Aaradhya High Park Project at Dahisar East by MICL (P51700017865)
  • Rating: 4.9
  • (1496)

Aaradhya High Park - Dahisar East

MICL
Project Details, Configuration & Prices
1 BHK495 Sq.ft. Carpet ₹ 68.99 Lakhs
1 BHK507 Sq.ft. Carpet ₹ 68.99 Lakhs
1 BHK517 Sq.ft. Carpet ₹ 68.99 Lakhs
2 BHK630 Sq.ft. Carpet ₹ 85.99 Lakhs
2 BHK760 Sq.ft. Carpet ₹ 1.19 Cr
3 BHK793 Sq.ft. Carpet ₹ 1.29 Cr
3 BHK961 Sq.ft. Carpet ₹ 1.49 Cr
Project overview

Aaradhya High Park Project at Dahisar East by MICL (P51700017865) is a RERA approved Under Construction Project with REAR IDP51700017865 slated to be ready for possession by Mar 2024 with 1/2/3 BHK apartments / Flats starting from 7672500 onwards.

MICL Aaradhya Highpark most awaited biggest and best township project on western express highway, next to Dahisar check naka. Aaradhya highpark is well connected to urban life and surrounded by nature. Very well connected to business hubs like Andheri / BKC & Thane. High class views of nature Sanjay Gandhi national park it gives you most scenic atmosphere at MICL Aaradhya High Park, every apartment has obstructive views of city and well as nature. 50+ Premium Amenities with tallest towers on western express highway.

Aaradhya highpark crafted by legends to ensure that you get best of everything, Configurations of 1BHK / 1.5BHK / 2BHK & 3BHK, one of the largest and most luxurious recreational spaces in the vicinity at MICK Aaradhya Highpark, biggest swimming pools with cinema screen. All this comes with MICL Guarentee of delivering projects before time.

Aaradhya High Park is a 30 storeys Under Construction Project and the location is After Check Naka, Next to Thakur Mall, opp.Lodha Aqua, Dahisar East and is developed by MICL.

Highlights of Aaradhya High Park:

  • Aaradhya High Park was launched in Oct 2018 and the possession of the same is likely to be in Feb 2022. 
  • Spread in 17 acres approximately of land parcel divided into 3 Phases.
  • The first phase will have 6 Towers and each Tower will have around 30 floors.
  • There will be around 650 flats in the complex and there will be 5 to 8 flats per floor depending on the tower.
  • The Possession of Aaradhya High Park - Phase 1 is likely to be in 2022/2023 approximately,  where as the phase 2 and 3 will be a little later.
  • Buildings will have two levels of Basement, 1 Ground and 1 Podium parking
  • The price for Aaradhya High Park, Dahisar will be in bands from 1 to 10 Level, 11 to 20 Level and 21 to 30 Level.

Aaradhya High Park is RERA approved has the Registration Number bearing P51700017865.

MICL also has other under construction and ready possession and sold out projects like Aaradhya Signature, Aaradhya One, Aaradhya Nalanda, Aaradhya Residency, Aaradhya Saphalya, Aaradhya Tower, Aaradhya High Park.

MICL currently has 3 Ready Possession, 1 Under Construction projects.

The property prices in Dahisar East are in the range of 9000 to 12000 for Outright for ready and under construction projects.

Aaradhya High Park has good reviews and the ratings of this project are approximately 5 out of 5.

You can download the brochure and see vieo of Aaradhya High Park and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website. The Bookings for the Under Construction project Aaradhya High Park are open and we can set up a Site Visit any time at your Convenience.  

NL Himalaya

₹ 1.1 Crs. onwards
Dahisar East
2/3 BHK apartments
View Details

Sheth Midori

₹ 91.5 Lacs. onwards
Dahisar East
1/2 BHK apartments
View Details

Chandak Nishchay

₹ 71 Lacs. onwards
Dahisar East
1/2 BHK apartments
View Details
Dahisar East
1/1 RK/2 BHK apartments
View Details

Sheth Midori

₹ 88.4 Lacs. onwards
Dahisar East
1/2 BHK apartments
View Details

Aryavarta

₹ 1.32 Crs. onwards
Dahisar East
2/3 BHK apartments
View Details

Crescent Sky Heights

₹ 50.08 Lacs. onwards
Dahisar East
1/1 RK/2 BHK apartments
View Details

Northern Heights

₹ 1.08 Crs. onwards
Dahisar East
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Jun 2021
  • Project:
    Aaradhya High Park
  • Location:
  • Dahisar East, After Check Naka, Next to Thakur Mall, opp.Lodha Aqua
  • Const. Stage:
    Under Construction
  • Possession:
    Mar 2024
  • Parking:
    Stilt;Basement;
  • Floor:
    30
Developer Details

MICL

  • Developer:
    MICL
  • Phone:
    022 42463999
  • Website:
    https://www.miclgroup.in/
  • Address:
  • Man Infraconstruction Ltd. 12th Floor, Krushal Commercial Complex, Above Shoppers Stop, G M Road, Chembur (West), Mumbai 400 089, India
Project Ratings
Project Brochures
Brochures of Aaradhya High Parkby MICL
Project Brochures
  • 24930 Aaradhya High Park Brochure.pdf
  • 24930 Aaradhya High Park Unit Floor Plans.pdf
Project Amenities
Amenities offred in Aaradhya High Park
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesAir Conditioned LobbyBusiness CentreRecreationBalconyLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumHealth ClubIntercom/CCTVAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringVitrified flooringDry AreasKitchen CabinetsGranite PlatformSecurity Help DeskReception DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New Project
Proposed Possession 30 Sep 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA REARA No: P51700017865
RERA Project Name Aaradhya Highpark - Project 1 Of Phase I
RERA Location Western Express Highway, Near Singapore International School, Mira-Bhayandar, Thane, 401107
RERA Developer Man Vastucon Llp
Project RERA Details
Project Type Others
Funding Bank ICICI BANK LIMITED
Last Modified 16 Oct 2020
Last Retrived 21 Oct 2020
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya High Parklast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
-
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Aaradhya High Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya High Parkby MICLlast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer

51842 Sq. ft.

Project Area

16953 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

670 apartments in total
Total
670
Booked
612
Available
58

Saleable Area Statistics (Sq. ft.)

323335 Total
Total
323335
Booked
288879
Available
34456
Total 670 apartments in project. 612 apartments booked. 91% apartments booked.
Total 30038.51 saleable area. 26837.5 apartments booked.
89% area booked.

Shopline

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShoplineMar 20242120000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP18.65 Sq.mts. ( 201 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP24.3 Sq.mts. ( 262 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP26.9 Sq.mts. ( 290 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP27.17 Sq.mts. ( 292 Sq.ft. )10
10 Booked100% Booked
100% Booked
SHOP34.17 Sq.mts. ( 368 Sq.ft. )16
16 Booked100% Booked
100% Booked
SHOP34.66 Sq.mts. ( 373 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP35.88 Sq.mts. ( 386 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP36.93 Sq.mts. ( 398 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP Gr. plus 162.56 Sq.mts. ( 673 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP Gr. plus 165.69 Sq.mts. ( 707 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP Gr. plus 167.87 Sq.mts. ( 731 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP Gr. plus 167.97 Sq.mts. ( 732 Sq.ft. )1
1 Booked100% Booked
100% Booked
40 total apartments / 39 apartments booked. 97% apartments booked.
Work Description in Building ShoplineCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress30% done
30% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress30% done
30% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AMar 20243112120161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )24
23 Booked95% Booked
95% Booked
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )84
82 Booked97% Booked
97% Booked
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )84
82 Booked97% Booked
97% Booked
2 BHK47.38 Sq.mts. ( 510 Sq.ft. )24
23 Booked95% Booked
95% Booked
3 BHK62.31 Sq.mts. ( 671 Sq.ft. )6
3 Booked50% Booked
50% Booked
3 BHK62.74 Sq.mts. ( 675 Sq.ft. )6
4 Booked66% Booked
66% Booked
228 total apartments / 217 apartments booked. 95% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress23% done
23% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 20243112120146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )84
73 Booked86% Booked
86% Booked
1 BHK36.09 Sq.mts. ( 388 Sq.ft. )24
23 Booked95% Booked
95% Booked
1 BHK37.05 Sq.mts. ( 399 Sq.ft. )24
21 Booked87% Booked
87% Booked
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )84
84 Booked100% Booked
100% Booked
2 BHK52.02 Sq.mts. ( 560 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK62.74 Sq.mts. ( 675 Sq.ft. )6
4 Booked66% Booked
66% Booked
228 total apartments / 211 apartments booked. 92% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress23% done
23% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CMar 20243112120138
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.89 Sq.mts. ( 408 Sq.ft. )60
55 Booked91% Booked
91% Booked
2 BHK53.31 Sq.mts. ( 574 Sq.ft. )24
24 Booked100% Booked
100% Booked
2 BHK53.4 Sq.mts. ( 575 Sq.ft. )30
30 Booked100% Booked
100% Booked
3 BHK72.67 Sq.mts. ( 782 Sq.ft. )60
36 Booked60% Booked
60% Booked
174 total apartments / 145 apartments booked. 83% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress23% done
23% Booked
Project Consultants
Channel Partners Registered by Developer
MICL
for Project
Aaradhya Highpark - Project 1 Of Phase I
last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About MICL

MICL Man Infraconstruction is a leading construction company in India that has executed construction work for some of the most significant port projects in the country. We continue to alter the structural landscape through several other prestigious projects in the residential, commercial, Institutional and industrial space as well. Our commitment to excellence in quality was personified through India's first premier private port project for Nhava Sheva International Container Terminal at Jawaharlal Nehru Port Terminal, Navi Mumbai in 1997. Subsequently, we have successfully worked on five ports viz., Jawaharlal Nehru Port Trust, Mundra Port, Chennai Port, Vallarpadam Port and the Pipavav Port. Man Infra has successfully executed construction of high rise building with 3 Residential Towers of 55 storey which is one of the tallest towers’ in western suburb of Mumbai. We have relentlessly explored and seized construction opportunities across various business verticals. As a natural extension and in line with the aspiration to climb up the value chain, Man Infra (The Group) has entered into Real Estate Development. The Group is currently developing premium Residential Projects with an approximate saleable area of 5 million sq. ft. in various suburbs of Mumbai. We aspire to be one of the top builders in Mumbai.