Project overview

Vrindawan Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015683. Vrindawan Residency is located at 13/1. This is a New being developed by Sankalp Developers.

Vrindawan Residency has 1 BHK & 2 BHK Apartments with carpet areas ranging from 307 to 434 Sq.ft. Carpet. The Project has total 58 of which 42 are currently available for sale.

Vrindawan Residency is being developed on a total land area of 15802 Sq.ft. Vrindawan Residency has 2 Wings / Towers A Building,B Building

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vrindawan Residency
  • Location:
  • 13/1
  • Const. Stage:
    New
  • Possession:
    28 Mar 2021
Developer Details

  • Developer:
    Sankalp Developers
  • Phone:
  • Address:
  • Vrindawan Residency
Project RERA Details
MAHA REARA No: P51700015683
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr Vaibhav Patil
Funding Bank THE KALYAN JANATA SAHAKARI BANK LTD.
Proposed Possession 28 Mar 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Mar 2018
Last Retrived 26 Jul 2025
Vrindawan Residency QR Code
Vrindawan Residency
MahaRERA - P51700015683
Apartment Details & Configuration
TypeArea
1 BHK28.5 Sq.mts. ( 307 Sq.ft. )
1 BHK29.2 Sq.mts. ( 314 Sq.ft. )
1RK18.76 Sq.mts. ( 202 Sq.ft. )
1RK22.5 Sq.mts. ( 242 Sq.ft. )
1RK23.33 Sq.mts. ( 251 Sq.ft. )
2 BHK40.3 Sq.mts. ( 434 Sq.ft. )
Shop6.61 Sq.mts. ( 71 Sq.ft. )
Shop8.98 Sq.mts. ( 97 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vrindawan Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Two Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank&Amp;Soak Pit Proposed To Install On Site
Solid Waste Management And Disposal
Dustbin
Storm Water Drains
Surface Drain Off
Street Lighting
Lighting To Surrounding
Treatment And Disposal Of Sewage And Sullage Water
Septic Tank&Amp;Soak Pit Proposed To Install On Site
Water Conservation, Rain water Harvesting
Rain Water Pipe Discharge From Terrace To Borewell
Water Supply50% completed
50% Complete
Municipal + Bore Well
Buildings / Wings in Vrindawan Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vrindawan Residency by Sankalp Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

15802 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

58 apartments in total
Total
58
Booked
16
Available
42

Saleable Area Statistics (Sq. ft.)

18604 Total
Total
18604
Booked
6328
Available
12276
Total 58 apartments in project. 16 apartments booked. 27% apartments booked.
Total 18604 Sq.ft. saleable area. 6328 saleable area booked.
34% area booked.

A Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A BuildingSep 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.5 Sq.mts. ( 307 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK29.2 Sq.mts. ( 314 Sq.ft. )8
None Booked0% Booked
0% Booked
1RK18.76 Sq.mts. ( 202 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK22.5 Sq.mts. ( 242 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK23.33 Sq.mts. ( 251 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK40.3 Sq.mts. ( 434 Sq.ft. )8
7 Booked87% Booked
87% Booked
Shop6.61 Sq.mts. ( 71 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop8.98 Sq.mts. ( 97 Sq.ft. )2
None Booked0% Booked
0% Booked
34 total apartments / 7 apartments booked. 20% apartments booked.
Work Description in Building A BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

B Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B BuildingSep 202051010019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.5 Sq.mts. ( 307 Sq.ft. )8
2 Booked25% Booked
25% Booked
1 BHK29.2 Sq.mts. ( 314 Sq.ft. )8
3 Booked37% Booked
37% Booked
2 BHK40.3 Sq.mts. ( 434 Sq.ft. )8
4 Booked50% Booked
50% Booked
24 total apartments / 9 apartments booked. 37% apartments booked.
Work Description in Building B BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sankalp Developers
for Project
Vrindawan Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation