Project overview

Vicinia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002564. Vicinia is located at 15E, 15A. This is a Ongoing being developed by Forbes & Company Limited.

Vicinia has RESIDENTIAL Apartments with carpet areas ranging from 671 to 671 Sq.ft. Carpet. The Project has total 588 of which 13 are currently available for sale.

Vicinia is being developed on a total land area of 293464 Sq.ft. out of which 60989 Sq.ft. i.e 21% is reserved for recreational purposes. Vicinia has 8 Wings / Towers Wing A,Wing B,Wing C,Wing D,Wing E,Wing F,Wing G,Wing H

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vicinia
  • Location:
  • 15E, 15A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Forbes & Company Limited
  • Phone:
  • Address:
  • Forbes Building
Project RERA Details
MAHA REARA No: P51800002564
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Brighton Architects India Pvt Ltd
Funding Bank AXIS BANK
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession 30 Jun 2023
Litigations No Litigations
Last Modified 12 Jul 2022
Last Retrived 26 Jul 2025
Vicinia QR Code
Vicinia
MahaRERA - P51800002564
Apartment Details & Configuration
TypeArea
RESIDENTIAL140.15 Sq.mts. ( 1509 Sq.ft. )
RESIDENTIAL140.81 Sq.mts. ( 1516 Sq.ft. )
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )
RESIDENTIAL89.9 Sq.mts. ( 968 Sq.ft. )
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )
RESIDENTIAL38.49 Sq.mts. ( 414 Sq.ft. )
RESIDENTIAL94.09 Sq.mts. ( 1013 Sq.ft. )
RESIDENTIAL106.47 Sq.mts. ( 1146 Sq.ft. )
RESIDENTIAL62.33 Sq.mts. ( 671 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vicinialast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space62% completed
62% Complete
Common For 8 Wings
Community Buildings35% completed
35% Complete
Club House Common For 8 Wings
Community Buildings Club House35% completed
35% Complete
Common For 8 Wings
Covered car parkings100% completed
95% Complete
955 Nos. Of Closed Car Parks
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Common Sub-Station Proposed For 8 Wings
Energy management77% completed
77% Complete
Common For 8 Wings
Fire Protection And Fire Safety Requirements63% completed
63% Complete
Common For 8 Wings
Landscaping & Tree Planting60% completed
60% Complete
Common For 8 Wings
Open Parking100% completed
95% Complete
169 Nos. Of Open Car Parks
Sewerage (Chamber, Lines, Septic Tank , STP)83% completed
83% Complete
Common For 8 Wings
Solid Waste Management And Disposal50% completed
50% Complete
Common For 8 Wings
Storm Water Drains63% completed
63% Complete
Common For 8 Wings
Street Lighting
Common For 8 Wings
Treatment And Disposal Of Sewage And Sullage Water80% completed
80% Complete
Common For 8 Wings
Water Conservation, Rain water Harvesting100% completed
95% Complete
Common For 8 Wings
Water Supply76% completed
76% Complete
Common For 8 Wings
Buildings / Wings in Vicinia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vicinia by Forbes & Company Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

293464 Sq. ft.

Project Area

60989 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

588 apartments in total
Total
588
Booked
575
Available
13

Saleable Area Statistics (Sq. ft.)

544470 Total
Total
544470
Booked
535229
Available
9241
Total 588 apartments in project. 575 apartments booked. 97% apartments booked.
Total 544470 Sq.ft. saleable area. 535229 saleable area booked.
98% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20212113101798
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL140.15 Sq.mts. ( 1509 Sq.ft. )34
34 Booked100% Booked
100% Booked
RESIDENTIAL140.81 Sq.mts. ( 1516 Sq.ft. )6
6 Booked100% Booked
100% Booked
40 total apartments / 40 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress97% done
97% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 20212113101798
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL140.15 Sq.mts. ( 1509 Sq.ft. )34
34 Booked100% Booked
100% Booked
RESIDENTIAL140.81 Sq.mts. ( 1516 Sq.ft. )6
6 Booked100% Booked
100% Booked
40 total apartments / 40 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress97% done
97% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202122131022126
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )42
42 Booked100% Booked
100% Booked
RESIDENTIAL89.9 Sq.mts. ( 968 Sq.ft. )21
21 Booked100% Booked
100% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )18
18 Booked100% Booked
100% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
3 Booked100% Booked
100% Booked
84 total apartments / 84 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress97% done
97% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJun 202122131023126
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )42
42 Booked100% Booked
100% Booked
RESIDENTIAL89.9 Sq.mts. ( 968 Sq.ft. )21
21 Booked100% Booked
100% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )18
18 Booked100% Booked
100% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
3 Booked100% Booked
100% Booked
84 total apartments / 84 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress96% done
96% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress96% done
96% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJun 202122131026145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL38.49 Sq.mts. ( 414 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )40
40 Booked100% Booked
100% Booked
RESIDENTIAL94.09 Sq.mts. ( 1013 Sq.ft. )19
17 Booked89% Booked
89% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )18
17 Booked94% Booked
94% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
3 Booked100% Booked
100% Booked
82 total apartments / 77 apartments booked. 93% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress61% done
61% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress38% done
38% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress38% done
38% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress56% done
56% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress56% done
56% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress74% done
74% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress74% done
74% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress61% done
61% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FJun 202122131026149
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )40
40 Booked100% Booked
100% Booked
RESIDENTIAL94.09 Sq.mts. ( 1013 Sq.ft. )21
21 Booked100% Booked
100% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )16
16 Booked100% Booked
100% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL106.47 Sq.mts. ( 1146 Sq.ft. )2
2 Booked100% Booked
100% Booked
82 total apartments / 82 apartments booked. 100% apartments booked.
Work Description in Building Wing FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress91% done
91% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress91% done
91% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing GJun 202122131019107
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL62.33 Sq.mts. ( 671 Sq.ft. )88
84 Booked95% Booked
95% Booked
88 total apartments / 84 apartments booked. 95% apartments booked.
Work Description in Building Wing GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress73% done
73% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress33% done
33% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress33% done
33% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress58% done
58% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress58% done
58% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress74% done
74% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress74% done
74% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress73% done
73% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing HJun 202122131019106
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL62.33 Sq.mts. ( 671 Sq.ft. )88
84 Booked95% Booked
95% Booked
88 total apartments / 84 apartments booked. 95% apartments booked.
Work Description in Building Wing HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress54% done
54% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress29% done
29% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress29% done
29% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress54% done
54% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Forbes & Company Limited
for Project
Vicinia
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation