Project overview

Wing D- Durvankur is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700004981. Wing D- Durvankur is located at Gut No 8 P. This is a Ongoing being developed by M K Patil Developers.

Wing D- Durvankur has OTHERS Apartments with carpet areas ranging from 3369 to 3369 Sq.ft. Carpet. The Project has total 11 of which 11 are currently available for sale.

Wing D- Durvankur is being developed on a total land area of 4405 Sq.ft. out of which 35174 Sq.ft. i.e 799% is reserved for recreational purposes. Wing D- Durvankur has 1 Wings / Towers Wing D- Durvankur

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Wing D- Durvankur
  • Location:
  • Gut No 8 P
  • Const. Stage:
    Ongoing
  • Possession:
    19 Aug 2019
Developer Details

  • Developer:
    M K Patil Developers
  • Phone:
  • Address:
  • Patil Plaza, Gut No.41
Project RERA Details
MAHA REARA No: P51700004981
Project Type Others
RERA Project Status Ongoing
Funding Bank ICICI BANK LIMITED
Proposed Possession 19 Aug 2019
Revised Possession 19 Aug 2019
Extended Possession 31 Dec 2023
Litigations No Litigations
Last Modified 21 Apr 2023
Last Retrived 26 Jul 2025
Wing D- Durvankur QR Code
Wing D- Durvankur
MahaRERA - P51700004981
Apartment Details & Configuration
TypeArea
OTHERS313 Sq.mts. ( 3369 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Wing D- Durvankurlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Meter Room Work Is In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Planting Work Yet Not Started
Open Parking50% completed
50% Complete
Work Partly Completed As Per Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
Muncipal Sewerage Line Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Yet Started
Street Lighting50% completed
50% Complete
Muncipal Council Streert Light Available
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Rain Water Harvesting Work Is In Progress
Water Supply
M.G.P. Get Connection After Oc
Buildings / Wings in Wing D- Durvankur
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Wing D- Durvankur by M K Patil Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4405 Sq. ft.

Project Area

35174 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

11 apartments in total
Total
11
Booked
0
Available
11

Saleable Area Statistics (Sq. ft.)

37060 Total
Total
37060
Booked
0
Available
37060
Total 11 apartments in project. 0 apartments booked. 0% apartments booked.
Total 37060 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Wing D- Durvankur

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D- DurvankurJan 19004110010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
OTHERS313 Sq.mts. ( 3369 Sq.ft. )11
None Booked0% Booked
0% Booked
11 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing D- DurvankurCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M K Patil Developers
for Project
Wing D- Durvankur
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation