builders Pvt.Ltd.
  • Phone:
    +91 22 26408594
  • Website:
    www.trisonsbuilders.com
  • Address:
  • C.T.S. No. F/69, Plot No. 607, 15th Road, Bandra West, Mumbai 400 050.
Project Ratings
Project Brochures
Brochures of Annavistaby Trisons Builders Pvt.Ltd.
Project Brochures
  • MPE/Brochures/28901/Annavista Brochure.pdf
Project Amenities
Amenities offred in Annavista
LIFESTYLE AMENITIES
Power BackupHigh speed elevatorsGrand entrance lobbySwimming PoolGymnasiumIntercom/CCTVPOP finished wallsImported Sanitary FittingsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800034372
RERA Project Name Annavista
RERA Location C/568
RERA Developer Trisons Builders
Architect Pushkar Bhanuprasad Suthar
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 04 Apr 2022
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Bandra West

Facilities & Amenities
Facilities, Amenities & Common areas details of Annavistalast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Adani Noc
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
FITNESS CENTER
As Per Plan
Landscaping & Tree Planting
As Per Approval
LIFTS LIFTLOBBY ENTRANCE LOBBY
As Per Plan
Open Parking
As Per Plan
SECURITY CABIN
As Per The Design
SERVANT TOILET
As Per The Design
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
SOCIETY ROOM
As Per The Design
Solid Waste Management And Disposal
Na
SRAIRCASE
As Per Plan
Storm Water Drains100% completed
95% Complete
As Per Noc
Street Lighting
Na
SWIMMING POOL AND COMMON TARRACE
As Per The Design
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per The Design
Water Supply
By Mcgm
Buildings / Wings in Annavista
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Annavistaby Trisons Builders Pvt.Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

9108 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

27 apartments in total
Total
27
Booked
0
Available
27

Saleable Area Statistics (Sq. ft.)

23215 Total
Total
23215
Booked
0
Available
23215
Total 27 apartments in project. 0 apartments booked. 0% apartments booked.
Total 2156.72 saleable area. 0 apartments booked.
0% area booked.

Annavista

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AnnavistaDec 20248111051
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.88 Sq.mts. ( 375 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK69.74 Sq.mts. ( 751 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK71.84 Sq.mts. ( 773 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK72.02 Sq.mts. ( 775 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK99.96 Sq.mts. ( 1076 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK103.64 Sq.mts. ( 1116 Sq.ft. )4
None Booked0% Booked
0% Booked
27 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building AnnavistaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Trisons Builders Pvt.Ltd.
for Project
Annavista
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Trisons Builders Pvt.Ltd.