Aabiel Avenue Project at Malad West by (P51800005950) a Sold Out Project with 1 BHK apartments / Flats starting from ₹ 80.54 Lakh onwards

Aabiel Avenue is a 18 storied Under Construction Project and the location is Ramchandra Lane Extn, Near Spectra Motors, Off Link Road, Malad West and is developed by Right Channel Construction Builder and Developers.

Aabiel Avenue was launched in Oct 2016 and the possession of the same is likely to be in Dec 2019.

Aabiel Avenue is RERA approved has the Registration Number bearing P51800005950.

Aabiel Avenue is tagged as Investors Delight / Self Use / RERA Approved.

Amenities like CCTV systems in common areas, modern elevators, intercom connection, vitrified tiles to the whole flat, main door in wood frame, water proof flush door, fitness center, instant geyzer in each bathroom and much more are planned to be provided in Aabiel Avenue.

Right Channel Construction Builder and Developers also has other under construction and ready possession and sold out projects like Kailash Ram Kripa, Amesh, Sakhi Apartment, Grishma Heights, Vrindavan, Tower 28, Da Zephyrus, Aabeil Avenue.

The property prices in Malad West are in the range of 13500 to 18500 for Outright for ready and under construction projects.

Right Channel Construction Builder and Developers currently has 4 Under Construction projects. Aabiel Avenue has good reviews and the ratings of this project are approximately 3 out of 5.

You can download the brochure of Aabiel Avenue and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website. The Bookings for the Under Construction project Aabeil Avenue are open and we can set up a Site Visit any time at your Convenience. Aabeil Avenue is approved by most of the Banks and for more details on the approved bank list, please connect with us.

Aabiel Avenue QR Code
Aabiel Avenue
MahaRERA - P51800005950

Marina Enclave

₹ 1.41 Crs. onwards
Malad West
2/3 BHK apartments
View Details

9 Business Bay

₹ 1.41 Crs. onwards
Malad West
Office BHK apartments
View Details

Auris Clara

₹ 1.79 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Raheja Exotica Siena

₹ 85 Lacs. onwards
Malad West
1 BHK apartments
View Details

Arkade Eden

₹ 2.24 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Auris Ilaria

₹ 1.08 Crs. onwards
Malad West
1/2/3 BHK apartments
View Details

Sheth Irene

₹ 1.1 Crs. onwards
Malad West
1/2 BHK apartments
View Details

Raheja Exotica Verona

₹ 3.4 Crs. onwards
Malad West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Aabiel Avenue
  • Location:
  • Malad West, Ramchandra Lane Extn, Near Spectra Motors, Off Link Road
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2019
  • Floors:
    18
Developer Details

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Amenities
Amenities offred in Aabiel Avenue
LIFESTYLE AMENITIES
High speed elevatorsKid's play areaIndoor GamesPower BackupVitrified flooringPOP finished wallsGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2022
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800005950
RERA Project Name Aabiel Avenue
RERA Location 341/A-1, 341A-2, 341/A
RERA Developer Right Channel Construction Pvt Ltd
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 08 Sep 2021
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad West

Facilities & Amenities
Facilities, Amenities & Common areas details of Aabiel Avenuelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply100% completed
95% Complete
As Per Approved Plan
Buildings / Wings in Aabiel Avenue
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aabiel Avenueby last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

13356 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
59
Available
3

Saleable Area Statistics (Sq. ft.)

25349 Total
Total
25349
Booked
23132
Available
2218
Total 62 apartments in project. 59 apartments booked. 95% apartments booked.
Total 2355 saleable area. 2148.97 apartments booked.
91% area booked.

Aabiel Avenue

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Aabiel AvenueDec 2019191010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A Wing 1 BHK38.45 Sq.mts. ( 414 Sq.ft. )16
15 Booked93% Booked
93% Booked
A Wing 1 BHK40.28 Sq.mts. ( 434 Sq.ft. )29
29 Booked100% Booked
100% Booked
A Wing Comm.83.79 Sq.mts. ( 902 Sq.ft. )2
None Booked0% Booked
0% Booked
B Wing 1 BHK26.94 Sq.mts. ( 290 Sq.ft. )15
15 Booked100% Booked
100% Booked
62 total apartments / 59 apartments booked. 95% apartments booked.
Work Description in Building Aabiel AvenueCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress95% done
95% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Aabiel Avenue
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About