Project overview

Whispering Tower-Abcd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009742. Whispering Tower-Abcd is located at 552-P. This is a Ongoing being developed by Housing Development And Infrastructure Ltd.

Whispering Tower-Abcd has RESIDENTIAL Apartments with carpet areas ranging from 755 to 836 Sq.ft. Carpet. The Project has total 754 of which 662 are currently available for sale.

Whispering Tower-Abcd is being developed on a total land area of 116280 Sq.ft. out of which 56246 Sq.ft. i.e 48% is reserved for recreational purposes. Whispering Tower-Abcd has 8 Wings / Towers Wing - A,Wing - A , Phase - Ii, 29Th To 40Th Floor,Wing - B,Wing - B, Phase-Ii, 29Th To 40Th Floor,Wing - C,Wing - C, Phase-Ii, 29Th To 40Th Floor,Wing - D,Wing-D, Phase-Ii, 29Th To 40Th Floor

ProjectDeveloperLocationPossession
Marathon Emblem-2United Enterprises764/4A/1, 764/4A/231-12-2019 00:00:00
Marathon Emblem-1United Enterprises764/4A/1, 764/4A/230-06-2019 00:00:00
Montana Phase - 1Lohitka Properties Llp531P30-12-2023 00:00:00
New Murli Malhar ChsGuinea Global Builders And Developers769-A30-09-2019 00:00:00
Neptunes LotusVrutti Developers LlpMumbai Suburban31-12-2020 00:00:00
Mulund Mahavirdham Co. Op. Housing Soc. Ltd. Maverick Realtors102830-06-2021 00:00:00
Balaji AccoladeBalaji Developers107431-07-2019 00:00:00
Mahavir AshishSarvoday Enterprises579/1, 579/2, 57931-12-2019 00:00:00
Marigold MiraayaMarigold RealtyCts No/551/4430-12-2024 00:00:00
Mulund Narayan Pushp Chs LtdGreenfield DevelopersCts No 1055 A31-07-2019 00:00:00
TrishlaSahyadri Developers703 Pt31-12-2019 00:00:00
Moreshwar TowerYashraj Corporation979, 979 1 To 531-03-2020 00:00:00
KeshavpadaNamah RealtorsCts 1115 Pt30-06-2022 00:00:00
Silver Scape/Silver EnclaveMalde Properties Llp88930-12-2023 00:00:00
Shreeji HarmonyShreenath BuildersMumbai Suburban, 40008030-06-2018 00:00:00
Bhalla Chsl Jupiter - VenusChetna Global1109/2A, 1109/2B, 1109/331-12-2019 00:00:00
Atmosphere Phase 1Atmosphere Realty Pvt LtdCts 784 784-1 786 788 792-A 793 785 787 791 848 79031-10-2019 00:00:00
Prem ChitralekhaHitesh Enterprises795 A1b06-09-2018 00:00:00
Maya HarmonyMaya Developers876 876 1 876 1320-11-2020 00:00:00
Satra Business ParkSatra Developers300 A/231-03-2018 00:00:00
The Vrindavan Nagar Chs LtdAmi Housing Limited1087 And 108831-12-2017 00:00:00
Piramal Revanta - Tower 2Prl Developers Private LimitedCts No.491 A/5 And 491A/630-09-2023 00:00:00
Montana Phase - 2Lohitka Properties LlpMumbai Suburban30-12-2024 00:00:00
Kailash ResidencyTridev Shreeji Associates927-1 To 5, Cts No 926, 92728-08-2022 00:00:00
VivantaKshitij Realtors And Developers244 Pt, 24431-07-2022 00:00:00
Sanaya ElysiumM/S Sanaya Realties Pvt Ltd1026 Of Mulund West20-12-2022 00:00:00
Sandu AarambhSandu DevelopersPlot No 9B Cts No 551/ 6431-12-2018 00:00:00
Parijatak Co Op Hsg Soc LtdSunrise Housing1312, 1313/1 To 1313/1731-12-2019 00:00:00
Michael EnclaveRajesh SavlaMumbai Suburban, 40008031-03-2018 00:00:00
Shivgiri Co Op Hsg Soc LtdHealth Colonies & Construction Pvt.Ltd.Plot No 1109-1 Of Village Mulund Off L B S Marg Mulund West Mumbai 400 08031-12-2018 00:00:00
Kalpataru ElitusArimas Real Estate Private Limited533/2 Pt And 553 Pt Of Village Nahur, Cts No. 533Pt 533/130-09-2028 00:00:00
Amardeep AllianceAlliance City Developers Realtors Pvt Ltd551/631-07-2024 00:00:00
Montana Phase - 4Lohitka Properties Llp532A-P And 534P31-12-2026 00:00:00
Meridean AssociatesMeridean AssociatesCts 94031-12-2017 00:00:00
Maverick MooldeepMaverick Realtors138230-12-2022 00:00:00
Nirmal Lifestyle-ZirconNirmal Lifestyle Ltd491 A/2, Part 491 A/131-12-2018 00:00:00
Anandi HeightsSarvoday Enterprises1364, 1364/1-1364/1030-12-2020 00:00:00
Mulund Mahavir DarshanChheda Lifestyles135A/1335/100015-10-2018 00:00:00
Rupji SignatureRupji Constructions400080, Mumbai Suburban15-03-2017 00:00:00
Whispering Tower-AbcdHousing Development And Infrastructure Ltd552-P30-10-2022 00:00:00
Shiv GauriBhoomi Realtors551, 547, 627 To 63431-12-2018 00:00:00
Marathon Neosquare AMarathon Nextgen Realty Ltd97B, 97A, 87B/1 To 330-12-2022 00:00:00
Shreeji ResidencyShree Siddhivinayak Construction Co1343/1, 134331-01-2021 00:00:00
Marathon MonteplazaMarathon Realty Pvt Ltd551/1330-12-2022 00:00:00
Montana Phase - 3Lohitka Properties LlpOut Of Cst 51430-12-2024 00:00:00
Sanjiv Co-Op Hsg Soc. Ltd.Chetna Home LlpCts No. 989, Plot No. 103631-12-2018 00:00:00
NeonaR. K. Constructions1482 And 1483 A Pt31-07-2018 00:00:00
ShivdhamSg And Bhp DevelopersMumbai Suburban31-12-2018 00:00:00
Mutual Benefit Co Op Hsg Soc LtdSunrise HousingCts No 106931-12-2019 00:00:00
Enigma Towers A And BOberoi Constructions LimitedCts No 475 Pt, 475/4, 475/6Pt Of Village Mulund30-12-2022 00:00:00
Marathon Monte Carlo-2Marathon Realty Pvt Ltd551/1330-12-2023 00:00:00
N And G Co Op Housing Soc Ltd Maverick Realtors1250/330-06-2021 00:00:00
The PinnacleGerarie Enterprises And Developers Pvt. Ltd904 A And 90531-12-2018 00:00:00
Manisha PrideGovind Papa Naidu1237/1To18, 123731-12-2017 00:00:00
Srishti Oasis Ph 2 Wing B SandsShiv Krupa EnterpriseCts 479 Part30-12-2022 00:00:00
The EliteR R D Heights And Builders Pvt Ltd55530-12-2023 00:00:00
Piramal Revanta - Tower 1Prl Developers Private LimitedCts No. 491 A/5 And 491 A/630-03-2023 00:00:00
Nirmal Lifestyle-AmethystNirmal Lifestyle Ltd49 1A/3, Cts 491 A/231-03-2019 00:00:00
Balaji ApartmentTridev Realty And Construction Pvt Ltd109730-12-2023 00:00:00
Tridev AnubhavTridev Realty And Construction Pvt Ltd702-B30-12-2023 00:00:00
Olympia A BNirmal DeveloperMumbai Suburban, 40008030-06-2019 00:00:00
Aspire ResidencyAspire Residency LlpCts No 702A/231-08-2019 00:00:00
Sai Rachana ApartmentShri Sai Bhoo RachanaCts No 747 Part Village Mulund West31-12-2018 00:00:00
Silver ParkSilvex Constructions Pvt Ltd44/231-12-2018 00:00:00
Aakruti Aashvi ApartmentAakruti Aashvi Developers767, 767/1 To 7 And 767/830-06-2022 00:00:00
Alag MarinaAlag Property Constructions Pvt. Ltd.551/530-06-2021 00:00:00
Piramal Revanta - Tower 3Prl Developers Private LimitedCts No 491 A 531-12-2025 00:00:00
Mulund Om Chs LtdSunrise HousingCts No 551/41 Of Village Nahur Mulund - West30-12-2024 00:00:00
Neelkanth Tirth Co. Op. Housing Soc. Ltd. Maverick Realtors1250/10 And 1250/1130-06-2021 00:00:00
Rohini Residency Of Jeevan Kunj Chs LtdAaryan RealtorsGohils Scheme Plot No.3, Cts No. 107231-12-2017 00:00:00
Olympia C DNirmal DevelopersMulund West30-06-2019 00:00:00
Project Details
  • Project:
    Whispering Tower-Abcd
  • Location:
  • 552-P
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2022
Developer Details

  • Developer:
    Housing Development And Infrastructure Ltd
  • Phone:
  • Address:
  • Hdil Towers
Project RERA Details
MAHA REARA No: P51800009742
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Indrajeet Deshmukh
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 30 Oct 2022
Revised Possession 30 Oct 2022
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 26 Jul 2025
Whispering Tower-Abcd QR Code
Whispering Tower-Abcd
MahaRERA - P51800009742
Apartment Details & Configuration
TypeArea
RESIDENTIAL70.3 Sq.mts. ( 757 Sq.ft. )
RESIDENTIAL75 Sq.mts. ( 807 Sq.ft. )
RESIDENTIAL70.4 Sq.mts. ( 758 Sq.ft. )
RESIDENTIAL71.15 Sq.mts. ( 766 Sq.ft. )
RESIDENTIAL106.25 Sq.mts. ( 1144 Sq.ft. )
RESIDENTIAL74.4 Sq.mts. ( 801 Sq.ft. )
RESIDENTIAL68.3 Sq.mts. ( 735 Sq.ft. )
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )
RESIDENTIAL86.7 Sq.mts. ( 933 Sq.ft. )
RESIDENTIAL87.2 Sq.mts. ( 939 Sq.ft. )
RESIDENTIAL77.65 Sq.mts. ( 836 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Whispering Tower-Abcdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Yet To Commence
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Work In Progress
Energy management
Yet To Commence
Fire Protection And Fire Safety Requirements
Yet To Commence
Landscaping & Tree Planting
Yet To Commence
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Commence
Solid Waste Management And Disposal
Yet To Commence
Storm Water Drains
Yet To Commence
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Yet To Commence
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in Whispering Tower-Abcd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Whispering Tower-Abcd by Housing Development And Infrastructure Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

116280 Sq. ft.

Project Area

56246 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

754 apartments in total
Total
754
Booked
92
Available
662

Saleable Area Statistics (Sq. ft.)

629950 Total
Total
629950
Booked
80864
Available
549086
Total 754 apartments in project. 92 apartments booked. 12% apartments booked.
Total 629950 Sq.ft. saleable area. 80864 saleable area booked.
13% area booked.

Wing - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - AJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.3 Sq.mts. ( 757 Sq.ft. )50
10 Booked20% Booked
20% Booked
RESIDENTIAL75 Sq.mts. ( 807 Sq.ft. )56
106 total apartments / 17 apartments booked. 16% apartments booked.
Work Description in Building Wing - ACompletion
Basement (if any)
Excavation
work-in-progress30% done
30% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - A , Phase - Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - A , Phase - Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.3 Sq.mts. ( 757 Sq.ft. )22
None Booked0% Booked
0% Booked
RESIDENTIAL75 Sq.mts. ( 807 Sq.ft. )24
None Booked0% Booked
0% Booked
46 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - A , Phase - Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.4 Sq.mts. ( 758 Sq.ft. )50
RESIDENTIAL71.15 Sq.mts. ( 766 Sq.ft. )50
None Booked0% Booked
0% Booked
RESIDENTIAL106.25 Sq.mts. ( 1144 Sq.ft. )56
21 Booked37% Booked
37% Booked
156 total apartments / 24 apartments booked. 15% apartments booked.
Work Description in Building Wing - BCompletion
Basement (if any)
work-in-progress75% done
75% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress75% done
75% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - B, Phase-Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - B, Phase-Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL71.15 Sq.mts. ( 766 Sq.ft. )22
None Booked0% Booked
0% Booked
RESIDENTIAL74.4 Sq.mts. ( 801 Sq.ft. )23
None Booked0% Booked
0% Booked
RESIDENTIAL106.25 Sq.mts. ( 1144 Sq.ft. )24
None Booked0% Booked
0% Booked
69 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - B, Phase-Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - CJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL68.3 Sq.mts. ( 735 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )44
None Booked0% Booked
0% Booked
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )50
RESIDENTIAL86.7 Sq.mts. ( 933 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL87.2 Sq.mts. ( 939 Sq.ft. )50
156 total apartments / 10 apartments booked. 6% apartments booked.
Work Description in Building Wing - CCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - C, Phase-Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - C, Phase-Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL68.3 Sq.mts. ( 735 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )22
None Booked0% Booked
0% Booked
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )23
None Booked0% Booked
0% Booked
RESIDENTIAL86.7 Sq.mts. ( 933 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL87.2 Sq.mts. ( 939 Sq.ft. )22
None Booked0% Booked
0% Booked
69 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - C, Phase-Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing - D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - DJan 190029120600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )50
18 Booked36% Booked
36% Booked
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )28
21 Booked75% Booked
75% Booked
RESIDENTIAL77.65 Sq.mts. ( 836 Sq.ft. )28
106 total apartments / 40 apartments booked. 37% apartments booked.
Work Description in Building Wing - DCompletion
Basement (if any)
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing-D, Phase-Ii, 29Th To 40Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing-D, Phase-Ii, 29Th To 40Th FloorJan 190012000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL70.15 Sq.mts. ( 755 Sq.ft. )22
RESIDENTIAL74.85 Sq.mts. ( 806 Sq.ft. )12
None Booked0% Booked
0% Booked
RESIDENTIAL77.65 Sq.mts. ( 836 Sq.ft. )12
None Booked0% Booked
0% Booked
46 total apartments / 1 apartments booked. 2% apartments booked.
Work Description in Building Wing-D, Phase-Ii, 29Th To 40Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Whispering Tower-Abcd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation