Project overview

Vrindavan Home Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000033233. Vrindavan Home Phase 2 is located at 5/1/A/1. This is a New being developed by Shree Rujve Enterprises.

Vrindavan Home Phase 2 has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 196 to 400 Sq.ft. Carpet. The Project has total 171 of which 171 are currently available for sale.

Vrindavan Home Phase 2 is being developed on a total land area of 36382 Sq.ft. out of which 3638 Sq.ft. i.e 10% is reserved for recreational purposes. Vrindavan Home Phase 2 has 3 Wings / Towers Building A - Wing A2,Building A- Wing A1,Building B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vrindavan Home Phase 2
  • Location:
  • 5/1/A/1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Shree Rujve Enterprises
  • Phone:
  • Address:
  • Aditi Nirman, Nirman Nagari
Project RERA Details
MAHA REARA No: P52000033233
Project Type Others
RERA Project Status New
Architect The Design India
Funding Bank KARNATAKA BANK LIMITED
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Feb 2022
Last Retrived 28 Jul 2025
Vrindavan Home Phase 2 QR Code
Vrindavan Home Phase 2
MahaRERA - P52000033233
Apartment Details & Configuration
TypeArea
1 BHK24.63 Sq.mts. ( 265 Sq.ft. )
1 BHK25.29 Sq.mts. ( 272 Sq.ft. )
1 BHK25.33 Sq.mts. ( 273 Sq.ft. )
1 BHK25.68 Sq.mts. ( 276 Sq.ft. )
1 BHK28.09 Sq.mts. ( 302 Sq.ft. )
1 BHK28.33 Sq.mts. ( 305 Sq.ft. )
1 BHK28.69 Sq.mts. ( 309 Sq.ft. )
1 BHK28.96 Sq.mts. ( 312 Sq.ft. )
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )
2 BHK38.06 Sq.mts. ( 410 Sq.ft. )
1 BHK38.09 Sq.mts. ( 410 Sq.ft. )
1 BHK53.16 Sq.mts. ( 572 Sq.ft. )
Shop9.97 Sq.mts. ( 107 Sq.ft. )
Shop10.41 Sq.mts. ( 112 Sq.ft. )
Shop15.21 Sq.mts. ( 164 Sq.ft. )
1 BHK21.24 Sq.mts. ( 229 Sq.ft. )
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )
1 BHK24.7 Sq.mts. ( 266 Sq.ft. )
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )
1 BHK24.86 Sq.mts. ( 268 Sq.ft. )
1 BHK24.88 Sq.mts. ( 268 Sq.ft. )
1 BHK25.11 Sq.mts. ( 270 Sq.ft. )
1 BHK25.37 Sq.mts. ( 273 Sq.ft. )
1 BHK25.43 Sq.mts. ( 274 Sq.ft. )
1 BHK26.73 Sq.mts. ( 288 Sq.ft. )
1 BHK26.81 Sq.mts. ( 289 Sq.ft. )
1 BHK27.9 Sq.mts. ( 300 Sq.ft. )
1RK18.2 Sq.mts. ( 196 Sq.ft. )
1RK19.32 Sq.mts. ( 208 Sq.ft. )
1RK19.71 Sq.mts. ( 212 Sq.ft. )
1RK19.9 Sq.mts. ( 214 Sq.ft. )
1RK20.61 Sq.mts. ( 222 Sq.ft. )
2 BHK37.2 Sq.mts. ( 400 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vrindavan Home Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Open Space
Community Buildings
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Room
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Plantation
Open Parking
Open Car And Scooter Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Terrace And Surface Drain
Street Lighting
Street Light
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Gram Panchayant And Boring
Buildings / Wings in Vrindavan Home Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vrindavan Home Phase 2 by Shree Rujve Enterpriseslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

36382 Sq. ft.

Project Area

3638 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

171 apartments in total
Total
171
Booked
0
Available
171

Saleable Area Statistics (Sq. ft.)

48767 Total
Total
48767
Booked
0
Available
48767
Total 171 apartments in project. 0 apartments booked. 0% apartments booked.
Total 48767 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building A - Wing A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building A - Wing A2Dec 20258101009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.63 Sq.mts. ( 265 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK25.29 Sq.mts. ( 272 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK25.33 Sq.mts. ( 273 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK25.68 Sq.mts. ( 276 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK28.09 Sq.mts. ( 302 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK28.33 Sq.mts. ( 305 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK28.69 Sq.mts. ( 309 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK28.96 Sq.mts. ( 312 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK38.06 Sq.mts. ( 410 Sq.ft. )7
None Booked0% Booked
0% Booked
60 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building A - Wing A2Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building A- Wing A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building A- Wing A1Dec 20267100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.09 Sq.mts. ( 410 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK53.16 Sq.mts. ( 572 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop9.97 Sq.mts. ( 107 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.41 Sq.mts. ( 112 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.21 Sq.mts. ( 164 Sq.ft. )1
None Booked0% Booked
0% Booked
9 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building A- Wing A1Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BDec 202581010421
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK21.24 Sq.mts. ( 229 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK24.7 Sq.mts. ( 266 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK24.86 Sq.mts. ( 268 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK24.88 Sq.mts. ( 268 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK25.11 Sq.mts. ( 270 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK25.37 Sq.mts. ( 273 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK25.43 Sq.mts. ( 274 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK26.73 Sq.mts. ( 288 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK26.81 Sq.mts. ( 289 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK27.9 Sq.mts. ( 300 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK18.2 Sq.mts. ( 196 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK19.32 Sq.mts. ( 208 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK19.71 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.9 Sq.mts. ( 214 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK20.61 Sq.mts. ( 222 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK37.2 Sq.mts. ( 400 Sq.ft. )7
None Booked0% Booked
0% Booked
102 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Rujve Enterprises
for Project
Vrindavan Home Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation