Project overview

Wollywood Gold I is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000017007. Wollywood Gold I is located at 15611,14,15. This is a New being developed by Nirvana Lifestyle Homes Llp.

Wollywood Gold I has 1 BHK & 1 BHK SPACIOUS Apartments with carpet areas ranging from 334 to 483 Sq.ft. Carpet. The Project has total 96 of which 96 are currently available for sale.

Wollywood Gold I is being developed on a total land area of 53199 Sq.ft. Wollywood Gold I has 2 Wings / Towers A,E

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Wollywood Gold I
  • Location:
  • 15611,14,15
  • Const. Stage:
    New
  • Possession:
    31 Jul 2022
Developer Details

  • Developer:
    Nirvana Lifestyle Homes Llp
  • Phone:
  • Address:
  • Nirvana Realty
Project RERA Details
MAHA REARA No: P99000017007
Project Type Residential / Group Housing
RERA Project Status New
Architect Deepak Hiremath Associates
Funding Bank HDFC BANK
Proposed Possession 31 Jul 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Jun 2018
Last Retrived 28 Jul 2025
Wollywood Gold I QR Code
Wollywood Gold I
MahaRERA - P99000017007
Apartment Details & Configuration
TypeArea
1 BHK31.07 Sq.mts. ( 334 Sq.ft. )
1 BHK SPACIOUS44.91 Sq.mts. ( 483 Sq.ft. )
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Wollywood Gold Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
In Progress
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting20% completed
20% Complete
In Progress
Open Parking
In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)
In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains10% completed
10% Complete
In Progress
Street Lighting
In Progress
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Progress
Water Supply20% completed
20% Complete
In Progress
Buildings / Wings in Wollywood Gold I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Wollywood Gold I by Nirvana Lifestyle Homes Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

53199 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

96 apartments in total
Total
96
Booked
0
Available
96

Saleable Area Statistics (Sq. ft.)

38824 Total
Total
38824
Booked
0
Available
38824
Total 96 apartments in project. 0 apartments booked. 0% apartments booked.
Total 38824 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AJul 20214100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.07 Sq.mts. ( 334 Sq.ft. )36
None Booked0% Booked
0% Booked
1 BHK SPACIOUS44.91 Sq.mts. ( 483 Sq.ft. )36
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building ACompletion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
EJul 20214100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.07 Sq.mts. ( 334 Sq.ft. )12
None Booked0% Booked
0% Booked
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK SPACIOUS44.91 Sq.mts. ( 483 Sq.ft. )9
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building ECompletion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Nirvana Lifestyle Homes Llp
for Project
Wollywood Gold I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation