Project overview

Vishwas Niketan By Viiaan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800033151. Vishwas Niketan By Viiaan is located at 146/25, 146/26. This is a New being developed by Somani Buildtech Llp.

Vishwas Niketan By Viiaan has 1 BHK, 1 BHK Rehab, 2 BHK & 2 BHK Rehab Apartments with carpet areas ranging from 379 to 685 Sq.ft. Carpet. The Project has total 46 of which 31 are currently available for sale.

Vishwas Niketan By Viiaan is being developed on a total land area of 9528 Sq.ft. Vishwas Niketan By Viiaan has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vishwas Niketan By Viiaan
  • Location:
  • 146/25, 146/26
  • Const. Stage:
    New
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Somani Buildtech Llp
  • Phone:
  • Address:
  • Silver Arch Ch
Project RERA Details
MAHA REARA No: P51800033151
Project Type Others
RERA Project Status New
Architect Suyog R Shet
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jun 2025
Last Retrived 26 Jul 2025
Vishwas Niketan By Viiaan QR Code
Vishwas Niketan By Viiaan
MahaRERA - P51800033151
Apartment Details & Configuration
TypeArea
1 BHK35.76 Sq.mts. ( 385 Sq.ft. )
1 BHK38.84 Sq.mts. ( 418 Sq.ft. )
1 BHK51.52 Sq.mts. ( 555 Sq.ft. )
1 BHK39.07 Sq.mts. ( 421 Sq.ft. )
1 BHK Rehab48.02 Sq.mts. ( 517 Sq.ft. )
2 BHK63.7 Sq.mts. ( 686 Sq.ft. )
2 BHK63.73 Sq.mts. ( 686 Sq.ft. )
Shop 151.19 Sq.mts. ( 551 Sq.ft. )
Shop 222.3 Sq.mts. ( 240 Sq.ft. )
Shop 313.38 Sq.mts. ( 144 Sq.ft. )
1 BHK38.34 Sq.mts. ( 413 Sq.ft. )
1 BHK41.38 Sq.mts. ( 445 Sq.ft. )
1 BHK41.53 Sq.mts. ( 447 Sq.ft. )
1 BHK43.36 Sq.mts. ( 467 Sq.ft. )
1 BHK Rehab35.19 Sq.mts. ( 379 Sq.ft. )
2 BHK58.94 Sq.mts. ( 634 Sq.ft. )
2 BHK63.64 Sq.mts. ( 685 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vishwas Niketan By Viiaanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Na
Open Parking
As Per Policy
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Policy
Water Supply
As Per Approval
Buildings / Wings in Vishwas Niketan By Viiaan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vishwas Niketan By Viiaan by Somani Buildtech Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9528 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

46 apartments in total
Total
46
Booked
15
Available
31

Saleable Area Statistics (Sq. ft.)

25041 Total
Total
25041
Booked
7282
Available
17759
Total 46 apartments in project. 15 apartments booked. 32% apartments booked.
Total 25041 Sq.ft. saleable area. 7282 saleable area booked.
29% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2024101000221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.76 Sq.mts. ( 385 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK38.84 Sq.mts. ( 418 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK51.52 Sq.mts. ( 555 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK39.07 Sq.mts. ( 421 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Rehab48.02 Sq.mts. ( 517 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Rehab51.52 Sq.mts. ( 555 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Rehab38.84 Sq.mts. ( 418 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK63.7 Sq.mts. ( 686 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK63.73 Sq.mts. ( 686 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK Rehab63.73 Sq.mts. ( 686 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK Rehab63.7 Sq.mts. ( 686 Sq.ft. )5
None Booked0% Booked
0% Booked
Shop 151.19 Sq.mts. ( 551 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 222.3 Sq.mts. ( 240 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop 313.38 Sq.mts. ( 144 Sq.ft. )1
1 Booked100% Booked
100% Booked
24 total apartments / 8 apartments booked. 33% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202491000319
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.34 Sq.mts. ( 413 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK41.38 Sq.mts. ( 445 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK41.53 Sq.mts. ( 447 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK43.36 Sq.mts. ( 467 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK Rehab41.53 Sq.mts. ( 447 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK Rehab38.34 Sq.mts. ( 413 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Rehab35.19 Sq.mts. ( 379 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK58.94 Sq.mts. ( 634 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK63.64 Sq.mts. ( 685 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK Rehab63.64 Sq.mts. ( 685 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK Rehab58.94 Sq.mts. ( 634 Sq.ft. )4
None Booked0% Booked
0% Booked
22 total apartments / 7 apartments booked. 31% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress45% done
45% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Somani Buildtech Llp
for Project
Vishwas Niketan By Viiaan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation