Project overview

Wellwisher Town is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000000721. Wellwisher Town is located at 2480. This is a Ongoing being developed by Wellwisher Properties.

Wellwisher Town has 0 Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 918 of which 275 are currently available for sale.

Wellwisher Town is being developed on a total land area of 291704 Sq.ft. out of which 28678 Sq.ft. i.e 10% is reserved for recreational purposes. Wellwisher Town has 13 Wings / Towers Building No 1,Building No 10,Building No 11,Building No 2,Building No 3,Building No 4,Building No 5,Building No 6,Building No 7,Building No 8,Building No 9,Club House,Municipal Office

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Wellwisher Town
  • Location:
  • 2480
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Wellwisher Properties
  • Phone:
  • Address:
  • Shakti Arcade
Project RERA Details
MAHA REARA No: P52000000721
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect M/S. Destination Architecture Interior Designs
Funding Bank DCB BANK LIMITED
Proposed Possession 30 Dec 2025
Revised Possession 30 Dec 2025
Extended Possession
Litigations No Litigations
Last Modified 23 Jul 2017
Last Retrived 28 Jul 2025
Wellwisher Town QR Code
Wellwisher Town
MahaRERA - P52000000721
Apartment Details & Configuration
TypeArea
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )
2 bhK44.97 Sq.mts. ( 484 Sq.ft. )
shop9.33 Sq.mts. ( 100 Sq.ft. )
shop15.87 Sq.mts. ( 171 Sq.ft. )
shop16.49 Sq.mts. ( 177 Sq.ft. )
shop16.68 Sq.mts. ( 180 Sq.ft. )
shop20.01 Sq.mts. ( 215 Sq.ft. )
shop30.36 Sq.mts. ( 327 Sq.ft. )
1 BHK30.43 Sq.mts. ( 328 Sq.ft. )
2 BHK45.84 Sq.mts. ( 493 Sq.ft. )
1 BHK0 Sq.mts. ( 0 Sq.ft. )
shop45.35 Sq.mts. ( 488 Sq.ft. )
shop55.73 Sq.mts. ( 600 Sq.ft. )
shop69.62 Sq.mts. ( 749 Sq.ft. )
2 bhk45.08 Sq.mts. ( 485 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Wellwisher Townlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Yet Started
Community Buildings48% completed
48% Complete
48% Done
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
30% Done
Energy management30% completed
30% Complete
30% Done
Fire Protection And Fire Safety Requirements
Work Not Yet Started
Landscaping & Tree Planting
Work Not Yet Started
Open Parking
Work Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
100% Done
Solid Waste Management And Disposal
Work Not Yet Started
Storm Water Drains30% completed
30% Complete
30% Done
Street Lighting
Work Not Yet Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Yet Started
Water Conservation, Rain water Harvesting80% completed
80% Complete
80% Done
Water Supply
Work Not Yet Started
Buildings / Wings in Wellwisher Town
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Wellwisher Town by Wellwisher Propertieslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

291704 Sq. ft.

Project Area

28678 Sq. ft.

Recreational Open Space

Total 13

Wings / Towers in Project

Apartments Statistics

918 apartments in total
Total
918
Booked
643
Available
275

Saleable Area Statistics (Sq. ft.)

363142 Total
Total
363142
Booked
256714
Available
106428
Total 918 apartments in project. 643 apartments booked. 70% apartments booked.
Total 363142 Sq.ft. saleable area. 256714 saleable area booked.
71% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Dec 2024910104550
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 bhK44.97 Sq.mts. ( 484 Sq.ft. )32
32 Booked100% Booked
100% Booked
shop9.33 Sq.mts. ( 100 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop15.87 Sq.mts. ( 171 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop16.49 Sq.mts. ( 177 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop16.68 Sq.mts. ( 180 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop20.01 Sq.mts. ( 215 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop30.36 Sq.mts. ( 327 Sq.ft. )2
2 Booked100% Booked
100% Booked
76 total apartments / 76 apartments booked. 100% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 10Dec 202415101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.43 Sq.mts. ( 328 Sq.ft. )148
41 Booked27% Booked
27% Booked
2 BHK45.84 Sq.mts. ( 493 Sq.ft. )98
40 Booked40% Booked
40% Booked
246 total apartments / 81 apartments booked. 32% apartments booked.
Work Description in Building Building No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 11Dec 20240000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 11Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 202491010200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHk30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )32
32 Booked100% Booked
100% Booked
64 total apartments / 64 apartments booked. 100% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Dec 2024910102786
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 bhk30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )64
59 Booked92% Booked
92% Booked
96 total apartments / 91 apartments booked. 94% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Dec 2024910106830
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )32
23 Booked71% Booked
71% Booked
shop45.35 Sq.mts. ( 488 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop55.73 Sq.mts. ( 600 Sq.ft. )2
2 Booked100% Booked
100% Booked
shop69.62 Sq.mts. ( 749 Sq.ft. )2
2 Booked100% Booked
100% Booked
70 total apartments / 61 apartments booked. 87% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5Dec 202491010200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 bhk44.97 Sq.mts. ( 484 Sq.ft. )32
20 Booked62% Booked
62% Booked
64 total apartments / 52 apartments booked. 81% apartments booked.
Work Description in Building Building No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 6Dec 2024910105935
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )32
18 Booked56% Booked
56% Booked
64 total apartments / 50 apartments booked. 78% apartments booked.
Work Description in Building Building No 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 7Dec 2024910106692
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 bhk45.08 Sq.mts. ( 485 Sq.ft. )32
31 Booked96% Booked
96% Booked
64 total apartments / 63 apartments booked. 98% apartments booked.
Work Description in Building Building No 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 8Dec 2024910104692
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )32
30 Booked93% Booked
93% Booked
64 total apartments / 62 apartments booked. 96% apartments booked.
Work Description in Building Building No 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 9Dec 202415101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.43 Sq.mts. ( 328 Sq.ft. )110
43 Booked39% Booked
39% Booked
110 total apartments / 43 apartments booked. 39% apartments booked.
Work Description in Building Building No 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Club House

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Club HouseJan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Club HouseCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Municipal Office

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Municipal OfficeJan 190061010038
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Municipal OfficeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Wellwisher Properties
for Project
Wellwisher Town
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation