Project overview

Yogi Niwas is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015565. Yogi Niwas is located at Survey No 39A Hissa No 1A. This is a New being developed by Elite Infrastructure.

Yogi Niwas has 1 BHK Apartments with carpet areas ranging from 300 to 332 Sq.ft. Carpet. The Project has total 156 of which 4 are currently available for sale.

Yogi Niwas is being developed on a total land area of 12107 Sq.ft. out of which 17657 Sq.ft. i.e 146% is reserved for recreational purposes. Yogi Niwas has 5 Wings / Towers Building No 10,Building No 11,Building No 12,Building No 13,Building No 7-8

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Yogi Niwas
  • Location:
  • Survey No 39A Hissa No 1A
  • Const. Stage:
    New
  • Possession:
    30 Apr 2026
Developer Details

  • Developer:
    Elite Infrastructure
  • Phone:
  • Address:
  • Jeevandeep Apatment
Project RERA Details
MAHA REARA No: P51700015565
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr Jitendra S Patel Samarthya Engineers
Funding Bank KALLAPPANNA AWADE ICHALKARANJI JANATA SAHAKARI BANK LIMITED
Proposed Possession 30 Apr 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Mar 2018
Last Retrived 26 Jul 2025
Yogi Niwas QR Code
Yogi Niwas
MahaRERA - P51700015565
Apartment Details & Configuration
TypeArea
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )
1 BHK24.46 Sq.mts. ( 263 Sq.ft. )
1 BHK25.69 Sq.mts. ( 277 Sq.ft. )
1 BHK28 Sq.mts. ( 301 Sq.ft. )
1 BHK31.15 Sq.mts. ( 335 Sq.ft. )
1 BHK25.25 Sq.mts. ( 272 Sq.ft. )
1 BHK27.5 Sq.mts. ( 296 Sq.ft. )
1 BHK33.43 Sq.mts. ( 360 Sq.ft. )
1 BHK33.52 Sq.mts. ( 361 Sq.ft. )
1 BHK0 Sq.mts. ( 0 Sq.ft. )
1 BHK27.89 Sq.mts. ( 300 Sq.ft. )
1 BHK28.67 Sq.mts. ( 309 Sq.ft. )
1 BHK29.48 Sq.mts. ( 317 Sq.ft. )
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )
1 BHK30.25 Sq.mts. ( 326 Sq.ft. )
1 BHK30.8 Sq.mts. ( 332 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Yogi Niwaslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space30% completed
30% Complete
1640.348 Sq. Mtr. Along With Phase 1
Community Buildings50% completed
50% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room &Amp; Receiving Station Proposed
Energy management
Solar Lighting Proposed
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
Tree Planting Proposed
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber Lines Septic Tank Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
Stp Proposed
Water Conservation, Rain water Harvesting
-
Water Supply
Will Be Provided By Concerned Department
Buildings / Wings in Yogi Niwas
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Yogi Niwas by Elite Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

12107 Sq. ft.

Project Area

17657 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

156 apartments in total
Total
156
Booked
152
Available
4

Saleable Area Statistics (Sq. ft.)

48463 Total
Total
48463
Booked
47171
Available
1292
Total 156 apartments in project. 152 apartments booked. 97% apartments booked.
Total 48463 Sq.ft. saleable area. 47171 saleable area booked.
97% area booked.

Building No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 10Oct 20258101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )28
28 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building Building No 10Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 11Oct 20258101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.46 Sq.mts. ( 263 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK25.69 Sq.mts. ( 277 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK28 Sq.mts. ( 301 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.15 Sq.mts. ( 335 Sq.ft. )7
6 Booked85% Booked
85% Booked
28 total apartments / 27 apartments booked. 96% apartments booked.
Work Description in Building Building No 11Completion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 12Oct 20258101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.25 Sq.mts. ( 272 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK27.5 Sq.mts. ( 296 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK33.43 Sq.mts. ( 360 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK33.52 Sq.mts. ( 361 Sq.ft. )7
7 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building Building No 12Completion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 13Apr 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 13Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 7-8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 7-8Oct 202510101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.89 Sq.mts. ( 300 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK28.67 Sq.mts. ( 309 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK29.48 Sq.mts. ( 317 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )18
16 Booked88% Booked
88% Booked
1 BHK30.25 Sq.mts. ( 326 Sq.ft. )18
18 Booked100% Booked
100% Booked
1 BHK30.8 Sq.mts. ( 332 Sq.ft. )9
9 Booked100% Booked
100% Booked
72 total apartments / 69 apartments booked. 95% apartments booked.
Work Description in Building Building No 7-8Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Elite Infrastructure
for Project
Yogi Niwas
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation