ALPINE PRIMO Project at Andheri West by Alpine Infrastructure (P51800030851)
  • Rating:
  • ()

ALPINE PRIMO - Andheri West

Alpine Infrastructure
Project Details, Configuration & Prices
1 BHK423 Sq.ft. Carpet ₹ 1.40 Cr ++
2 BHK597 Sq.ft. Carpet ₹ 1.91 Cr ++
2 BHK635 Sq.ft. Carpet ₹ 2.03 Cr ++
2 BHK780 Sq.ft. Carpet ₹ 2.49 Cr ++
3 BHK949 Sq.ft. Carpet ₹ 3.03 Cr ++
3 BHK1050 Sq.ft. Carpet ₹ 3.36 Cr ++
Project overview
ALPINE PRIMO Project at Andheri West by Alpine Infrastructure (P51800030851) is a Ready Possession Project with 1/2/3 BHK apartments / Flats starting from ₹ 1.35 Crs onwards

Alpine Primo is a Residential Project by Alpine Infrastructure. It is located at Andheri West. The location provides great connectivity through Western Express Highway. It is well-served by public transportation, including local trains, buses, and auto-rickshaws. The Andheri railway station is a major transportation hub connecting both the Western and Harbour lines of Mumbai's suburban railway network. Close proximity to the social infrastructure. It is a 14 storey tower. The Project offers 1, 2 & 3 BHK Spacious Homes with ACs in all Bedrooms and Living Room. Also has commercial units. All modern amenities and facilities.
ALPINE PRIMO QR Code
ALPINE PRIMO
MahaRERA - P51800030851

Transcon Triumph - Tower 4

₹ 2.97 Crs. onwards
Andheri West
2/3 BHK apartments
View Details

Adani Linkbay Residences

₹ 3.25 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details

Bharat Altavistas

₹ 5.77 Crs. onwards
Andheri West
3/6 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 3 Crs. onwards
Andheri West
Office BHK apartments
View Details

DLF WestPark

₹ 4.2 Crs. onwards
Andheri West
3 BHK apartments
View Details
Andheri West
3/4 BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    ALPINE PRIMO
  • Location:
  • Andheri West, J.P.Road Opp.Navrang Cinema
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open Reserved
  • Floors:
    14
Developer Details

Alpine Infrastructure

  • Developer:
    Alpine Infrastructure
  • Phone:
  • Website:
    www.alpineinfraheights.com
  • Address:
  • Opp. Navrang Cinema, JP Road, Andheri West
Project Ratings
Project Brochures
Brochures of ALPINE PRIMOby Alpine Infrastructure
Project Brochures
  • MPE/Brochures/28354/New Residential Brochure 1.pdf
Project Amenities
Amenities offred in ALPINE PRIMO
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2025
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800030851
RERA Project Name Alpine Primo
RERA Location Cts No. 136A
RERA Developer Alpine Infraheights Llp
Project RERA Details
Project Type Others
Funding Bank KOTAK MAHINDRA BANK LIMITED
Last Modified 03 Jul 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of ALPINE PRIMOlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Receiving Stations
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Tree Planting As Per Sg Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Provided
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting As Per Norms
Water Supply
As Per Mcgm Norms
Buildings / Wings in ALPINE PRIMO
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of ALPINE PRIMOby Alpine Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

39015 Sq. ft.

Project Area

7347 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

126 apartments in total
Total
126
Booked
34
Available
92

Saleable Area Statistics (Sq. ft.)

76529 Total
Total
76529
Booked
18753
Available
57776
Total 126 apartments in project. 34 apartments booked. 26% apartments booked.
Total 7109.7 saleable area. 1742.2 apartments booked.
25% area booked.

Alpine Primo - C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Alpine Primo - C WingDec 2024151012020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.22 Sq.mts. ( 422 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK39.5 Sq.mts. ( 425 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK59.01 Sq.mts. ( 635 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK60.04 Sq.mts. ( 646 Sq.ft. )8
2 BHK63.01 Sq.mts. ( 678 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK63.57 Sq.mts. ( 684 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.26 Sq.mts. ( 713 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK72.49 Sq.mts. ( 780 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK88.1 Sq.mts. ( 948 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK97.58 Sq.mts. ( 1050 Sq.ft. )2
None Booked0% Booked
0% Booked
31 total apartments / 11 apartments booked. 35% apartments booked.
Work Description in Building Alpine Primo - C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress31% done
31% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked

Alpine Primo -A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Alpine Primo -A WingDec 2024141012062
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.13 Sq.mts. ( 421 Sq.ft. )9
6 Booked66% Booked
66% Booked
1 BHK39.31 Sq.mts. ( 423 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK55.48 Sq.mts. ( 597 Sq.ft. )9
2 BHK58.74 Sq.mts. ( 632 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK59.39 Sq.mts. ( 639 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK52.42 Sq.mts. ( 564 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.62 Sq.mts. ( 577 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK88.2 Sq.mts. ( 949 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK70.72 Sq.mts. ( 761 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK72.77 Sq.mts. ( 783 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK100.46 Sq.mts. ( 1081 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space106.69 Sq.mts. ( 1148 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space108.55 Sq.mts. ( 1168 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space87.36 Sq.mts. ( 940 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space95.35 Sq.mts. ( 1026 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space97.4 Sq.mts. ( 1048 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space54.83 Sq.mts. ( 590 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space40.43 Sq.mts. ( 435 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.84 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space44.14 Sq.mts. ( 475 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space44.52 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space46.1 Sq.mts. ( 496 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space49.44 Sq.mts. ( 532 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space51.48 Sq.mts. ( 554 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space51.58 Sq.mts. ( 555 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space52.23 Sq.mts. ( 562 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space52.32 Sq.mts. ( 563 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space26.95 Sq.mts. ( 290 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space30.95 Sq.mts. ( 333 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space34.29 Sq.mts. ( 369 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space38.57 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space38.58 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.23 Sq.mts. ( 293 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop7 Sq.mts. ( 75 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21 Sq.mts. ( 226 Sq.ft. )1
1 Booked100% Booked
100% Booked
57 total apartments / 17 apartments booked. 29% apartments booked.
Work Description in Building Alpine Primo -A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress31% done
31% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked

Alpine Primo -B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Alpine Primo -B WingDec 2024141012017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.13 Sq.mts. ( 604 Sq.ft. )15
3 Booked20% Booked
20% Booked
2 BHK56.32 Sq.mts. ( 606 Sq.ft. )14
2 BHK58.83 Sq.mts. ( 633 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK59.01 Sq.mts. ( 635 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK65.06 Sq.mts. ( 700 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK65.33 Sq.mts. ( 703 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK101.02 Sq.mts. ( 1087 Sq.ft. )1
1 Booked100% Booked
100% Booked
38 total apartments / 6 apartments booked. 15% apartments booked.
Work Description in Building Alpine Primo -B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress31% done
31% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked
Project Consultants
Channel Partners Registered by Developer
Alpine Infrastructure
for Project
Alpine Primo
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Alpine Infrastructure

Alpine Infrastructure