24 Karat Project at Jogeshwari by Unimont Realty (P51800050840)
  • Rating:
  • ()

24 Karat - Jogeshwari

Project Details, Configuration & Prices
2 BHK683 Sq.ft. Carpet ₹ 1.75 Cr ++
Project overview
24 Karat Project at Jogeshwari by Unimont Realty (P51800050840) is a RERA approved Under Construction Project with RERA ID P51800050840 slated to be ready for possession by Mar 2029 with 2 BHK apartments / Flats starting from ₹ 1.74 Crs onwards

24 KARAT RESIDENCES - JOGESHWARI WEST Introducing 24 Karat Residences, a cutting-edge residential project located on SV Road in Jogeshwari West. This distinctive development stands as a symbol of success, offering elevated living spaces that dominate the skyline. Situated in the vibrant heart of Mumbai, 24 Karat Residences ensures seamless connectivity through an extensive network of roads, trains, and metro lines, providing effortless access to every corner of the city. CONNECTIVITY - Airport: A swift 20-minute drive ensures efficient travel to and from the airport. - New Link Road: A convenient 5-minute drive connects you swiftly to the city's extensive road network. - S. V. Road: Immediate access at 0 minutes' drive, placing convenience at your doorstep. - WEH (Western Express Highway): A brief 5-minute drive seamlessly links you to this vital arterial route. - Jogeshwari Station: A mere 5-minute walk to the nearby train station enhances your commuting convenience. - Mrinaltai Gore Flyover: A quick 2-minute drive provides elevated access to key locations. - Western Express: A swift 5-minute drive ensures smooth connectivity along this major expressway. - Jogeshwari Metro Station: A mere 2-minute walk grants direct access to the metro network, expanding your travel options. 24 Karat Residences is more than just a home; it represents a strategic address that seamlessly blends convenience, accessibility, and contemporary living. Experience the pinnacle of urban living at Jogeshwari West's latest landmark.
24 Karat QR Code
24 Karat
MahaRERA - P51800050840

Lodha Belair

₹ 1.87 Crs. onwards
Jogeshwari
2/3 BHK apartments
View Details

Roswalt Zaiden

₹ 1.18 Crs. onwards
Jogeshwari
1/2/4 BHK apartments
View Details

Sanghvi Sapphire

₹ 1.49 Crs. onwards
Jogeshwari
2 BHK apartments
View Details

Dream India Jogeshwari

₹ 91.63 Lacs. onwards
Jogeshwari
1/2/3 BHK apartments
View Details

Sigma Jade

₹ 1 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Aim Gardens

₹ 1.09 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Codename Connexted

₹ 1.09 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Aim Paradise

₹ 1 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    24 Karat
  • Location:
  • Jogeshwari, SV Road
  • Const. Stage:
    Under Construction
  • Possession:
    Mar 2029
  • Parking:
    Open Reserved;
  • Floors:
    16
Developer Details

  • Developer:
    Unimont Realty
  • Phone:
  • Website:
    www.unimont.in
  • Address:
  • 705, 7th floor, Satra Plaza, Plot No. 19 & 20, Sector -19D, Palm Beach Road, Vashi, Navi Mumbai
Project Ratings
Project Brochures
Brochures of 24 Karatby Unimont Realty
Project Brochures
  • MPE/Brochures/30683/24karat broucher.pdf
Project Amenities
Amenities offred in 24 Karat
LIFESTYLE AMENITIES
Indoor GamesAir Conditioned LobbyKid's play areaJogging TrackGymnasiumPOP finished wallsConcealed PlumbingConcealed WiringGranite PlatformGranite PlatformReception DeskMulti Purpose HallYoga Room
Project RERA Details
RERA Project Status New
Proposed Possession 31 Mar 2029
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800050840
RERA Project Name 24 Karat
RERA Location 218A
RERA Developer Paper Mill Plant And Machinery Manufacturers Limited
Project RERA Details
Project Type Others
Funding Bank ICICI BANK LIMITED
Last Modified 14 Oct 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Jogeshwari

Facilities & Amenities
Facilities, Amenities & Common areas details of 24 Karatlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room And Dg Set
Energy management
Solar Panels Will Be Install
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Later In Scope Of Work
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
To Be Updated
Storm Water Drains
As Per Approved Plan
Street Lighting
Not Commenced.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Tank
Water Supply
After Completion From Mcgm
Buildings / Wings in 24 Karat
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 24 Karatby Unimont Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

38756 Sq. ft.

Project Area

11165 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

116 apartments in total
Total
116
Booked
53
Available
63

Saleable Area Statistics (Sq. ft.)

68268 Total
Total
68268
Booked
29059
Available
39209
Total 116 apartments in project. 53 apartments booked. 45% apartments booked.
Total 6342.29 saleable area. 2699.65 apartments booked.
43% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 20291611120105
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )16
11 Booked68% Booked
68% Booked
2 BHK63.25 Sq.mts. ( 681 Sq.ft. )9
4 Booked44% Booked
44% Booked
2 BHK63.66 Sq.mts. ( 685 Sq.ft. )10
2 Booked20% Booked
20% Booked
2 BHK63.73 Sq.mts. ( 686 Sq.ft. )10
5 Booked50% Booked
50% Booked
45 total apartments / 22 apartments booked. 48% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 20291511120104
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )22
17 Booked77% Booked
77% Booked
2 BHK63.25 Sq.mts. ( 681 Sq.ft. )13
2 BHK63.49 Sq.mts. ( 683 Sq.ft. )13
7 Booked53% Booked
53% Booked
2 BHK63.66 Sq.mts. ( 685 Sq.ft. )13
6 Booked46% Booked
46% Booked
61 total apartments / 31 apartments booked. 50% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 20292111201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space31.36 Sq.mts. ( 338 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space52.34 Sq.mts. ( 563 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space60.32 Sq.mts. ( 649 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space45.31 Sq.mts. ( 488 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space78.38 Sq.mts. ( 844 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.89 Sq.mts. ( 494 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop60.82 Sq.mts. ( 655 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop67.52 Sq.mts. ( 727 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31.58 Sq.mts. ( 340 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop42.58 Sq.mts. ( 458 Sq.ft. )1
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Project Consultants
Channel Partners Registered by Developer
Unimont Realty
for Project
24 Karat
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Unimont Realty