Project overview

Windermere Tower C is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700050981. Windermere Tower C is located at New S.No./Olds.No./H.No.221/564/1,3,4A,4B,8.News.No/Olds.No/H.No/220/565/1,4,6,7,8,9,10.News.No/Olds.No/H.No/267/567/1,2/1.News.No/Old S.No/245/579/1A,1B,2,3A,3B,3C,4,5,6,7. This is a New being developed by A G Superstrcutures Pvt Ltd.

Windermere Tower C has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 1762 to 990 Sq.ft. Carpet. The Project has total 201 of which 199 are currently available for sale.

Windermere Tower C is being developed on a total land area of 30380 Sq.ft. out of which 12868 Sq.ft. i.e 42% is reserved for recreational purposes. Windermere Tower C has 1 Wings / Towers Windermere Tower C

ProjectDeveloperLocationPossession
Vraj VatikaMbp Realtors Llp40110130-06-2026 00:00:00
Sudama Vallabh Wing A,B,CPravin Vandravandas VoraOld S. No. 56830-06-2026 00:00:00
N G BavenoRna Builders (Ng)Survey No 336 Hissa No 215-12-2019 00:00:00
Sai Charan Complex Building No 3Om Sai Charan BuildersS No 80 Old New S No 6 Hissa No 4 Village Goddev30-12-2022 00:00:00
Skyline Wing - CShri Ratnaraj Infra LlpOld S No.559,New S No.20731-12-2029 00:00:00
Windermere Tower BA G Superstructures Pvt LtdNew S.No./Old S.No./H.No. 221/564/1,3,4A,4B,8,New S.No/Olds.No./H.No/220/565/1/4,6,7,8,9,10.New S.No/Olds.No/H.No/267/567/1,2/1New S.No/Olds.No/245/579/1A,1B,2,3A3b,3C,4,5,6,731-12-2028 00:00:00
North Westend Tower 1Jp Infra Realty Private Limited23731-12-2029 00:00:00
Unique Estate Type-C Wing DSiddhivinayak DevelopersOld Sno 400 New Sno 58 Hno 9,13,14,16,17,19,20,21A31-03-2027 00:00:00
Man MandirTritonia Buildcon And Infra Private LimitedThane, Bhayander West, 40110130-12-2028 00:00:00
Radheshyam RegencyShri Satima EnterpriseCts No 217 To 225 , 232, 23331-12-2018 00:00:00
Dev AanganSdc Properties Private Limited1681A,1682A,1683A,1684A,1685A30-12-2022 00:00:00
Project Details
  • Project:
    Windermere Tower C
  • Location:
  • New S.No./Olds.No./H.No.221/564/1,3,4A,4B,8.News.No/Olds.No/H.No/220/565/1,4,6,7,8,9,10.News.No/Olds.No/H.No/267/567/1,2/1.News.No/Old S.No/245/579/1A,1B,2,3A,3B,3C,4,5,6,7
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    A G Superstrcutures Pvt Ltd
  • Phone:
  • Address:
  • Maker Chmabers Iii
Project RERA Details
MAHA REARA No: P51700050981
Project Type Residential / Group Housing
RERA Project Status New
Architect Rujuta
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 Apr 2024
Last Retrived 26 Jul 2025
Windermere Tower C QR Code
Windermere Tower C
MahaRERA - P51700050981
Apartment Details & Configuration
TypeArea
1 BHK44.55 Sq.mts. ( 480 Sq.ft. )
2 BHK60.71 Sq.mts. ( 653 Sq.ft. )
2 BHK60.8 Sq.mts. ( 654 Sq.ft. )
2 BHK62.56 Sq.mts. ( 673 Sq.ft. )
Shop80.19 Sq.mts. ( 863 Sq.ft. )
Shop91.96 Sq.mts. ( 990 Sq.ft. )
Shop163.72 Sq.mts. ( 1762 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Windermere Tower Clast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Meter Room Will Be Provided
Energy management
Led Fitting Will Be Used
Fire Protection And Fire Safety Requirements
As Per Mbmc Cfo Noc
Landscaping & Tree Planting
Soft And Hard Scope
Open Parking
Common At Podium Level
Sewerage (Chamber, Lines, Septic Tank , STP)
Connection To Mbmc
Solid Waste Management And Disposal
Common Garbage Disposal System
Storm Water Drains
Connection To Mbmc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Stp Outside Building Line
Water Conservation, Rain water Harvesting
Connection Tank Outside Building Line
Water Supply
Mbmc Supply Line
Buildings / Wings in Windermere Tower C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Windermere Tower C by A G Superstrcutures Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

30380 Sq. ft.

Project Area

12868 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

201 apartments in total
Total
201
Booked
2
Available
199

Saleable Area Statistics (Sq. ft.)

127750 Total
Total
127750
Booked
1134
Available
126616
Total 201 apartments in project. 2 apartments booked. 0% apartments booked.
Total 127750 Sq.ft. saleable area. 1134 saleable area booked.
1% area booked.

Windermere Tower C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Tower CDec 20282510140201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.55 Sq.mts. ( 480 Sq.ft. )45
2 BHK60.71 Sq.mts. ( 653 Sq.ft. )50
None Booked0% Booked
0% Booked
2 BHK60.8 Sq.mts. ( 654 Sq.ft. )50
2 BHK62.56 Sq.mts. ( 673 Sq.ft. )50
None Booked0% Booked
0% Booked
Shop80.19 Sq.mts. ( 863 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop91.96 Sq.mts. ( 990 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop163.72 Sq.mts. ( 1762 Sq.ft. )2
None Booked0% Booked
0% Booked
201 total apartments / 2 apartments booked. 0% apartments booked.
Work Description in Building Windermere Tower CCompletion
Basement (if any)
work-in-progress25% done
25% Booked
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress25% done
25% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress25% done
25% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
A G Superstrcutures Pvt Ltd
for Project
Windermere Tower C
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation