Project overview

Virat Vastu is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700002467. Virat Vastu is located at 71 2A/2B. This is a Ongoing being developed by Shreeji Realty.

Virat Vastu has 1 BHKTYPEC, 1 BHKTYPEI, 1 BHKTYPEJ, 1 BHKTYPEM & 2 BHKTYPEG Apartments with carpet areas ranging from 376 to 451 Sq.ft. Carpet. The Project has total 146 of which 56 are currently available for sale.

Virat Vastu is being developed on a total land area of 46500 Sq.ft. out of which 5323 Sq.ft. i.e 11% is reserved for recreational purposes. Virat Vastu has 4 Wings / Towers 1,2,3,4

ProjectDeveloperLocationPossession
Neptune Swarajya Sector 1- A15Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B9Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B6Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya 4BNeptune Developers LimitedS Nos 873, 430-12-2027 00:00:00
Neptune Swarajya Sector 2 - B3Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B8Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 1-A4Neptune Developers LimitedS No 13, 2330-06-2018 00:00:00
Neptune Swarajya Sector 1- A14Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B 19Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B10Neptune Developers LtdS No 1/3 S No 2/3, 431-12-2018 00:00:00
Neptune Swarajya Sector 2 - 2BNeptune Developers LtdS No 1/3, 2/3, 431-12-2018 00:00:00
Falco RivershireAanya RealtorsThane, 42110230-09-2016 00:00:00
Neptune Swarajya Sector 2 - B4Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B15 And B17Neptune Developers LtdS N 1/3 S No 2/3, 431-12-2018 00:00:00
Neptune Swarajya Sector 1-A5Neptune Developers LimitedS No 13, No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B11Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 1-A13Neptune Developers LimitedS No 13, No 2330-06-2018 00:00:00
Falco PearlshireAanya Residences37/3A P30-12-2022 00:00:00
Neptune Swarajya Sector 1- A17Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarjaya Sector 1- A18Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 1-A2Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B16Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 1-A3Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 1 - 1ANeptune Developers LimitedS No 13, No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B5Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Virat VastuShreeji Realty71 2A/2B31-12-2018 00:00:00
Neptune Swarajya Sector 2 - 1BNeptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B 14Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 1- A16Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B12Neptune Developers LtdS No 1/3 S No 2/3, 431-12-2018 00:00:00
Neptune Swarajya Sector 2 - B18Neptune Developers LtdS No 1/3 S No 2/3, 431-12-2018 00:00:00
Project Details
  • Project:
    Virat Vastu
  • Location:
  • 71 2A/2B
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Shreeji Realty
  • Phone:
  • Address:
  • Riddhi Siddhi Chs
Project RERA Details
MAHA REARA No: P51700002467
Project Type Others
RERA Project Status Ongoing
Architect Creations Inc
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 01 Aug 2017
Last Retrived 26 Jul 2025
Virat Vastu QR Code
Virat Vastu
MahaRERA - P51700002467
Apartment Details & Configuration
TypeArea
1 BHKTYPEA37.1 Sq.mts. ( 399 Sq.ft. )
1 BHKTYPEB37.4 Sq.mts. ( 403 Sq.ft. )
1 BHKTYPEC35.13 Sq.mts. ( 378 Sq.ft. )
1RK26.2 Sq.mts. ( 282 Sq.ft. )
2 BHKTYPED46.43 Sq.mts. ( 500 Sq.ft. )
Shop No 19.99 Sq.mts. ( 108 Sq.ft. )
Shop No 313.84 Sq.mts. ( 149 Sq.ft. )
Shop no 511.47 Sq.mts. ( 123 Sq.ft. )
shop no.212.4 Sq.mts. ( 133 Sq.ft. )
1 BHKTYPEE35.99 Sq.mts. ( 387 Sq.ft. )
1 BHKTYPEF34.07 Sq.mts. ( 367 Sq.ft. )
2 BHKTYPEG41.88 Sq.mts. ( 451 Sq.ft. )
2 BHKTYPEH47.1 Sq.mts. ( 507 Sq.ft. )
2 BHKTYPEK49.75 Sq.mts. ( 536 Sq.ft. )
1 BHKTYPEC35.15 Sq.mts. ( 378 Sq.ft. )
1 BHKTYPEI37.38 Sq.mts. ( 402 Sq.ft. )
1 BHKTYPEJ34.92 Sq.mts. ( 376 Sq.ft. )
1 BHKTYPEM35.81 Sq.mts. ( 385 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Virat Vastulast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Done
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply95% completed
95% Complete
Done
Buildings / Wings in Virat Vastu
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Virat Vastu by Shreeji Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

46500 Sq. ft.

Project Area

5323 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

146 apartments in total
Total
146
Booked
90
Available
56

Saleable Area Statistics (Sq. ft.)

57832 Total
Total
57832
Booked
36022
Available
21810
Total 146 apartments in project. 90 apartments booked. 61% apartments booked.
Total 57832 Sq.ft. saleable area. 36022 saleable area booked.
62% area booked.

1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1Dec 201811109009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPEA37.1 Sq.mts. ( 399 Sq.ft. )20
1 BHKTYPEB37.4 Sq.mts. ( 403 Sq.ft. )10
2 Booked20% Booked
20% Booked
1 BHKTYPEC35.13 Sq.mts. ( 378 Sq.ft. )10
4 Booked40% Booked
40% Booked
1RK26.2 Sq.mts. ( 282 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHKTYPED46.43 Sq.mts. ( 500 Sq.ft. )10
5 Booked50% Booked
50% Booked
Shop No 19.99 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop No 313.84 Sq.mts. ( 149 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop no 413.84 Sq.mts. ( 149 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop no 511.47 Sq.mts. ( 123 Sq.ft. )1
None Booked0% Booked
0% Booked
shop no.212.4 Sq.mts. ( 133 Sq.ft. )1
None Booked0% Booked
0% Booked
56 total apartments / 15 apartments booked. 26% apartments booked.
Work Description in Building 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
2Dec 20188107006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPEE35.99 Sq.mts. ( 387 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHKTYPEF34.07 Sq.mts. ( 367 Sq.ft. )15
13 Booked86% Booked
86% Booked
2 BHKTYPEG41.88 Sq.mts. ( 451 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHKTYPEH47.1 Sq.mts. ( 507 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHKTYPEK49.75 Sq.mts. ( 536 Sq.ft. )1
None Booked0% Booked
0% Booked
30 total apartments / 24 apartments booked. 80% apartments booked.
Work Description in Building 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
3Dec 20188107006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPEE35.99 Sq.mts. ( 387 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHKTYPEF34.07 Sq.mts. ( 367 Sq.ft. )22
19 Booked86% Booked
86% Booked
2 BHKTYPEG41.88 Sq.mts. ( 451 Sq.ft. )6
4 Booked66% Booked
66% Booked
30 total apartments / 25 apartments booked. 83% apartments booked.
Work Description in Building 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
4Dec 20188107006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPEC35.15 Sq.mts. ( 378 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHKTYPEI37.38 Sq.mts. ( 402 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHKTYPEJ34.92 Sq.mts. ( 376 Sq.ft. )8
5 Booked62% Booked
62% Booked
1 BHKTYPEM35.81 Sq.mts. ( 385 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHKTYPEG41.88 Sq.mts. ( 451 Sq.ft. )6
5 Booked83% Booked
83% Booked
30 total apartments / 26 apartments booked. 86% apartments booked.
Work Description in Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shreeji Realty
for Project
Virat Vastu
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation