Project overview

Vijay Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700008755. Vijay Enclave is located at S No 141/2Pt S No 141/3Pt S No 208/1 Pt. This is a Ongoing being developed by Vijay Citispace Pvt. Ltd..

Vijay Enclave has 2 BHK Apartments with carpet areas ranging from 673 to 750 Sq.ft. Carpet. The Project has total 376 of which 296 are currently available for sale.

Vijay Enclave is being developed on a total land area of 14367 Sq.ft. out of which 23182 Sq.ft. i.e 161% is reserved for recreational purposes. Vijay Enclave has 4 Wings / Towers Building No 4 Floor 1 To 30,Building No 4 Floor 31 To 40,Building No 5 Floor 1 To 30,Building No 5 Floor 31 To 40

ProjectDeveloperLocationPossession
Jangid Galaxy Tower 2Jangid Contructions199/730-04-2019 00:00:00
Pataskar Eclat Building No 3Pataskar Developers Pvt. Ltd40060231-12-2017 00:00:00
Platinum HeritageDarshan Sagar Developers136/1, 137/6, 137/1131-05-2018 00:00:00
One Park Avenue - Avenue 1Purva Oak Private LimitedS No 114/4 115/230-12-2023 00:00:00
One Park Avenue - Avenue 6Purva Oak Private LimitedS No 115/230-12-2023 00:00:00
Manhattan Phase 2Sai Uma Construction Private Limited128/1,128/2,128/3,129/1A,129/1B,129/2/1,129/2/2,129/2/3,129/2/4,129/2/5,129/2/6,129/2/7,129/2/8,129/2/9,129/3,129/4A,130/1,130/230-12-2023 00:00:00
AthenaRoma Builders Private Limited176/330-12-2022 00:00:00
BarcaRoma Builders Private Limited175/4, 175/6 And 176/330-12-2022 00:00:00
Garden Court Type B2Deeaardee Enterprises129/A And 131/1 And 131/331-12-2019 00:00:00
Jangid Galaxy Tower 7Jangid Contructions400607, Thane30-12-2022 00:00:00
Hill Spring Phase 1Velocity185/2, 185/330-06-2018 00:00:00
Unique GreenMadhu Harshad DoshiOld S No 166 H No 15Pt 16Pt 23Pt 25Pt 26Pt 27Pt 28Pt 32Pt 33Pt30-06-2018 00:00:00
Surendra VillaShivkrupa Construction And Developers Pvt LtdSurvey No. 190/2A15-07-2021 00:00:00
Bhoomi Acres M WingV R Constructors Private LimitedS.No.-223H 1 And 230-12-2021 00:00:00
ChestertonRoma Builders Private Limited123/17A, 123/17B30-03-2023 00:00:00
Manhattan Phase 1Sai Uma Construction Private Limited128/1,128/2,128/3,129/1A,129/1B,129/2/1,129/2/2,129/2/3,129/2/4,129/2/5,129/2/6,129/2/7,129/2/8,129/2/9,129/3,129/4A,130/1,130/230-06-2022 00:00:00
ElcantoDedhia Builders And Developers (India) LlpS.No 145 H.No B/1, B/2, B/330-06-2018 00:00:00
PearlSagar Enterprise190/3/B31-08-2019 00:00:00
ZeniaRoma Builders Private LimitedVillage Kolshet S Nos 153/3, 155/2 Pt New S Nos 155/2B And 156/1Pt New S No 156/1D31-12-2018 00:00:00
Silver Oak At Prestige ResidencyPrescon Realtors & Infrastructures Pvt. Ltd.147/3, 150, 15131-12-2019 00:00:00
Cosmos JewelsCosmos Lifestyle162/3, 162/9C,10 And Others31-03-2018 00:00:00
Rosa Oasis Phase 3Uma EnterprisesS.No. 124/2/3, 125/231-12-2017 00:00:00
Unique Green - MhadaMadhu Harshad DoshiOld S No 166 H No 15Pt 16Pt 23Pt 25Pt 26Pt 27Pt 28Pt 32Pt 33Pt30-06-2018 00:00:00
Jangid Galaxy Tower 3Jangid Contructions199/731-12-2018 00:00:00
Cosmos ClassiqueConcorde Builders120 3B 3D 140 6 140 7B 140 11A 11C 141 5B 141 6 2 140 631-12-2018 00:00:00
Hill SpringAsha InfratechThane31-12-2022 00:00:00
Horizon BhumiMajestic Horizon Bhumi DevelopersSurvey No 110 Of Hissa No 4A/131-03-2028 00:00:00
Hiranandani Westgate Phase 1Shoden Developers Private LimitedS.No. 138/2/15, 214/6, 214/8, 214/9A, 214/9B, 215/1, 215/2, 215/3A, 215/3B, 216/1, 216/2, 218/1, 218/2, 218/3, 218/4, 218/5, 218/6, 218/7, 219/1, 219/2, 219/3A, 219/3B, 219/4, 219/5, 219/6, 219/7, 220/1/A, 220/1/B, 220/2, 220/3, 220/4A, 220/4B, 220/5, 220/6, 221/1, 221/2, 222/1/A, 222/2/B, 222/2/C, 222/3, 222/4, 222/5, 222/6, 222/7, 222/8, 231/2/2/A, 231/2/2/B, 231/2/2/C, 231/2/2/D, 231/3/A, 231/3/B, 231/4, 231/6A, 231/6B, 232/1, 232/2, 232/3, 232/4, 232/5A, 232/5B31-10-2031 00:00:00
Falcon Building No 58Roma Builders Private LimitedS.No. 153/1, 155/1, 2A, 2B, 2C, 156/1B, 1C, 160/1, 2, 161/1/A, 161/2, 3, 162/1, 2, 163/1A, 1B, 163/2 & 276 Mouje Village Kolshet & S.No. 119/1, 2A, 2B, 119/3, 121, 122/2, 3, 430-04-2028 00:00:00
Raunak ImperialRaunak Avenue Realty176/831-12-2026 00:00:00
Project Details
  • Project:
    Vijay Enclave
  • Location:
  • S No 141/2Pt S No 141/3Pt S No 208/1 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Mar 2025
Developer Details

  • Developer:
    Vijay Citispace Pvt. Ltd.
  • Phone:
  • Address:
  • Marine Chambers,
Project RERA Details
MAHA REARA No: P51700008755
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Saakaar Architects
Funding Bank HDFC BANK
Proposed Possession 30 Mar 2025
Revised Possession 30 Mar 2025
Extended Possession
Litigations No Litigations
Last Modified 19 Aug 2017
Last Retrived 26 Jul 2025
Vijay Enclave QR Code
Vijay Enclave
MahaRERA - P51700008755
Apartment Details & Configuration
TypeArea
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )
1 BHK37.8 Sq.mts. ( 407 Sq.ft. )
1 BHK40.36 Sq.mts. ( 434 Sq.ft. )
2 BHK62.51 Sq.mts. ( 673 Sq.ft. )
2 BHK69.69 Sq.mts. ( 750 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vijay Enclavelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Rg Development As Per Thane Municipal Corp. Plan
Common amenities like Gym Common room games room reading room senior citizen party room
At 1St Floor Amenity Area Common For Both Bldgs
Community Buildings15% completed
15% Complete
Clubhouse Is Proposed And Common For Layout
Electrical Meter Room, Sub-Station, Receiving Station
Common For Layout
Energy management
Common For Both The Buildings
Fire Protection And Fire Safety Requirements
Common For Both The Bldgs As Per Cfo Noc
Landscaping & Tree Planting62% completed
62% Complete
Refurbishment To Be Done For Part Area
Open Parking
Not Yet Commenced
Sewerage (Chamber, Lines, Septic Tank , STP)
Common Stp To Be Given For Both Buildings
Small area and childproof room with soft rubber flooring upto age of 5 years
At 1St Floor Amenity Area Common For Both Bldgs
Society office
As Per Approved Plan
Solid Waste Management And Disposal
Organic Waste Converter Shall Be Provided
Storm Water Drains
To Be Provided As Approved By Muni. Corporation
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Shall Be Used For Toilet Flushing And Gardening
Water Conservation, Rain water Harvesting
Common For Both The Buildings
Water Supply
To Be Given By Municipal Corporation After Oc
Wooden flooring for yoga OR meditation room and open space for gathering
At 1St Floor Amenity Area Common For Both Bldgs
Buildings / Wings in Vijay Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vijay Enclave by Vijay Citispace Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

14367 Sq. ft.

Project Area

23182 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

376 apartments in total
Total
376
Booked
80
Available
296

Saleable Area Statistics (Sq. ft.)

199276 Total
Total
199276
Booked
42936
Available
156340
Total 376 apartments in project. 80 apartments booked. 21% apartments booked.
Total 199276 Sq.ft. saleable area. 42936 saleable area booked.
22% area booked.

Building No 4 Floor 1 To 30

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4 Floor 1 To 30Mar 202431121167109
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )58
14 Booked24% Booked
24% Booked
1 BHK37.8 Sq.mts. ( 407 Sq.ft. )58
16 Booked27% Booked
27% Booked
1 BHK40.36 Sq.mts. ( 434 Sq.ft. )53
19 Booked35% Booked
35% Booked
169 total apartments / 49 apartments booked. 28% apartments booked.
Work Description in Building Building No 4 Floor 1 To 30Completion
Basement (if any)
work-in-progress30% done
30% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress30% done
30% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress30% done
30% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 4 Floor 31 To 40

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4 Floor 31 To 40Jan 1900100000063
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK37.8 Sq.mts. ( 407 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK40.36 Sq.mts. ( 434 Sq.ft. )18
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 4 Floor 31 To 40Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 5 Floor 1 To 30

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5 Floor 1 To 30Mar 202431121113107
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.51 Sq.mts. ( 673 Sq.ft. )53
2 BHK69.69 Sq.mts. ( 750 Sq.ft. )58
24 Booked41% Booked
41% Booked
111 total apartments / 31 apartments booked. 27% apartments booked.
Work Description in Building Building No 5 Floor 1 To 30Completion
Basement (if any)
Excavation
work-in-progress40% done
40% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 5 Floor 31 To 40

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5 Floor 31 To 40Jan 1900100000042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.51 Sq.mts. ( 673 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK69.69 Sq.mts. ( 750 Sq.ft. )20
None Booked0% Booked
0% Booked
38 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 5 Floor 31 To 40Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Vijay Citispace Pvt. Ltd.
for Project
Vijay Enclave
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation