Project overview
Wollywood Gold I is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000017007. Wollywood Gold I is located at 15611,14,15. This is a New being developed by Nirvana Lifestyle Homes Llp.
Wollywood Gold I has 1 BHK & 1 BHK SPACIOUS Apartments with carpet areas ranging from 334 to 483 Sq.ft. Carpet. The Project has total 96 of which 96 are currently available for sale.
Wollywood Gold I is being developed on a total land area of 53199 Sq.ft. Wollywood Gold I has 2 Wings / Towers A,E
| Project | Developer | Location | Possession |
-
Project:
Wollywood Gold I
-
Location:
-
15611,14,15
-
Const. Stage:
New
-
Possession:
31 Jul 2022
| MAHA REARA No: |
P99000017007 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Deepak Hiremath Associates |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
31 Jul 2022 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
28 Jun 2018 |
| Last Retrived |
28 Jul 2025 |
Wollywood Gold I QR Code
Wollywood Gold I
MahaRERA - P99000017007
| Type | Area |
| 1 BHK | 31.07 Sq.mts. ( 334 Sq.ft. ) |
| 1 BHK SPACIOUS | 44.91 Sq.mts. ( 483 Sq.ft. ) |
| 1 BHK | 31.5 Sq.mts. ( 339 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Wollywood Gold Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
In Progress |
Electrical Meter Room, Sub-Station, Receiving Station40% completed
|
|
In Progress |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting20% completed
|
|
In Progress |
|
|
|
In Progress |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
In Progress |
Solid Waste Management And Disposal
|
|
Na |
Storm Water Drains10% completed
|
|
In Progress |
|
|
|
In Progress |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
In Progress |
Water Supply20% completed
|
|
In Progress |
Buildings / Wings in Wollywood Gold I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Wollywood Gold I by Nirvana Lifestyle Homes Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
96
apartments in total
Saleable Area Statistics (Sq. ft.)
38824
Total
Total 96 apartments in project. 0 apartments booked. 0% apartments booked.
Total 38824 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A | Jul 2021 | 4 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31.07 Sq.mts. ( 334 Sq.ft. ) | 36 | |
| 1 BHK SPACIOUS | 44.91 Sq.mts. ( 483 Sq.ft. ) | 36 | |
72 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| E | Jul 2021 | 4 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31.07 Sq.mts. ( 334 Sq.ft. ) | 12 | |
| 1 BHK | 31.5 Sq.mts. ( 339 Sq.ft. ) | 3 | |
| 1 BHK SPACIOUS | 44.91 Sq.mts. ( 483 Sq.ft. ) | 9 | |
24 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building E | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Nirvana Lifestyle Homes Llp
for Project
Wollywood Gold I
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |