AIKYAM Project at Kharghar by Today Royal Group (P52000048020)
  • Rating:
  • ()

AIKYAM - Kharghar

Today Royal Group
Project Details, Configuration & Prices
1 BHK363 Sq.ft. Carpet ₹ 37.99 L ++
2 BHK467 Sq.ft. Carpet ₹ 49.99 L ++
Project overview
AIKYAM Project at Kharghar by Today Royal Group (P52000048020) is a RERA approved Under Construction Project with RERA ID P52000048020 slated to be ready for possession by Oct 2027 with 1/2 BHK apartments / Flats starting from N/A onwards

AIKYAM, located at Rohinjan in Upper Kharghar, is a thoughtfully envisioned residential development that celebrates the harmony between nature, inner well-being, and modern urban living. True to its name, Aikyam represents inner beauty and unity, inviting residents to experience a lifestyle enriched by lush green surroundings, serene views, and a location that offers seamless connectivity to the city while remaining deeply connected to nature. Developed as the flagship project of Today Royal Group, Aikyam is a green integrated township spread across 3 acres. The project features a distinctive parallelogrammatic architectural layout and comprises 519 well-planned studio apartments along with 1 BHK and 2 BHK homes. Each residence is designed to offer comfort, functionality, and a sense of calm, complemented by modern lifestyle amenities that ensure your home truly becomes a world in itself. The township is surrounded by open spaces, landscaped gardens, and greenery enhanced by the nearby Auda Garden, creating a peaceful and refreshing living environment. The combination of expansive open areas, thoughtful landscaping, and contemporary amenities makes daily life at Aikyam immersive, balanced, and deeply satisfying—where nature and modern living coexist effortlessly. Homes at Aikyam are finished with high-quality specifications that reflect durability and refined aesthetics. All rooms feature 2’x2’ vitrified flooring, while kitchens are equipped with granite platforms, branded stainless steel sinks, and ceramic tile dado above the platform. Anodized aluminium sliding windows with glass are provided in living rooms, bedrooms, and kitchens, complemented by marble and black granite window sills that add to the premium feel. Internal walls are finished with acrylic paint, while the external façade is treated with a textured finish for enhanced weather protection. Main and bedroom doors come with decorative laminate finishes and premium hardware, while bathroom and WC doors are fitted with durable granite and marble frames. Bathrooms include concealed plumbing, good-quality fittings, and glazed tiles up to 7 feet in height for a clean and elegant finish. The electrical setup includes concealed copper wiring with branded MCBs, modular switches, and power backup for common areas and lifts. Adequate underground and overhead water tanks ensure reliable water supply, and the terrace is treated with special waterproofing for long-term protection and peace of mind. Registered under MahaRERA with Registration Number P52000048020, Aikyam offers transparency, trust, and a lifestyle that blends greenery, thoughtful design, and urban convenience. Living at Aikyam is truly about being amidst nature while discovering a deeper connection with yourself.
AIKYAM QR Code
AIKYAM
MahaRERA - P52000048020

Sai World Empire

₹ 1.07 Crs. onwards
Kharghar
2/3/4 BHK apartments
View Details

Arihant Clan Aalishan - Phase 1

₹ 75.43 Lacs. onwards
Kharghar
1 RK/2/3 BHK apartments
View Details

Trishul Symphony

₹ 1.5 Crs. onwards
Kharghar
2/3 BHK apartments
View Details

Arihant Clan Aalishan - Phase 2

₹ 1.06 Crs. onwards
Kharghar
2/3 BHK apartments
View Details

SM Acumen

₹ 1.45 Crs. onwards
Kharghar
2/3 BHK apartments
View Details

Tricity Aspire

₹ 99.5 Lacs. onwards
Kharghar
2/3 BHK apartments
View Details
Kharghar
2/2½/3 BHK apartments
View Details
Kharghar
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    AIKYAM
  • Location:
  • Kharghar, Rohinjan, Upper
  • Const. Stage:
    Under Construction
  • Possession:
    Oct 2027
  • Parking:
    Podium;
Developer Details

Today Royal Group

  • Developer:
    Today Royal Group
  • Phone:
    022 27579898
  • Website:
    www.todayroyal.com
  • Address:
  • Office No. 201, Plot No. 17, Mayuresh Square, Sec No.15, CBD Belapur, Navi Mumbai - 400614.
Project Ratings
Project Amenities
Amenities offred in AIKYAM
LIFESTYLE AMENITIES
Indoor GamesKid's play areaJogging TrackGymnasiumClub HouseConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Oct 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P52000048020
RERA Project Name Aikyam
RERA Location Survey No 25/1 Rohinjan
RERA Developer Today Royal Infracon
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 07 Oct 2024
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Kharghar

Facilities & Amenities
Facilities, Amenities & Common areas details of AIKYAMlast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Commenced. Will Be Provided As Per Udcpr
Community Buildings
Not Commenced. Will Be Provided As Per Udcpr
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided As Per Udcpr Or Mseb Requirement
Energy management
Will Be Provided As Per Udcpr And Moef Noc
Fire Protection And Fire Safety Requirements
Not Commenced. Will Be Provided As Per Cfo Noc
Landscaping & Tree Planting
Not Commenced. Will Be Provided As Per Udcpr
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Commenced. Will Be Provided As Per Udcpr
Solid Waste Management And Disposal
Not Commenced. Will Be Provided As Per Udcpr
Storm Water Drains
Not Commenced. Will Be Provided As Per Udcpr
Street Lighting
Not Commenced. Will Be Provided As Per Udcpr
Treatment And Disposal Of Sewage And Sullage Water
Will Be Provided As Per Udcpr And Moef Noc
Water Conservation, Rain water Harvesting
Not Commenced. Will Be Provided As Per Udcpr
Water Supply
Not Commenced. Will Be Provided As Per Udcpr
Buildings / Wings in AIKYAM
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of AIKYAMby Today Royal Grouplast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

134119 Sq. ft.

Project Area

13412 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

343 apartments in total
Total
343
Booked
144
Available
199

Saleable Area Statistics (Sq. ft.)

168221 Total
Total
168221
Booked
68253
Available
99969
Total 343 apartments in project. 144 apartments booked. 41% apartments booked.
Total 15628.15 saleable area. 6340.84 apartments booked.
41% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingOct 20271410121628
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )37
27 Booked72% Booked
72% Booked
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )9
5 Booked55% Booked
55% Booked
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )33
12 Booked36% Booked
36% Booked
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )9
4 Booked44% Booked
44% Booked
88 total apartments / 48 apartments booked. 54% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingOct 20271410121528
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.79 Sq.mts. ( 396 Sq.ft. )19
6 Booked31% Booked
31% Booked
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )9
2 Booked22% Booked
22% Booked
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )17
10 Booked58% Booked
58% Booked
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )8
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )10
3 Booked30% Booked
30% Booked
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )17
14 Booked82% Booked
82% Booked
80 total apartments / 36 apartments booked. 45% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingOct 20271410121637
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )27
15 Booked55% Booked
55% Booked
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )44
28 Booked63% Booked
63% Booked
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )26
6 Booked23% Booked
23% Booked
97 total apartments / 49 apartments booked. 50% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingOct 20271410121631
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )16
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )62
78 total apartments / 11 apartments booked. 14% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress66% done
66% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Today Royal Group
for Project
Aikyam
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Today Royal Group

Today Royal Group The year 2014 marks the completion of 25 years of Today Royal Group's steadfast commitment to excellence. What began as a small enterprise in two decades ago, is now an extraordinaire - a force to reckon with. Since inception, we have strived for benchmark quality, customer centric approach, robust engineering, in-house research, uncompromising business ethics, timeless values and transparency in all spheres of business conduct, making Today Royal Group a most preferred brand. We are acutely conscious of the fact that due to rapid urbanization, there are huge challenges and as responsible player we shall continue to provide intelligent solutions in a manner which is sustainable. We rely on our people, their capacities to innovate and use of technology to create immense value for all our stakeholders. We will continue to raise the bar and set new standards in the industry we deal in to strengthen this goal of ours.