Project overview

Woodshire is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012252. Woodshire is located at Sy No 33 Hissa No 2. This is a Ongoing being developed by Sandeep.

Woodshire has 1 BHK, 1 BHK Ground, 2 BHK Ground, 2 BHK TYPE A & 2 BHK TYPE B Apartments with carpet areas ranging from 278 to 566 Sq.ft. Carpet. The Project has total 128 of which 13 are currently available for sale.

Woodshire is being developed on a total land area of 37674 Sq.ft. out of which 5651 Sq.ft. i.e 15% is reserved for recreational purposes. Woodshire has 1 Wings / Towers Falco Woodshire

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Woodshire
  • Location:
  • Sy No 33 Hissa No 2
  • Const. Stage:
    Ongoing
  • Possession:
    22 Dec 2022
Developer Details

  • Developer:
    Sandeep
  • Phone:
  • Address:
  • Na
Project RERA Details
MAHA REARA No: P51700012252
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Tejas V. Sahasrabuddhe
Funding Bank
Proposed Possession 22 Dec 2022
Revised Possession 22 Dec 2022
Extended Possession 31 Dec 2024
Litigations No Litigations
Last Modified 27 May 2025
Last Retrived 26 Jul 2025
Woodshire QR Code
Woodshire
MahaRERA - P51700012252
Apartment Details & Configuration
TypeArea
1 BHK33.87 Sq.mts. ( 365 Sq.ft. )
1 BHK Ground25.82 Sq.mts. ( 278 Sq.ft. )
2 BHK Ground40.14 Sq.mts. ( 432 Sq.ft. )
2 BHK TYPE A46.62 Sq.mts. ( 502 Sq.ft. )
2 BHK TYPE B52.56 Sq.mts. ( 566 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Woodshirelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Will Be Provided By Kdmc After Oc
Water Conservation, Rain water Harvesting
Na
Treatment And Disposal Of Sewage And Sullage Water
0
Street Lighting
Na
Storm Water Drains
Wip
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewerage Shall Be Carried Out. No Stp Is Proposed
Open Parking
Wip
Landscaping & Tree Planting
0
Internal Roads & Footpaths
Na
Fire Protection And Fire Safety Requirements
Na
Energy management
0
Electrical Meter Room, Sub-Station, Receiving Station
Substatn Common For 6 Bldgs No Recevng Stn Reqd
Community Buildings
0
Aggregate area of recreational Open Space
Wip
Buildings / Wings in Woodshire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Woodshire by Sandeeplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

37674 Sq. ft.

Project Area

5651 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

128 apartments in total
Total
128
Booked
115
Available
13

Saleable Area Statistics (Sq. ft.)

58570 Total
Total
58570
Booked
53230
Available
5340
Total 128 apartments in project. 115 apartments booked. 89% apartments booked.
Total 58570 Sq.ft. saleable area. 53230 saleable area booked.
91% area booked.

Falco Woodshire

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Falco WoodshireDec 2019151000150
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.87 Sq.mts. ( 365 Sq.ft. )56
55 Booked98% Booked
98% Booked
1 BHK Ground25.82 Sq.mts. ( 278 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK Ground40.14 Sq.mts. ( 432 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK TYPE A46.62 Sq.mts. ( 502 Sq.ft. )14
12 Booked85% Booked
85% Booked
2 BHK TYPE B52.56 Sq.mts. ( 566 Sq.ft. )50
48 Booked96% Booked
96% Booked
128 total apartments / 115 apartments booked. 89% apartments booked.
Work Description in Building Falco WoodshireCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress67% done
67% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sandeep
for Project
Woodshire
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation