Ajmera Boulevard Project at Malad West by Ajmera Cityscapes (P51800054569)
  • Rating:
  • ()

Ajmera Boulevard - Malad West

Ajmera Cityscapes
Project Details, Configuration & Prices
Project overview
Ajmera Boulevard Project at Malad West by Ajmera Cityscapes (P51800054569) is a RERA approved Under Construction Project with RERA ID P51800054569 slated to be ready for possession by Dec 2026 with 1/2 BHK apartments / Flats starting from N/A onwards

Ajmera Boulevard QR Code
Ajmera Boulevard
MahaRERA - P51800054569

9 Business Bay

₹ 1.41 Crs. onwards
Malad West
Office BHK apartments
View Details

Auris Clara

₹ 1.79 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Raheja Exotica Siena

₹ 85 Lacs. onwards
Malad West
1 BHK apartments
View Details

Arkade Eden

₹ 2.24 Crs. onwards
Malad West
2/3/4 BHK apartments
View Details

Polo Matrix Jaydeep

₹ 1.25 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Auris Ilaria

₹ 1.08 Crs. onwards
Malad West
1/2/3 BHK apartments
View Details

Sheth Irene

₹ 1.1 Crs. onwards
Malad West
1/2 BHK apartments
View Details

Raheja Exotica Verona

₹ 3.4 Crs. onwards
Malad West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Jan 2026
  • Project:
    Ajmera Boulevard
  • Location:
  • Malad West, Ajmera BoulevoOpposite Silver Oaks Banquets, Kanchpada, Behind Auris Serenity ,
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Parking:
    Podium;
  • Floors:
    23
Developer Details

Ajmera Cityscapes

  • Developer:
    Ajmera Cityscapes
  • Phone:
    022 40628888
  • Website:
    www.ajmeracityscapes.co.in
  • Address:
  • 63/67, Ajmera House, Pathakwadi, L.T. Marg, K.H. Ajmera Chowk, Marine Lines,
Project Ratings
Project Amenities
Amenities offred in Ajmera Boulevard
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800054569
RERA Project Name Ajmera Boulevard
RERA Location 334/A/1 To 3, 360, 361/A &B, 362/A &B And 577
RERA Developer Ajmera Boulevard Private Limited
Architect Tarun H Motta
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 29 Jul 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad West

Facilities & Amenities
Facilities, Amenities & Common areas details of Ajmera Boulevardlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Mcgm Remarks
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
As Per Electric Remarks
Energy management
As Per Remarks
Fire Protection And Fire Safety Requirements95% completed
95% Complete
As Per Cfo Remarks
Landscaping & Tree Planting
As Per Requirement
Open Parking
As Per Remarks
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Sewerage Remarks
Solid Waste Management And Disposal100% completed
95% Complete
As Per Mcgm Remarks
Storm Water Drains90% completed
90% Complete
As Per Mcgm Remarks
Street Lighting50% completed
50% Complete
As Per Requirement
Swimming Pool100% completed
95% Complete
As Per Mcgm Remarks
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
As Per Requirement
Water Conservation, Rain water Harvesting
As Per Rwh Remarks
Water Supply90% completed
90% Complete
As Per He Noc
Buildings / Wings in Ajmera Boulevard
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ajmera Boulevardby Ajmera Cityscapeslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

194311 Sq. ft.

Project Area

33323 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

190 apartments in total
Total
190
Booked
9
Available
181

Saleable Area Statistics (Sq. ft.)

100786 Total
Total
100786
Booked
6210
Available
94576
Total 190 apartments in project. 9 apartments booked. 4% apartments booked.
Total 9363.26 saleable area. 576.9 apartments booked.
6% area booked.

AJMERA BOULEVARD - A WING

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AJMERA BOULEVARD - A WING
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building AJMERA BOULEVARD - A WINGCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Ajmera Boulevard - C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ajmera Boulevard - C WingDec 2026221010095
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.06 Sq.mts. ( 485 Sq.ft. )41
None Booked0% Booked
0% Booked
41 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ajmera Boulevard - C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Ajmera Boulevard - D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ajmera Boulevard - D WingDec 2026221010195
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.06 Sq.mts. ( 485 Sq.ft. )22
None Booked0% Booked
0% Booked
2 BHK64.1 Sq.mts. ( 690 Sq.ft. )41
9 Booked21% Booked
21% Booked
2 BHK65.43 Sq.mts. ( 704 Sq.ft. )1
None Booked0% Booked
0% Booked
64 total apartments / 9 apartments booked. 14% apartments booked.
Work Description in Building Ajmera Boulevard - D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Ajmera Boulevard -B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ajmera Boulevard -B WingDec 2026221110184
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.07 Sq.mts. ( 485 Sq.ft. )43
None Booked0% Booked
0% Booked
43 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ajmera Boulevard -B WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Ajmera Boulevard B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ajmera Boulevard B WingDec 2026221110184
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.07 Sq.mts. ( 485 Sq.ft. )42
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ajmera Boulevard B WingCompletion
Project Consultants
Channel Partners Registered by Developer
Ajmera Cityscapes
for Project
Ajmera Boulevard
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ajmera Cityscapes

Ajmera Cityscapes Established by Chairman Emeritus Shri Kishore Ajmera in the late 1950s the Ajmera Group is diversified into Real Estate, Hospitality, Financial Services and International Trade in the Pharmaceutical Sector.. The group is driven by the Chairman Emeritus’ legacy value system that demands intense customer focus. Ajmera Cityscapes’ first foray into the world of real estate was a small step with a single building at Casa Blanca at Oshiwara, Andheri which apred across 30,000 sqft FSI. In the two decades since, we have gone from strength to strength, somewhere along the way picking up a reputation for quality of design and construction as well as superlative value for money. At the present as many as 15 Ajmera Cityscapes’ constructions proudly stand tall in eloquent testimony to the investment or thought, care, impeccable workmanship and best in class construction leading to truly Fuller Living. To deliver the enrichment of ‘Fuller Living’ to the lives of each individual who chooses his or her life space in an Ajmera Cityscapes development.