Project overview
Whispering Towers Efg Wings is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007809. Whispering Towers Efg Wings is located at 552-P. This is a Ongoing being developed by Housing Development And Infrastructure Ltd.
Whispering Towers Efg Wings has RESIDENTIAL Apartments with carpet areas ranging from 753 to 836 Sq.ft. Carpet. The Project has total 602 of which 278 are currently available for sale.
Whispering Towers Efg Wings is being developed on a total land area of 85735 Sq.ft. out of which 56246 Sq.ft. i.e 66% is reserved for recreational purposes. Whispering Towers Efg Wings has 6 Wings / Towers Wing - E,Wing - F,Wing - G,Wing E - Phase 2-29Th To 40Th Floor,Wing F - Phase 2-29Th To 40Th Floor,Wing G - Phase 2-29Th To 40Th Floor
| Project | Developer | Location | Possession |
| MAHA REARA No: |
P51800007809 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
Ongoing |
| Architect |
Indrajeet S. Deshmukh |
| Funding Bank |
BHARAT COOPERATIVE BANK MUMBAI LIMITED |
| Proposed Possession |
30 Nov 2020 |
| Revised Possession |
30 Nov 2020 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
18 Aug 2017 |
| Last Retrived |
26 Jul 2025 |
Whispering Towers Efg Wings QR Code
Whispering Towers Efg Wings
MahaRERA - P51800007809
| Type | Area |
| RESIDENTIAL | 70.3 Sq.mts. ( 757 Sq.ft. ) |
| RESIDENTIAL | 87 Sq.mts. ( 936 Sq.ft. ) |
| RESIDENTIAL | 106.25 Sq.mts. ( 1144 Sq.ft. ) |
| RESIDENTIAL | 70.15 Sq.mts. ( 755 Sq.ft. ) |
| RESIDENTIAL | 75 Sq.mts. ( 807 Sq.ft. ) |
| RESIDENTIAL | 75.55 Sq.mts. ( 813 Sq.ft. ) |
| RESIDENTIAL | 86.7 Sq.mts. ( 933 Sq.ft. ) |
| RESIDENTIAL | 86.9 Sq.mts. ( 935 Sq.ft. ) |
| RESIDENTIAL | 70 Sq.mts. ( 753 Sq.ft. ) |
| RESIDENTIAL | 74.85 Sq.mts. ( 806 Sq.ft. ) |
| RESIDENTIAL | 77.65 Sq.mts. ( 836 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Whispering Towers Efg Wingslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Provided For Entire Layout |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station30% completed
|
|
Receving Station Work Completed |
|
|
|
Yet To Commence |
Fire Protection And Fire Safety
Requirements
|
|
Yet To Commence |
Landscaping & Tree Planting
|
|
Yet To Commence |
|
|
|
Yet To Commence |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Yet To Commence |
Solid Waste Management And Disposal
|
|
Yet To Commence |
|
|
|
Yet To Commence |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Yet To Commence |
Water Conservation, Rain water Harvesting
|
|
Yet To Commence |
|
|
|
Yet To Commence |
Buildings / Wings in Whispering Towers Efg Wings
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Whispering Towers Efg Wings by Housing Development And Infrastructure Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
602
apartments in total
Saleable Area Statistics (Sq. ft.)
522283
Total
Total 602 apartments in project. 324 apartments booked. 53% apartments booked.
Total 522283 Sq.ft. saleable area. 291772 saleable area booked.
56% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - E | Jan 1900 | 29 | 1 | 2 | 0 | 6 | 2 | 206 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 70.3 Sq.mts. ( 757 Sq.ft. ) | 50 | |
| RESIDENTIAL | 87 Sq.mts. ( 936 Sq.ft. ) | 50 | |
| RESIDENTIAL | 106.25 Sq.mts. ( 1144 Sq.ft. ) | 56 | |
156 total apartments / 130 apartments booked. 83% apartments booked. |
| Work Description in Building Wing - E | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - F | Jan 1900 | 29 | 1 | 2 | 0 | 6 | 2 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 70.15 Sq.mts. ( 755 Sq.ft. ) | 50 | |
| RESIDENTIAL | 75 Sq.mts. ( 807 Sq.ft. ) | 22 | |
| RESIDENTIAL | 75.55 Sq.mts. ( 813 Sq.ft. ) | 28 | |
| RESIDENTIAL | 86.7 Sq.mts. ( 933 Sq.ft. ) | 50 | |
| RESIDENTIAL | 86.9 Sq.mts. ( 935 Sq.ft. ) | 6 | |
156 total apartments / 65 apartments booked. 41% apartments booked. |
| Work Description in Building Wing - F | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - G | Jan 1900 | 29 | 1 | 2 | 0 | 6 | 2 | 127 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 70 Sq.mts. ( 753 Sq.ft. ) | 50 | |
| RESIDENTIAL | 74.85 Sq.mts. ( 806 Sq.ft. ) | 28 | |
| RESIDENTIAL | 77.65 Sq.mts. ( 836 Sq.ft. ) | 28 | |
106 total apartments / 86 apartments booked. 81% apartments booked. |
| Work Description in Building Wing - G | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing E - Phase 2-29Th To 40Th Floor | Jan 1900 | 12 | 0 | 0 | 0 | 0 | 0 | 93 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 70.3 Sq.mts. ( 757 Sq.ft. ) | 22 | |
| RESIDENTIAL | 87 Sq.mts. ( 936 Sq.ft. ) | 23 | |
| RESIDENTIAL | 106.25 Sq.mts. ( 1144 Sq.ft. ) | 24 | |
69 total apartments / 29 apartments booked. 42% apartments booked. |
| Work Description in Building Wing E - Phase 2-29Th To 40Th Floor | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing F - Phase 2-29Th To 40Th Floor | Jan 1900 | 12 | 0 | 0 | 0 | 0 | 0 | 91 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 70.15 Sq.mts. ( 755 Sq.ft. ) | 23 | |
| RESIDENTIAL | 75 Sq.mts. ( 807 Sq.ft. ) | 11 | |
| RESIDENTIAL | 75.55 Sq.mts. ( 813 Sq.ft. ) | 12 | |
| RESIDENTIAL | 86.7 Sq.mts. ( 933 Sq.ft. ) | 22 | |
| RESIDENTIAL | 86.9 Sq.mts. ( 935 Sq.ft. ) | 1 | |
69 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing F - Phase 2-29Th To 40Th Floor | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing G - Phase 2-29Th To 40Th Floor | Jan 1900 | 12 | 0 | 0 | 0 | 0 | 0 | 55 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 70 Sq.mts. ( 753 Sq.ft. ) | 22 | |
| RESIDENTIAL | 74.85 Sq.mts. ( 806 Sq.ft. ) | 12 | |
| RESIDENTIAL | 77.65 Sq.mts. ( 836 Sq.ft. ) | 12 | |
46 total apartments / 14 apartments booked. 30% apartments booked. |
| Work Description in Building Wing G - Phase 2-29Th To 40Th Floor | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Whispering Towers Efg Wings
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |