Project overview
Yogi Niwas is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015565. Yogi Niwas is located at Survey No 39A Hissa No 1A. This is a New being developed by Elite Infrastructure.
Yogi Niwas has 1 BHK Apartments with carpet areas ranging from 300 to 332 Sq.ft. Carpet. The Project has total 156 of which 4 are currently available for sale.
Yogi Niwas is being developed on a total land area of 12107 Sq.ft. out of which 17657 Sq.ft. i.e 146% is reserved for recreational purposes. Yogi Niwas has 5 Wings / Towers Building No 10,Building No 11,Building No 12,Building No 13,Building No 7-8
| Project | Developer | Location | Possession |
-
Developer:
Elite Infrastructure
-
Phone:
-
Address:
-
Jeevandeep Apatment
| MAHA REARA No: |
P51700015565 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Mr Jitendra S Patel Samarthya Engineers |
| Funding Bank |
KALLAPPANNA AWADE ICHALKARANJI JANATA SAHAKARI BANK LIMITED |
| Proposed Possession |
30 Apr 2026 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
08 Mar 2018 |
| Last Retrived |
26 Jul 2025 |
Yogi Niwas QR Code
Yogi Niwas
MahaRERA - P51700015565
| Type | Area |
| 1 BHK | 27.19 Sq.mts. ( 293 Sq.ft. ) |
| 1 BHK | 24.46 Sq.mts. ( 263 Sq.ft. ) |
| 1 BHK | 25.69 Sq.mts. ( 277 Sq.ft. ) |
| 1 BHK | 28 Sq.mts. ( 301 Sq.ft. ) |
| 1 BHK | 31.15 Sq.mts. ( 335 Sq.ft. ) |
| 1 BHK | 25.25 Sq.mts. ( 272 Sq.ft. ) |
| 1 BHK | 27.5 Sq.mts. ( 296 Sq.ft. ) |
| 1 BHK | 33.43 Sq.mts. ( 360 Sq.ft. ) |
| 1 BHK | 33.52 Sq.mts. ( 361 Sq.ft. ) |
| 1 BHK | 0 Sq.mts. ( 0 Sq.ft. ) |
| 1 BHK | 27.89 Sq.mts. ( 300 Sq.ft. ) |
| 1 BHK | 28.67 Sq.mts. ( 309 Sq.ft. ) |
| 1 BHK | 29.48 Sq.mts. ( 317 Sq.ft. ) |
| 1 BHK | 30.11 Sq.mts. ( 324 Sq.ft. ) |
| 1 BHK | 30.25 Sq.mts. ( 326 Sq.ft. ) |
| 1 BHK | 30.8 Sq.mts. ( 332 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Yogi Niwaslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space30% completed
|
|
1640.348 Sq. Mtr. Along With Phase 1 |
Community Buildings50% completed
|
|
Club House |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electrical Meter Room &Amp; Receiving Station Proposed |
|
|
|
Solar Lighting Proposed |
Fire Protection And Fire Safety
Requirements
|
|
- |
Landscaping & Tree Planting
|
|
Tree Planting Proposed |
|
|
|
- |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Chamber Lines Septic Tank Proposed |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
- |
|
|
|
- |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Stp Proposed |
Water Conservation, Rain water Harvesting
|
|
- |
|
|
|
Will Be Provided By Concerned Department |
Buildings / Wings in Yogi Niwas
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Yogi Niwas by Elite Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
156
apartments in total
Saleable Area Statistics (Sq. ft.)
48463
Total
Total 156 apartments in project. 152 apartments booked. 97% apartments booked.
Total 48463 Sq.ft. saleable area. 47171 saleable area booked.
97% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 10 | Oct 2025 | 8 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 27.19 Sq.mts. ( 293 Sq.ft. ) | 28 | |
28 total apartments / 28 apartments booked. 100% apartments booked. |
| Work Description in Building Building No 10 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 11 | Oct 2025 | 8 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 24.46 Sq.mts. ( 263 Sq.ft. ) | 7 | |
| 1 BHK | 25.69 Sq.mts. ( 277 Sq.ft. ) | 7 | |
| 1 BHK | 28 Sq.mts. ( 301 Sq.ft. ) | 7 | |
| 1 BHK | 31.15 Sq.mts. ( 335 Sq.ft. ) | 7 | |
28 total apartments / 27 apartments booked. 96% apartments booked. |
| Work Description in Building Building No 11 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 12 | Oct 2025 | 8 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 25.25 Sq.mts. ( 272 Sq.ft. ) | 7 | |
| 1 BHK | 27.5 Sq.mts. ( 296 Sq.ft. ) | 7 | |
| 1 BHK | 33.43 Sq.mts. ( 360 Sq.ft. ) | 7 | |
| 1 BHK | 33.52 Sq.mts. ( 361 Sq.ft. ) | 7 | |
28 total apartments / 28 apartments booked. 100% apartments booked. |
| Work Description in Building Building No 12 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 13 | Apr 2025 | 8 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 0 Sq.mts. ( 0 Sq.ft. ) | 0 | |
|
| Work Description in Building Building No 13 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 7-8 | Oct 2025 | 10 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 27.89 Sq.mts. ( 300 Sq.ft. ) | 9 | |
| 1 BHK | 28.67 Sq.mts. ( 309 Sq.ft. ) | 9 | |
| 1 BHK | 29.48 Sq.mts. ( 317 Sq.ft. ) | 9 | |
| 1 BHK | 30.11 Sq.mts. ( 324 Sq.ft. ) | 18 | |
| 1 BHK | 30.25 Sq.mts. ( 326 Sq.ft. ) | 18 | |
| 1 BHK | 30.8 Sq.mts. ( 332 Sq.ft. ) | 9 | |
72 total apartments / 69 apartments booked. 95% apartments booked. |
| Work Description in Building Building No 7-8 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Elite Infrastructure
for Project
Yogi Niwas
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |