Project overview

Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700004777. Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 is located at S No. 131 /1 And 132/2. This is a Ongoing being developed by Vishnu Group.

Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 has 1 BHK, 1 RK & 2 BHK Apartments with carpet areas ranging from 188 to 455 Sq.ft. Carpet. The Project has total 212 of which 30 are currently available for sale.

Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 is being developed on a total land area of 96768 Sq.ft. out of which 9655 Sq.ft. i.e 10% is reserved for recreational purposes. Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 has 3 Wings / Towers Vishnu Vatika Nx Wing C1,Vishnu Vatika Nx Wing E1,Vishnu Vatika Nx Wing E2

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Project Details
  • Project:
    Vishnu Vatika Nx Wing C1 E1 E2 Phase 1
  • Location:
  • S No. 131 /1 And 132/2
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2023
Developer Details

  • Developer:
    Vishnu Group
  • Phone:
  • Address:
  • Shree Samarth Prasad
Project RERA Details
MAHA REARA No: P51700004777
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect M Square Architect Prop Mukesh B More
Funding Bank DOMBIVLI NAGARI SAHAKARI BANK LIMITED
Proposed Possession 30 Oct 2023
Revised Possession 30 Oct 2023
Extended Possession
Litigations No Litigations
Last Modified 13 Oct 2022
Last Retrived 26 Jul 2025
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 QR Code
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1
MahaRERA - P51700004777
Apartment Details & Configuration
TypeArea
1 BHK25.86 Sq.mts. ( 278 Sq.ft. )
1 BHK26.88 Sq.mts. ( 289 Sq.ft. )
1 BHK27.27 Sq.mts. ( 294 Sq.ft. )
1 RK18.99 Sq.mts. ( 204 Sq.ft. )
1 RK21.84 Sq.mts. ( 235 Sq.ft. )
1 BHK28.3 Sq.mts. ( 305 Sq.ft. )
1 BHK28.33 Sq.mts. ( 305 Sq.ft. )
1 RK17.49 Sq.mts. ( 188 Sq.ft. )
1 RK20.25 Sq.mts. ( 218 Sq.ft. )
2 BHK35.03 Sq.mts. ( 377 Sq.ft. )
2 BHK37.67 Sq.mts. ( 405 Sq.ft. )
2 BHK41.73 Sq.mts. ( 449 Sq.ft. )
2 BHK41.87 Sq.mts. ( 451 Sq.ft. )
2 BHK42.27 Sq.mts. ( 455 Sq.ft. )
2 BHK37.54 Sq.mts. ( 404 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vishnu Vatika Nx Wing C1 E1 E2 Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space20% completed
20% Complete
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements25% completed
25% Complete
Wip
Landscaping & Tree Planting45% completed
45% Complete
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains70% completed
70% Complete
Wip
Street Lighting40% completed
40% Complete
Wip
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting35% completed
35% Complete
Wip
Water Supply80% completed
80% Complete
Wip
Buildings / Wings in Vishnu Vatika Nx Wing C1 E1 E2 Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vishnu Vatika Nx Wing C1 E1 E2 Phase 1 by Vishnu Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

96768 Sq. ft.

Project Area

9655 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

212 apartments in total
Total
212
Booked
182
Available
30

Saleable Area Statistics (Sq. ft.)

71724 Total
Total
71724
Booked
59933
Available
11791
Total 212 apartments in project. 182 apartments booked. 85% apartments booked.
Total 71724 Sq.ft. saleable area. 59933 saleable area booked.
84% area booked.

Vishnu Vatika Nx Wing C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vishnu Vatika Nx Wing C1Oct 20228101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.86 Sq.mts. ( 278 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK26.88 Sq.mts. ( 289 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK27.27 Sq.mts. ( 294 Sq.ft. )14
13 Booked92% Booked
92% Booked
1 RK18.99 Sq.mts. ( 204 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 RK21.84 Sq.mts. ( 235 Sq.ft. )16
16 Booked100% Booked
100% Booked
63 total apartments / 62 apartments booked. 98% apartments booked.
Work Description in Building Vishnu Vatika Nx Wing C1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vishnu Vatika Nx Wing E1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vishnu Vatika Nx Wing E1Oct 202213101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.3 Sq.mts. ( 305 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK28.33 Sq.mts. ( 305 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 RK17.49 Sq.mts. ( 188 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 RK20.25 Sq.mts. ( 218 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK35.03 Sq.mts. ( 377 Sq.ft. )13
10 Booked76% Booked
76% Booked
2 BHK37.67 Sq.mts. ( 405 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK41.73 Sq.mts. ( 449 Sq.ft. )11
6 Booked54% Booked
54% Booked
2 BHK41.87 Sq.mts. ( 451 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK42.27 Sq.mts. ( 455 Sq.ft. )7
5 Booked71% Booked
71% Booked
74 total apartments / 62 apartments booked. 83% apartments booked.
Work Description in Building Vishnu Vatika Nx Wing E1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress62% done
62% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress62% done
62% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress86% done
86% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vishnu Vatika Nx Wing E2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vishnu Vatika Nx Wing E2Oct 202213100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.3 Sq.mts. ( 305 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK28.33 Sq.mts. ( 305 Sq.ft. )11
9 Booked81% Booked
81% Booked
1 RK17.49 Sq.mts. ( 188 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 RK20.25 Sq.mts. ( 218 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK35.03 Sq.mts. ( 377 Sq.ft. )12
8 Booked66% Booked
66% Booked
2 BHK37.54 Sq.mts. ( 404 Sq.ft. )13
11 Booked84% Booked
84% Booked
2 BHK41.73 Sq.mts. ( 449 Sq.ft. )15
10 Booked66% Booked
66% Booked
2 BHK41.87 Sq.mts. ( 451 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK42.27 Sq.mts. ( 455 Sq.ft. )5
4 Booked80% Booked
80% Booked
75 total apartments / 58 apartments booked. 77% apartments booked.
Work Description in Building Vishnu Vatika Nx Wing E2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress62% done
62% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress62% done
62% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress86% done
86% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer