Project overview

Wing B Of Composite Building No 1 Imperial Edge is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900000723. Wing B Of Composite Building No 1 Imperial Edge is located at 725 Pt 1/725 Pt 3/725 Pt. This is a Ongoing being developed by Sd Corporation Private Limited.

Wing B Of Composite Building No 1 Imperial Edge has 3 BHK Apartments with carpet areas ranging from 1541 to 1541 Sq.ft. Carpet. The Project has total 46 of which 6 are currently available for sale.

Wing B Of Composite Building No 1 Imperial Edge is being developed on a total land area of 13529 Sq.ft. Wing B Of Composite Building No 1 Imperial Edge has 1 Wings / Towers The Imperial Edge

ProjectDeveloperLocationPossession
Kalpataru PriveKalpataru Hills Residency Private Limited71631-10-2027 00:00:00
Servai TowerInclineestate Developers Llp1/27931-12-2026 00:00:00
The AltitudeVdv Infrastructures Llp24A/366 And 1/36631-03-2029 00:00:00
Wing B Of Composite Building No 1 Imperial EdgeSd Corporation Private Limited725 Pt 1/725 Pt 3/725 Pt30-12-2021 00:00:00
Carmichael ResidencesR A Realty Ventures LlpCarmichael Road Mumbai, 4-733 Part, Malabar-Camballa Hill Division30-09-2018 00:00:00
Ratan Luxuria Ratan AnnexShri Nakoda Enterprises4031-12-2018 00:00:00
Nathani Heights SaleNathani Parekh Constructions Private Limited1/33230-12-2025 00:00:00
Crescent AriaCrescent Property DevelopersMumbai City, 40003431-03-2017 00:00:00
S3 LegendSanghvi Premises Private LimitedCs No 344 Of Tardeo Division30-12-2024 00:00:00
Dudhwala Complex-Phase 2Rock Corner Developer Private Limited22231-12-2020 00:00:00
IoraVerain Commercials Llp29630-06-2022 00:00:00
TurquoiseMagnetic Properties Private LimitedMumbai City, 40002631-03-2021 00:00:00
Contemporary Builder Private Limited Tardeo ProjectContemporary Builders Private Limited384 385 Tardeo30-12-2023 00:00:00
Arkade RiseArkade Paradigm1A/71630-12-2021 00:00:00
Meher VillaLiving Stone Construction Private Limited160030-12-2023 00:00:00
Aaditya HeightsSanghvi Realty Pivate Ltd.33630-12-2024 00:00:00
Crescent TowerCrescent Builders1 725 And 725 Pt31-03-2019 00:00:00
Nathani Heights RehabNathani Parekh Constructions Private Limited1/33230-12-2021 00:00:00
Project Details
  • Project:
    Wing B Of Composite Building No 1 Imperial Edge
  • Location:
  • 725 Pt 1/725 Pt 3/725 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Sd Corporation Private Limited
  • Phone:
  • Address:
  • Sp Centre
Project RERA Details
MAHA REARA No: P51900000723
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vision
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 27 Oct 2020
Last Retrived 26 Jul 2025
Wing B Of Composite Building No 1 Imperial Edge QR Code
Wing B Of Composite Building No 1 Imperial Edge
MahaRERA - P51900000723
Apartment Details & Configuration
TypeArea
3 BHK143.14 Sq.mts. ( 1541 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Wing B Of Composite Building No 1 Imperial Edgelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management100% completed
95% Complete
Done
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting97% completed
97% Complete
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal100% completed
95% Complete
Done
Storm Water Drains100% completed
95% Complete
Done
Street Lighting100% completed
95% Complete
Done
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Done
Water Conservation, Rain water Harvesting50% completed
50% Complete
Work In Progress
Water Supply100% completed
95% Complete
Done
Buildings / Wings in Wing B Of Composite Building No 1 Imperial Edge
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Wing B Of Composite Building No 1 Imperial Edge by Sd Corporation Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

13529 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

46 apartments in total
Total
46
Booked
40
Available
6

Saleable Area Statistics (Sq. ft.)

70875 Total
Total
70875
Booked
61630
Available
9245
Total 46 apartments in project. 40 apartments booked. 86% apartments booked.
Total 70875 Sq.ft. saleable area. 61630 saleable area booked.
87% area booked.

The Imperial Edge

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
The Imperial EdgeDec 2020511212101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK143.14 Sq.mts. ( 1541 Sq.ft. )46
40 Booked86% Booked
86% Booked
46 total apartments / 40 apartments booked. 86% apartments booked.
Work Description in Building The Imperial EdgeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress97% done
97% Booked
Sanitary Fittings within the flats / premises
work-in-progress97% done
97% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sd Corporation Private Limited
for Project
Wing B Of Composite Building No 1 Imperial Edge
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation