Project overview

Vivan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800035019. Vivan is located at Cts No 92 To 97. This is a New being developed by Goregaon Electrical Industries Llp.

Vivan has 1 BHK & 2 BHK Apartments with carpet areas ranging from 362 to 599 Sq.ft. Carpet. The Project has total 412 of which 343 are currently available for sale.

Vivan is being developed on a total land area of 52049 Sq.ft. out of which 9521 Sq.ft. i.e 18% is reserved for recreational purposes. Vivan has 5 Wings / Towers Sale Component In Rehab Building,Wing A,Wing B,Wing C,Wing D

ProjectDeveloperLocationPossession
Ekta Tripolis Phase IEkta Everglade Homes Private LimitedCts 22A/10 22A/11A, 22A/14 Pt, 2601/130-06-2021 00:00:00
Aspen ParkMessrs. Unique Real Estate DevelopersCts No. 554/C30-12-2020 00:00:00
Sunteck City Avenue 1Sunteck Realty Limited112A31-03-2020 00:00:00
AthenaM/S. Sahajanand Developers26 Pt31-03-2020 00:00:00
AristaM/S. Sahajanand Developers26 Pt30-12-2022 00:00:00
Delta HouseRight Channel Construction Pvt Ltd223/1, Cts No 223A/130-12-2022 00:00:00
Project Details
  • Project:
    Vivan
  • Location:
  • Cts No 92 To 97
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Goregaon Electrical Industries Llp
  • Phone:
  • Address:
  • Gladdiola
Project RERA Details
MAHA REARA No: P51800035019
Project Type Others
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Oct 2023
Last Retrived 26 Jul 2025
Vivan QR Code
Vivan
MahaRERA - P51800035019
Apartment Details & Configuration
TypeArea
1 BHK29.18 Sq.mts. ( 314 Sq.ft. )
1 BHK29.25 Sq.mts. ( 315 Sq.ft. )
1 BHK29.33 Sq.mts. ( 316 Sq.ft. )
Shop10.71 Sq.mts. ( 115 Sq.ft. )
1 BHK35.31 Sq.mts. ( 380 Sq.ft. )
1 BHK35.44 Sq.mts. ( 381 Sq.ft. )
2 BHK53.44 Sq.mts. ( 575 Sq.ft. )
2 BHK54.94 Sq.mts. ( 591 Sq.ft. )
1 BHK38.79 Sq.mts. ( 418 Sq.ft. )
1 BHK39.01 Sq.mts. ( 420 Sq.ft. )
1 BHK33.6 Sq.mts. ( 362 Sq.ft. )
1 BHK35.25 Sq.mts. ( 379 Sq.ft. )
1 BHK35.75 Sq.mts. ( 385 Sq.ft. )
2 BHK55.63 Sq.mts. ( 599 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vivanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Layout Approval
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
As Per Moef Conditions
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
As Per Garden Department Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Moef Guidelines
Solid Waste Management And Disposal
As Per Moef Guidelines
Storm Water Drains
As Per Mcgm Guidelines
Street Lighting
As Per Layout Requirements
Treatment And Disposal Of Sewage And Sullage Water
As Per Moef Guidelines
Water Conservation, Rain water Harvesting
Rain Water Harvesting Tanks
Water Supply
As Per Mcgm/Sra Guidelines
Buildings / Wings in Vivan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vivan by Goregaon Electrical Industries Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

52049 Sq. ft.

Project Area

9521 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

412 apartments in total
Total
412
Booked
69
Available
343

Saleable Area Statistics (Sq. ft.)

179862 Total
Total
179862
Booked
31008
Available
148854
Total 412 apartments in project. 69 apartments booked. 16% apartments booked.
Total 179862 Sq.ft. saleable area. 31008 saleable area booked.
17% area booked.

Sale Component In Rehab Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Component In Rehab BuildingDec 202824110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.18 Sq.mts. ( 314 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK29.25 Sq.mts. ( 315 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK29.33 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.71 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sale Component In Rehab BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress97% done
97% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress97% done
97% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 202823120100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.31 Sq.mts. ( 380 Sq.ft. )42
None Booked0% Booked
0% Booked
1 BHK35.44 Sq.mts. ( 381 Sq.ft. )38
None Booked0% Booked
0% Booked
2 BHK53.44 Sq.mts. ( 575 Sq.ft. )21
None Booked0% Booked
0% Booked
2 BHK54.94 Sq.mts. ( 591 Sq.ft. )21
None Booked0% Booked
0% Booked
122 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202823120100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.79 Sq.mts. ( 418 Sq.ft. )61
None Booked0% Booked
0% Booked
1 BHK39.01 Sq.mts. ( 420 Sq.ft. )21
None Booked0% Booked
0% Booked
82 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 202623120100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.79 Sq.mts. ( 418 Sq.ft. )61
14 Booked22% Booked
22% Booked
1 BHK39.01 Sq.mts. ( 420 Sq.ft. )21
10 Booked47% Booked
47% Booked
82 total apartments / 24 apartments booked. 29% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 202623120100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.6 Sq.mts. ( 362 Sq.ft. )19
16 Booked84% Booked
84% Booked
1 BHK35.25 Sq.mts. ( 379 Sq.ft. )42
9 Booked21% Booked
21% Booked
1 BHK35.75 Sq.mts. ( 385 Sq.ft. )19
2 BHK55.63 Sq.mts. ( 599 Sq.ft. )42
19 Booked45% Booked
45% Booked
122 total apartments / 45 apartments booked. 36% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Goregaon Electrical Industries Llp
for Project
Vivan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation