Project overview

Vishnubhuvan Chs Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009053. Vishnubhuvan Chs Ltd is located at 222Pt. This is a Ongoing being developed by Shree S S Developers Private Limited.

Vishnubhuvan Chs Ltd has 1 BHK REHAB Apartments with carpet areas ranging from 300 to 300 Sq.ft. Carpet. The Project has total 177 of which 2 are currently available for sale.

Vishnubhuvan Chs Ltd is being developed on a total land area of 19770 Sq.ft. out of which 1152 Sq.ft. i.e 6% is reserved for recreational purposes. Vishnubhuvan Chs Ltd has 3 Wings / Towers Composite Bldg,Shree Samarth Verbesina,Vishnu Bhuvan Chs Rehab Bldg No 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vishnubhuvan Chs Ltd
  • Location:
  • 222Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Shree S S Developers Private Limited
  • Phone:
  • Address:
  • Shree Harihar Residency
Project RERA Details
MAHA REARA No: P51800009053
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Design Crest
Funding Bank DOMBIVLI NAGARI SAHAKARI BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 21 Nov 2020
Last Retrived 26 Jul 2025
Vishnubhuvan Chs Ltd QR Code
Vishnubhuvan Chs Ltd
MahaRERA - P51800009053
Apartment Details & Configuration
TypeArea
1 BHK REHAB27.88 Sq.mts. ( 300 Sq.ft. )
1 BHK35.77 Sq.mts. ( 385 Sq.ft. )
1 BHK36.7 Sq.mts. ( 395 Sq.ft. )
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vishnubhuvan Chs Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Completed Before Occ
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Will Be Completed Before Occ Of Sale Wing
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Will Be Completed Before Occ
Landscaping & Tree Planting50% completed
50% Complete
Will Be Completed Before Occ
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Will Be Completed Before Occ
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting75% completed
75% Complete
Will Be Completed Before Occ
Water Supply
Will Be Completed Before Occ
Buildings / Wings in Vishnubhuvan Chs Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vishnubhuvan Chs Ltd by Shree S S Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

19770 Sq. ft.

Project Area

1152 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

177 apartments in total
Total
177
Booked
175
Available
2

Saleable Area Statistics (Sq. ft.)

56325 Total
Total
56325
Booked
55440
Available
885
Total 177 apartments in project. 175 apartments booked. 98% apartments booked.
Total 56325 Sq.ft. saleable area. 55440 saleable area booked.
98% area booked.

Composite Bldg

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Composite BldgJun 202213101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK REHAB27.88 Sq.mts. ( 300 Sq.ft. )71
71 Booked100% Booked
100% Booked
71 total apartments / 71 apartments booked. 100% apartments booked.
Work Description in Building Composite BldgCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shree Samarth Verbesina

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Samarth VerbesinaJun 202213101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.77 Sq.mts. ( 385 Sq.ft. )22
21 Booked95% Booked
95% Booked
1 BHK36.7 Sq.mts. ( 395 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )1
None Booked0% Booked
0% Booked
35 total apartments / 33 apartments booked. 94% apartments booked.
Work Description in Building Shree Samarth VerbesinaCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress97% done
97% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress97% done
97% Booked
Sanitary Fittings within the flats / premises
work-in-progress97% done
97% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress97% done
97% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vishnu Bhuvan Chs Rehab Bldg No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vishnu Bhuvan Chs Rehab Bldg No 2Jun 202213101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK REHAB27.88 Sq.mts. ( 300 Sq.ft. )71
71 Booked100% Booked
100% Booked
71 total apartments / 71 apartments booked. 100% apartments booked.
Work Description in Building Vishnu Bhuvan Chs Rehab Bldg No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree S S Developers Private Limited
for Project
Vishnubhuvan Chs Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.