Project overview

Viraj Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700018145. Viraj Heights is located at Tika No 20 Part, City Survey No 1025 A Part. This is a New being developed by V-Raj Buildcon.

Viraj Heights has 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, OFFICE, Office, Shop & SHOP Apartments with carpet areas ranging from 1137 to 1061 Sq.ft. Carpet. The Project has total 364 of which 123 are currently available for sale.

Viraj Heights is being developed on a total land area of 62970 Sq.ft. Viraj Heights has 2 Wings / Towers Rehab Building,Viraj Heights

ProjectDeveloperLocationPossession
Sai ApartmentsGajanan Kotkar & Nandini Kotkar5931-12-2018 00:00:00
New Kirtikar ProposedChaturthi Developers40060201-07-2025 00:00:00
Shanti KunjShreyas Enterprises616,617,61831-12-2017 00:00:00
Manorama ChsRupa Properties & Securities Pvt. Ltd.Cts No 926 To 933 And 94231-12-2019 00:00:00
Vaikunth Cluster 4APiramal Estate Private Limited100/24-30,100/31A,31B31-07-2024 00:00:00
Suprabhat C.H.S. Ltd.Suprabhat Cooperative Housing Society LimitedCts 1732, Tika No 1331-05-2024 00:00:00
Diwa Swapna Co. Op. Housing SocietyL. K. RealtorsS/No.37/3, C.T.S No.366, 36731-07-2025 00:00:00
ShivkrupaAnant Arjun Madhavi3931-03-2018 00:00:00
Snehadeep Co-Operative Housing Society LtdJoshi EnterprisesSurvey No.8, Tikka No.2 Part Corresponding Totikka No.16, Cts No. 6031-12-2017 00:00:00
Redevelopment Of Manas ChsArvij Builders And Developers Private LimitedCts No 118/B Of Naupada, M G Road, Thane07-05-2022 00:00:00
Dreamland Co-Op. Hsg. Soc. Ltd.Vaastusukh DevelopersTika No.2130-12-2021 00:00:00
Viraj HeightsV-Raj BuildconTika No 20 Part, City Survey No 1025 A Part30-12-2026 00:00:00
Sandhya BuildingS D Bhalerao Constructions Pvt Ltd - Sandhya3 Cts No 27 Tikka No 2131-03-2019 00:00:00
Osho PrakashHarjeevan Dayaram Thakkar10431-03-2019 00:00:00
Sahakar NiwasJnm EnterprisesCts 147/2, Tika 12, Fp 262 Part31-08-2018 00:00:00
Laxmi KeshavAditya AssociatesTika No.22, Cts No. 63/2/A At Gokhale Road, Naupada Thane West31-12-2019 00:00:00
PrabhatSamay Homes423 To 42731-01-2021 00:00:00
Abhijeet Co-Op Hsg SocietyContinental Maniratna Builders &Amp; Developers400602, Thane30-11-2020 00:00:00
Project Details
  • Project:
    Viraj Heights
  • Location:
  • Tika No 20 Part, City Survey No 1025 A Part
  • Const. Stage:
    New
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    V-Raj Buildcon
  • Phone:
  • Address:
  • Lodha Supremus 2
Project RERA Details
MAHA REARA No: P51700018145
Project Type Others
RERA Project Status New
Architect Nexstep Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Aug 2023
Last Retrived 26 Jul 2025
Viraj Heights QR Code
Viraj Heights
MahaRERA - P51700018145
Apartment Details & Configuration
TypeArea
1 BHK27.88 Sq.mts. ( 300 Sq.ft. )
Shop11.31 Sq.mts. ( 122 Sq.ft. )
Shop11.84 Sq.mts. ( 127 Sq.ft. )
Shop11.92 Sq.mts. ( 128 Sq.ft. )
Shop12.12 Sq.mts. ( 130 Sq.ft. )
1 BHK37.43 Sq.mts. ( 403 Sq.ft. )
1 BHK40.09 Sq.mts. ( 432 Sq.ft. )
1 BHK40.22 Sq.mts. ( 433 Sq.ft. )
1 BHK40.5 Sq.mts. ( 436 Sq.ft. )
1 BHK42.43 Sq.mts. ( 457 Sq.ft. )
2 BHK53.56 Sq.mts. ( 577 Sq.ft. )
2 BHK53.57 Sq.mts. ( 577 Sq.ft. )
2 BHK55.16 Sq.mts. ( 594 Sq.ft. )
2 BHK55.19 Sq.mts. ( 594 Sq.ft. )
2 BHK55.2 Sq.mts. ( 594 Sq.ft. )
2 BHK56.07 Sq.mts. ( 604 Sq.ft. )
2 BHK57.53 Sq.mts. ( 619 Sq.ft. )
3 BHK96 Sq.mts. ( 1033 Sq.ft. )
3.5 BHK106.27 Sq.mts. ( 1144 Sq.ft. )
3.5 BHK95.78 Sq.mts. ( 1031 Sq.ft. )
OFFICE106.3 Sq.mts. ( 1144 Sq.ft. )
OFFICE98.54 Sq.mts. ( 1061 Sq.ft. )
OFFICE105.62 Sq.mts. ( 1137 Sq.ft. )
OFFICE106.01 Sq.mts. ( 1141 Sq.ft. )
OFFICE54.53 Sq.mts. ( 587 Sq.ft. )
Office45.91 Sq.mts. ( 494 Sq.ft. )
OFFICE72.21 Sq.mts. ( 777 Sq.ft. )
OFFICE73 Sq.mts. ( 786 Sq.ft. )
Office38.28 Sq.mts. ( 412 Sq.ft. )
Office40.06 Sq.mts. ( 431 Sq.ft. )
Shop38.21 Sq.mts. ( 411 Sq.ft. )
Shop41.63 Sq.mts. ( 448 Sq.ft. )
Shop22.8 Sq.mts. ( 245 Sq.ft. )
Shop23.54 Sq.mts. ( 253 Sq.ft. )
Shop27.9 Sq.mts. ( 300 Sq.ft. )
SHOP89.92 Sq.mts. ( 968 Sq.ft. )
Shop47.98 Sq.mts. ( 516 Sq.ft. )
SHOP219.89 Sq.mts. ( 2367 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Viraj Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Done Prior To Oc
Energy management
Will Be Done Prior To Oc
Fire Protection And Fire Safety Requirements
Will Be Done Prior To Oc
Landscaping & Tree Planting
Will Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Done Prior To Oc
Solid Waste Management And Disposal
Will Be Done Prior To Oc
Storm Water Drains
Will Be Done Prior To Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Will Be Done Prior To Oc
Water Conservation, Rain water Harvesting
Will Be Done Prior To Oc
Water Supply
Will Be Done Prior To Oc
Buildings / Wings in Viraj Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Viraj Heights by V-Raj Buildconlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

62970 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

364 apartments in total
Total
364
Booked
241
Available
123

Saleable Area Statistics (Sq. ft.)

186936 Total
Total
186936
Booked
118120
Available
68816
Total 364 apartments in project. 241 apartments booked. 66% apartments booked.
Total 186936 Sq.ft. saleable area. 118120 saleable area booked.
63% area booked.

Rehab Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab BuildingAug 202430101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.88 Sq.mts. ( 300 Sq.ft. )62
56 Booked90% Booked
90% Booked
Shop11.31 Sq.mts. ( 122 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.84 Sq.mts. ( 127 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.92 Sq.mts. ( 128 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.12 Sq.mts. ( 130 Sq.ft. )1
None Booked0% Booked
0% Booked
66 total apartments / 57 apartments booked. 86% apartments booked.
Work Description in Building Rehab BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress43% done
43% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Viraj Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Viraj HeightsDec 202544111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.43 Sq.mts. ( 403 Sq.ft. )35
19 Booked54% Booked
54% Booked
1 BHK40.09 Sq.mts. ( 432 Sq.ft. )27
14 Booked51% Booked
51% Booked
1 BHK40.22 Sq.mts. ( 433 Sq.ft. )34
14 Booked41% Booked
41% Booked
1 BHK40.5 Sq.mts. ( 436 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK42.43 Sq.mts. ( 457 Sq.ft. )16
14 Booked87% Booked
87% Booked
2 BHK53.56 Sq.mts. ( 577 Sq.ft. )10
9 Booked90% Booked
90% Booked
2 BHK53.57 Sq.mts. ( 577 Sq.ft. )19
19 Booked100% Booked
100% Booked
2 BHK55.16 Sq.mts. ( 594 Sq.ft. )17
9 Booked52% Booked
52% Booked
2 BHK55.19 Sq.mts. ( 594 Sq.ft. )24
13 Booked54% Booked
54% Booked
2 BHK55.2 Sq.mts. ( 594 Sq.ft. )27
14 Booked51% Booked
51% Booked
2 BHK56.07 Sq.mts. ( 604 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK57.53 Sq.mts. ( 619 Sq.ft. )19
13 Booked68% Booked
68% Booked
3 BHK96 Sq.mts. ( 1033 Sq.ft. )7
3.5 BHK106.27 Sq.mts. ( 1144 Sq.ft. )2
1 Booked50% Booked
50% Booked
3.5 BHK95.78 Sq.mts. ( 1031 Sq.ft. )5
1 Booked20% Booked
20% Booked
OFFICE106.3 Sq.mts. ( 1144 Sq.ft. )3
2 Booked66% Booked
66% Booked
OFFICE98.54 Sq.mts. ( 1061 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE105.62 Sq.mts. ( 1137 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE106.01 Sq.mts. ( 1141 Sq.ft. )3
None Booked0% Booked
0% Booked
OFFICE54.53 Sq.mts. ( 587 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office45.91 Sq.mts. ( 494 Sq.ft. )3
2 Booked66% Booked
66% Booked
OFFICE72.21 Sq.mts. ( 777 Sq.ft. )4
2 Booked50% Booked
50% Booked
OFFICE73 Sq.mts. ( 786 Sq.ft. )4
2 Booked50% Booked
50% Booked
Office38.28 Sq.mts. ( 412 Sq.ft. )4
3 Booked75% Booked
75% Booked
Office40.06 Sq.mts. ( 431 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop38.21 Sq.mts. ( 411 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop41.63 Sq.mts. ( 448 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.8 Sq.mts. ( 245 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.54 Sq.mts. ( 253 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.9 Sq.mts. ( 300 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP89.92 Sq.mts. ( 968 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop47.98 Sq.mts. ( 516 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP219.89 Sq.mts. ( 2367 Sq.ft. )1
1 Booked100% Booked
100% Booked
298 total apartments / 184 apartments booked. 61% apartments booked.
Work Description in Building Viraj HeightsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress34% done
34% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress37% done
37% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress37% done
37% Booked
Channel Partners
Channel Partners Registered by Developer
V-Raj Buildcon
for Project
Viraj Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation