Project overview

WHISPERING TOWER-ABCD is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009742. WHISPERING TOWER-ABCD is located at 552-P. This is a Ongoing being developed by HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD.

WHISPERING TOWER-ABCD has RESIDENTIAL Apartments with carpet areas ranging from 755 to 836 Sq.ft. Carpet. The Project has total 754 of which 662 are currently available for sale.

WHISPERING TOWER-ABCD is being developed on a total land area of 116280 Sq.ft. out of which 56246 Sq.ft. i.e 48% is reserved for recreational purposes. WHISPERING TOWER-ABCD has 8 Wings / Towers Wing - A,Wing - A , Phase - Ii, 29Th To 40Th Floor,Wing - B,Wing - B, Phase-Ii, 29Th To 40Th Floor,Wing - C,Wing - C, Phase-Ii, 29Th To 40Th Floor,Wing - D,Wing-D, Phase-Ii, 29Th To 40Th Floor

ProjectDeveloperLocationPossession
Project Details
  • Project:
    WHISPERING TOWER-ABCD
  • Location:
  • 552-P
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2022
Developer Details

  • Developer:
    HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD
  • Phone:
  • Address:
  • Hdil Towers
Project RERA Details
MAHA REARA No: P51800009742
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Indrajeet Deshmukh
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 30 Oct 2022
Revised Possession 30 Oct 2022
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 13 Feb 2026
WHISPERING TOWER-ABCD QR Code
WHISPERING TOWER-ABCD
MahaRERA - P51800009742
Apartment Details & Configuration
TypeArea
RESIDENTIAL70.3 Sq.mts. ( 757 Sq.ft. )
RESIDENTIAL75 Sq.mts. ( 807 Sq.ft. )
RESIDENTIAL70.4 Sq.mts. ( 758 Sq.ft. )
RESIDENTIAL71.15 Sq.mts. ( 766 Sq.ft. )
RESIDENTIAL106.25 Sq.mts. ( 1144 Sq.ft. )
RESIDENTIAL74.4 Sq.mts. ( 801 Sq.ft. )
RESIDENTIAL68.3 Sq.mts. ( 735 Sq.ft. )
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )
RESIDENTIAL86.7 Sq.mts. ( 933 Sq.ft. )
RESIDENTIAL87.2 Sq.mts. ( 939 Sq.ft. )
RESIDENTIAL77.65 Sq.mts. ( 836 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of WHISPERING TOWER-ABCDlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Yet To Commence
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Work In Progress
Energy management
Yet To Commence
Fire Protection And Fire Safety Requirements
Yet To Commence
Landscaping & Tree Planting
Yet To Commence
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Commence
Solid Waste Management And Disposal
Yet To Commence
Storm Water Drains
Yet To Commence
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Yet To Commence
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in WHISPERING TOWER-ABCD
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of WHISPERING TOWER-ABCD by HOUSING DEVELOPMENT AND INFRASTRUCTURE LTDlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

116280 Sq. ft.

Project Area

56246 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

754 apartments in total
Total
754
Booked
92
Available
662

Saleable Area Statistics (Sq. ft.)

629950 Total
Total
629950
Booked
80864
Available
549086
Total 754 apartments in project. 92 apartments booked. 12% apartments booked.
Total 629950 Sq.ft. saleable area. 80864 saleable area booked.
13% area booked.

Wing - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - AJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.3 Sq.mts. ( 757 Sq.ft. )50
10 Booked20% Booked
20% Booked
RESIDENTIAL75 Sq.mts. ( 807 Sq.ft. )56
106 total apartments / 17 apartments booked. 16% apartments booked.
Work Description in Building Wing - ACompletion
Basement (if any)
Excavation
work-in-progress30% done
30% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - A , Phase - Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - A , Phase - Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.3 Sq.mts. ( 757 Sq.ft. )22
None Booked0% Booked
0% Booked
RESIDENTIAL75 Sq.mts. ( 807 Sq.ft. )24
None Booked0% Booked
0% Booked
46 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - A , Phase - Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.4 Sq.mts. ( 758 Sq.ft. )50
RESIDENTIAL71.15 Sq.mts. ( 766 Sq.ft. )50
None Booked0% Booked
0% Booked
RESIDENTIAL106.25 Sq.mts. ( 1144 Sq.ft. )56
21 Booked37% Booked
37% Booked
156 total apartments / 24 apartments booked. 15% apartments booked.
Work Description in Building Wing - BCompletion
Basement (if any)
work-in-progress75% done
75% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress75% done
75% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - B, Phase-Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - B, Phase-Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL71.15 Sq.mts. ( 766 Sq.ft. )22
None Booked0% Booked
0% Booked
RESIDENTIAL74.4 Sq.mts. ( 801 Sq.ft. )23
None Booked0% Booked
0% Booked
RESIDENTIAL106.25 Sq.mts. ( 1144 Sq.ft. )24
None Booked0% Booked
0% Booked
69 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - B, Phase-Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - CJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL68.3 Sq.mts. ( 735 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )44
None Booked0% Booked
0% Booked
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )50
RESIDENTIAL86.7 Sq.mts. ( 933 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL87.2 Sq.mts. ( 939 Sq.ft. )50
156 total apartments / 10 apartments booked. 6% apartments booked.
Work Description in Building Wing - CCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - C, Phase-Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - C, Phase-Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL68.3 Sq.mts. ( 735 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )22
None Booked0% Booked
0% Booked
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )23
None Booked0% Booked
0% Booked
RESIDENTIAL86.7 Sq.mts. ( 933 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL87.2 Sq.mts. ( 939 Sq.ft. )22
None Booked0% Booked
0% Booked
69 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - C, Phase-Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - DJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )50
18 Booked36% Booked
36% Booked
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )28
21 Booked75% Booked
75% Booked
RESIDENTIAL77.65 Sq.mts. ( 836 Sq.ft. )28
106 total apartments / 40 apartments booked. 37% apartments booked.
Work Description in Building Wing - DCompletion
Basement (if any)
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing-D, Phase-Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing-D, Phase-Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )22
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )12
None Booked0% Booked
0% Booked
RESIDENTIAL77.65 Sq.mts. ( 836 Sq.ft. )12
None Booked0% Booked
0% Booked
46 total apartments / 1 apartments booked. 2% apartments booked.
Work Description in Building Wing-D, Phase-Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD
for Project
WHISPERING TOWER-ABCD
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation